Relief material pre-storage management method and device thereof and electronic equipment
The invention provides a relief material pre-storage management method, and the method comprises the steps: obtaining the damage state information of a sample building after an earthquake and the attribute information of the sample building, constructing a post-earthquake prediction model through th...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUN JUNQING SHAN SUWAN TANG FANGYE |
description | The invention provides a relief material pre-storage management method, and the method comprises the steps: obtaining the damage state information of a sample building after an earthquake and the attribute information of the sample building, constructing a post-earthquake prediction model through the attribute information and the damage state information of the sample building, predicting the post-earthquake state of a target building through the post-earthquake model, in combination with the road network information of the area to which the target building belongs and the road network blocking state information of the post-earthquake state evaluation area of the target building, selecting a target path and nodes of the target path by using the road network blocking state information of the area, taking the selected nodes as places for pre-storing materials, and pre-storing the materials. A road network blocking state of a region is predicted in advance, and a target path is selected and materials are pre-sto |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113159397A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113159397A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113159397A3</originalsourceid><addsrcrecordid>eNqNiz0KAjEUBrexEPUOzwNsEYLIlrKsWFmIjdUSki9uIH8mT8_vKh7AamCYWTa3C7yDpaAYxSlPuaCtnIq6Y5ZxRkBkCuApGVLRkMHLaRBPKEj2q-ChuaToNOHxdPmzrJuFVb5i8-Oq2R6Ha39qkdOImpVGBI_9WQgpdp3s9gf5T_MG_ig6_g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Relief material pre-storage management method and device thereof and electronic equipment</title><source>esp@cenet</source><creator>SUN JUNQING ; SHAN SUWAN ; TANG FANGYE</creator><creatorcontrib>SUN JUNQING ; SHAN SUWAN ; TANG FANGYE</creatorcontrib><description>The invention provides a relief material pre-storage management method, and the method comprises the steps: obtaining the damage state information of a sample building after an earthquake and the attribute information of the sample building, constructing a post-earthquake prediction model through the attribute information and the damage state information of the sample building, predicting the post-earthquake state of a target building through the post-earthquake model, in combination with the road network information of the area to which the target building belongs and the road network blocking state information of the post-earthquake state evaluation area of the target building, selecting a target path and nodes of the target path by using the road network blocking state information of the area, taking the selected nodes as places for pre-storing materials, and pre-storing the materials. A road network blocking state of a region is predicted in advance, and a target path is selected and materials are pre-sto</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; HANDLING RECORD CARRIERS ; PHYSICS ; PRESENTATION OF DATA ; RECOGNITION OF DATA ; RECORD CARRIERS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210723&DB=EPODOC&CC=CN&NR=113159397A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210723&DB=EPODOC&CC=CN&NR=113159397A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN JUNQING</creatorcontrib><creatorcontrib>SHAN SUWAN</creatorcontrib><creatorcontrib>TANG FANGYE</creatorcontrib><title>Relief material pre-storage management method and device thereof and electronic equipment</title><description>The invention provides a relief material pre-storage management method, and the method comprises the steps: obtaining the damage state information of a sample building after an earthquake and the attribute information of the sample building, constructing a post-earthquake prediction model through the attribute information and the damage state information of the sample building, predicting the post-earthquake state of a target building through the post-earthquake model, in combination with the road network information of the area to which the target building belongs and the road network blocking state information of the post-earthquake state evaluation area of the target building, selecting a target path and nodes of the target path by using the road network blocking state information of the area, taking the selected nodes as places for pre-storing materials, and pre-storing the materials. A road network blocking state of a region is predicted in advance, and a target path is selected and materials are pre-sto</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>HANDLING RECORD CARRIERS</subject><subject>PHYSICS</subject><subject>PRESENTATION OF DATA</subject><subject>RECOGNITION OF DATA</subject><subject>RECORD CARRIERS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNiz0KAjEUBrexEPUOzwNsEYLIlrKsWFmIjdUSki9uIH8mT8_vKh7AamCYWTa3C7yDpaAYxSlPuaCtnIq6Y5ZxRkBkCuApGVLRkMHLaRBPKEj2q-ChuaToNOHxdPmzrJuFVb5i8-Oq2R6Ha39qkdOImpVGBI_9WQgpdp3s9gf5T_MG_ig6_g</recordid><startdate>20210723</startdate><enddate>20210723</enddate><creator>SUN JUNQING</creator><creator>SHAN SUWAN</creator><creator>TANG FANGYE</creator><scope>EVB</scope></search><sort><creationdate>20210723</creationdate><title>Relief material pre-storage management method and device thereof and electronic equipment</title><author>SUN JUNQING ; SHAN SUWAN ; TANG FANGYE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113159397A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>HANDLING RECORD CARRIERS</topic><topic>PHYSICS</topic><topic>PRESENTATION OF DATA</topic><topic>RECOGNITION OF DATA</topic><topic>RECORD CARRIERS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN JUNQING</creatorcontrib><creatorcontrib>SHAN SUWAN</creatorcontrib><creatorcontrib>TANG FANGYE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN JUNQING</au><au>SHAN SUWAN</au><au>TANG FANGYE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Relief material pre-storage management method and device thereof and electronic equipment</title><date>2021-07-23</date><risdate>2021</risdate><abstract>The invention provides a relief material pre-storage management method, and the method comprises the steps: obtaining the damage state information of a sample building after an earthquake and the attribute information of the sample building, constructing a post-earthquake prediction model through the attribute information and the damage state information of the sample building, predicting the post-earthquake state of a target building through the post-earthquake model, in combination with the road network information of the area to which the target building belongs and the road network blocking state information of the post-earthquake state evaluation area of the target building, selecting a target path and nodes of the target path by using the road network blocking state information of the area, taking the selected nodes as places for pre-storing materials, and pre-storing the materials. A road network blocking state of a region is predicted in advance, and a target path is selected and materials are pre-sto</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN113159397A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES HANDLING RECORD CARRIERS PHYSICS PRESENTATION OF DATA RECOGNITION OF DATA RECORD CARRIERS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Relief material pre-storage management method and device thereof and electronic equipment |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T17%3A43%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20JUNQING&rft.date=2021-07-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113159397A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |