Pine pile driving construction method under mud clay foundation condition

The invention provides a pine pile piling construction method under a mud clay foundation condition. According to the method, a steel casing with a clamping function is mounted on a front body of a hydraulic breaking hammer, and a drill rod of the hydraulic breaking hammer is located in the steel ca...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HE XINWU, LI TONGLAGA, WU HONG'EN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HE XINWU
LI TONGLAGA
WU HONG'EN
description The invention provides a pine pile piling construction method under a mud clay foundation condition. According to the method, a steel casing with a clamping function is mounted on a front body of a hydraulic breaking hammer, and a drill rod of the hydraulic breaking hammer is located in the steel casing and tightly abuts against the upper end of a pine pile; and in the pile driving process under the muddy clay foundation condition, the upper end of a pine pile is impacted through mechanical hydraulic pressure, the pine pile slowly sinks under the action of impact energy, the pine pile part sleeved with the steel casing is tightly connected with the steel casing, and it is ensured that the pine pile does not fall off from the hydraulic breaking hammer in the piling process. In the pile driving process, the pine pile is subjected to the circumferential constraint force of the steel casing, the problems of splitting and pile head damage cannot occur, construction is not affected by the external environment, cont
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113123340A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113123340A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113123340A3</originalsourceid><addsrcrecordid>eNrjZPAMyMxLVSjIzElVSCnKLMvMS1dIzs8rLikqTS7JzM9TyE0tychPUSjNS0ktUsgtTVFIzkmsVEjLBwokghUAVadkglg8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0NjQyNjYxMDRmBg1ABeFNRQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pine pile driving construction method under mud clay foundation condition</title><source>esp@cenet</source><creator>HE XINWU ; LI TONGLAGA ; WU HONG'EN</creator><creatorcontrib>HE XINWU ; LI TONGLAGA ; WU HONG'EN</creatorcontrib><description>The invention provides a pine pile piling construction method under a mud clay foundation condition. According to the method, a steel casing with a clamping function is mounted on a front body of a hydraulic breaking hammer, and a drill rod of the hydraulic breaking hammer is located in the steel casing and tightly abuts against the upper end of a pine pile; and in the pile driving process under the muddy clay foundation condition, the upper end of a pine pile is impacted through mechanical hydraulic pressure, the pine pile slowly sinks under the action of impact energy, the pine pile part sleeved with the steel casing is tightly connected with the steel casing, and it is ensured that the pine pile does not fall off from the hydraulic breaking hammer in the piling process. In the pile driving process, the pine pile is subjected to the circumferential constraint force of the steel casing, the problems of splitting and pile head damage cannot occur, construction is not affected by the external environment, cont</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210716&amp;DB=EPODOC&amp;CC=CN&amp;NR=113123340A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210716&amp;DB=EPODOC&amp;CC=CN&amp;NR=113123340A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HE XINWU</creatorcontrib><creatorcontrib>LI TONGLAGA</creatorcontrib><creatorcontrib>WU HONG'EN</creatorcontrib><title>Pine pile driving construction method under mud clay foundation condition</title><description>The invention provides a pine pile piling construction method under a mud clay foundation condition. According to the method, a steel casing with a clamping function is mounted on a front body of a hydraulic breaking hammer, and a drill rod of the hydraulic breaking hammer is located in the steel casing and tightly abuts against the upper end of a pine pile; and in the pile driving process under the muddy clay foundation condition, the upper end of a pine pile is impacted through mechanical hydraulic pressure, the pine pile slowly sinks under the action of impact energy, the pine pile part sleeved with the steel casing is tightly connected with the steel casing, and it is ensured that the pine pile does not fall off from the hydraulic breaking hammer in the piling process. In the pile driving process, the pine pile is subjected to the circumferential constraint force of the steel casing, the problems of splitting and pile head damage cannot occur, construction is not affected by the external environment, cont</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAMyMxLVSjIzElVSCnKLMvMS1dIzs8rLikqTS7JzM9TyE0tychPUSjNS0ktUsgtTVFIzkmsVEjLBwokghUAVadkglg8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0NjQyNjYxMDRmBg1ABeFNRQ</recordid><startdate>20210716</startdate><enddate>20210716</enddate><creator>HE XINWU</creator><creator>LI TONGLAGA</creator><creator>WU HONG'EN</creator><scope>EVB</scope></search><sort><creationdate>20210716</creationdate><title>Pine pile driving construction method under mud clay foundation condition</title><author>HE XINWU ; LI TONGLAGA ; WU HONG'EN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113123340A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>HE XINWU</creatorcontrib><creatorcontrib>LI TONGLAGA</creatorcontrib><creatorcontrib>WU HONG'EN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HE XINWU</au><au>LI TONGLAGA</au><au>WU HONG'EN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pine pile driving construction method under mud clay foundation condition</title><date>2021-07-16</date><risdate>2021</risdate><abstract>The invention provides a pine pile piling construction method under a mud clay foundation condition. According to the method, a steel casing with a clamping function is mounted on a front body of a hydraulic breaking hammer, and a drill rod of the hydraulic breaking hammer is located in the steel casing and tightly abuts against the upper end of a pine pile; and in the pile driving process under the muddy clay foundation condition, the upper end of a pine pile is impacted through mechanical hydraulic pressure, the pine pile slowly sinks under the action of impact energy, the pine pile part sleeved with the steel casing is tightly connected with the steel casing, and it is ensured that the pine pile does not fall off from the hydraulic breaking hammer in the piling process. In the pile driving process, the pine pile is subjected to the circumferential constraint force of the steel casing, the problems of splitting and pile head damage cannot occur, construction is not affected by the external environment, cont</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113123340A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pine pile driving construction method under mud clay foundation condition
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T12%3A30%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HE%20XINWU&rft.date=2021-07-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113123340A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true