Method for arranging advanced water exploration and drainage holes of water-rich soft-rock rapid tunneling roadway

The invention discloses a method for arranging advanced water exploration and drainage holes of a water-rich soft-rock rapid tunneling roadway. The method comprises the following steps of constructing a group of advanced water exploration and drainage holes every 50 m from a position of being 20 m a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU SHENGJIAN, HAN GANG, LYU YUGUANG, ZHANG WENYU, HE XIAOQING, WANG NA, DING XUEXIAN, ZHENG HUAIYOU, LI PENG, WANG YONGBAO, GUAN YANTAI, LI JUNCHUN, SHI TAOTAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU SHENGJIAN
HAN GANG
LYU YUGUANG
ZHANG WENYU
HE XIAOQING
WANG NA
DING XUEXIAN
ZHENG HUAIYOU
LI PENG
WANG YONGBAO
GUAN YANTAI
LI JUNCHUN
SHI TAOTAO
description The invention discloses a method for arranging advanced water exploration and drainage holes of a water-rich soft-rock rapid tunneling roadway. The method comprises the following steps of constructing a group of advanced water exploration and drainage holes every 50 m from a position of being 20 m away from a lower crossheading door. By using the method disclosed by the invention, the water-rich conditions in front of the roadway, at two sides of the roadway and at a roof can be detected, and safe and normal tunneling is ensured. 本发明公开了一种富水软岩快速掘进巷道超前探放水孔布置方法,包括步骤:下顺槽开门20m处开始,每50m施工一组超前探放水孔。本发明的方法能够探明巷道前方、两侧、顶板富水情况,确保安全、正常掘进。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113107455A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113107455A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113107455A3</originalsourceid><addsrcrecordid>eNqNzLEKwjAQgOEuDqK-w_kAAUstzlIUF53cy5Fc2mC4C5do9e1F9AGc_uXjn1d6pjKKAy8KqIo8BB4A3QPZkoMJCynQM0VRLEEYkB04xcA4EIwSKYP4rzMa7AhZfDEq9gaKKTgod2aKn6sKuglfy2rmMWZa_bqo1sfDtTsZStJTTmiJqfTdpa6berPbtu2--ce8AQULREU</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for arranging advanced water exploration and drainage holes of water-rich soft-rock rapid tunneling roadway</title><source>esp@cenet</source><creator>LIU SHENGJIAN ; HAN GANG ; LYU YUGUANG ; ZHANG WENYU ; HE XIAOQING ; WANG NA ; DING XUEXIAN ; ZHENG HUAIYOU ; LI PENG ; WANG YONGBAO ; GUAN YANTAI ; LI JUNCHUN ; SHI TAOTAO</creator><creatorcontrib>LIU SHENGJIAN ; HAN GANG ; LYU YUGUANG ; ZHANG WENYU ; HE XIAOQING ; WANG NA ; DING XUEXIAN ; ZHENG HUAIYOU ; LI PENG ; WANG YONGBAO ; GUAN YANTAI ; LI JUNCHUN ; SHI TAOTAO</creatorcontrib><description>The invention discloses a method for arranging advanced water exploration and drainage holes of a water-rich soft-rock rapid tunneling roadway. The method comprises the following steps of constructing a group of advanced water exploration and drainage holes every 50 m from a position of being 20 m away from a lower crossheading door. By using the method disclosed by the invention, the water-rich conditions in front of the roadway, at two sides of the roadway and at a roof can be detected, and safe and normal tunneling is ensured. 本发明公开了一种富水软岩快速掘进巷道超前探放水孔布置方法,包括步骤:下顺槽开门20m处开始,每50m施工一组超前探放水孔。本发明的方法能够探明巷道前方、两侧、顶板富水情况,确保安全、正常掘进。</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210713&amp;DB=EPODOC&amp;CC=CN&amp;NR=113107455A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210713&amp;DB=EPODOC&amp;CC=CN&amp;NR=113107455A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU SHENGJIAN</creatorcontrib><creatorcontrib>HAN GANG</creatorcontrib><creatorcontrib>LYU YUGUANG</creatorcontrib><creatorcontrib>ZHANG WENYU</creatorcontrib><creatorcontrib>HE XIAOQING</creatorcontrib><creatorcontrib>WANG NA</creatorcontrib><creatorcontrib>DING XUEXIAN</creatorcontrib><creatorcontrib>ZHENG HUAIYOU</creatorcontrib><creatorcontrib>LI PENG</creatorcontrib><creatorcontrib>WANG YONGBAO</creatorcontrib><creatorcontrib>GUAN YANTAI</creatorcontrib><creatorcontrib>LI JUNCHUN</creatorcontrib><creatorcontrib>SHI TAOTAO</creatorcontrib><title>Method for arranging advanced water exploration and drainage holes of water-rich soft-rock rapid tunneling roadway</title><description>The invention discloses a method for arranging advanced water exploration and drainage holes of a water-rich soft-rock rapid tunneling roadway. The method comprises the following steps of constructing a group of advanced water exploration and drainage holes every 50 m from a position of being 20 m away from a lower crossheading door. By using the method disclosed by the invention, the water-rich conditions in front of the roadway, at two sides of the roadway and at a roof can be detected, and safe and normal tunneling is ensured. 本发明公开了一种富水软岩快速掘进巷道超前探放水孔布置方法,包括步骤:下顺槽开门20m处开始,每50m施工一组超前探放水孔。本发明的方法能够探明巷道前方、两侧、顶板富水情况,确保安全、正常掘进。</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzLEKwjAQgOEuDqK-w_kAAUstzlIUF53cy5Fc2mC4C5do9e1F9AGc_uXjn1d6pjKKAy8KqIo8BB4A3QPZkoMJCynQM0VRLEEYkB04xcA4EIwSKYP4rzMa7AhZfDEq9gaKKTgod2aKn6sKuglfy2rmMWZa_bqo1sfDtTsZStJTTmiJqfTdpa6berPbtu2--ce8AQULREU</recordid><startdate>20210713</startdate><enddate>20210713</enddate><creator>LIU SHENGJIAN</creator><creator>HAN GANG</creator><creator>LYU YUGUANG</creator><creator>ZHANG WENYU</creator><creator>HE XIAOQING</creator><creator>WANG NA</creator><creator>DING XUEXIAN</creator><creator>ZHENG HUAIYOU</creator><creator>LI PENG</creator><creator>WANG YONGBAO</creator><creator>GUAN YANTAI</creator><creator>LI JUNCHUN</creator><creator>SHI TAOTAO</creator><scope>EVB</scope></search><sort><creationdate>20210713</creationdate><title>Method for arranging advanced water exploration and drainage holes of water-rich soft-rock rapid tunneling roadway</title><author>LIU SHENGJIAN ; HAN GANG ; LYU YUGUANG ; ZHANG WENYU ; HE XIAOQING ; WANG NA ; DING XUEXIAN ; ZHENG HUAIYOU ; LI PENG ; WANG YONGBAO ; GUAN YANTAI ; LI JUNCHUN ; SHI TAOTAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113107455A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU SHENGJIAN</creatorcontrib><creatorcontrib>HAN GANG</creatorcontrib><creatorcontrib>LYU YUGUANG</creatorcontrib><creatorcontrib>ZHANG WENYU</creatorcontrib><creatorcontrib>HE XIAOQING</creatorcontrib><creatorcontrib>WANG NA</creatorcontrib><creatorcontrib>DING XUEXIAN</creatorcontrib><creatorcontrib>ZHENG HUAIYOU</creatorcontrib><creatorcontrib>LI PENG</creatorcontrib><creatorcontrib>WANG YONGBAO</creatorcontrib><creatorcontrib>GUAN YANTAI</creatorcontrib><creatorcontrib>LI JUNCHUN</creatorcontrib><creatorcontrib>SHI TAOTAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU SHENGJIAN</au><au>HAN GANG</au><au>LYU YUGUANG</au><au>ZHANG WENYU</au><au>HE XIAOQING</au><au>WANG NA</au><au>DING XUEXIAN</au><au>ZHENG HUAIYOU</au><au>LI PENG</au><au>WANG YONGBAO</au><au>GUAN YANTAI</au><au>LI JUNCHUN</au><au>SHI TAOTAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for arranging advanced water exploration and drainage holes of water-rich soft-rock rapid tunneling roadway</title><date>2021-07-13</date><risdate>2021</risdate><abstract>The invention discloses a method for arranging advanced water exploration and drainage holes of a water-rich soft-rock rapid tunneling roadway. The method comprises the following steps of constructing a group of advanced water exploration and drainage holes every 50 m from a position of being 20 m away from a lower crossheading door. By using the method disclosed by the invention, the water-rich conditions in front of the roadway, at two sides of the roadway and at a roof can be detected, and safe and normal tunneling is ensured. 本发明公开了一种富水软岩快速掘进巷道超前探放水孔布置方法,包括步骤:下顺槽开门20m处开始,每50m施工一组超前探放水孔。本发明的方法能够探明巷道前方、两侧、顶板富水情况,确保安全、正常掘进。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113107455A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
title Method for arranging advanced water exploration and drainage holes of water-rich soft-rock rapid tunneling roadway
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T15%3A56%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20SHENGJIAN&rft.date=2021-07-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113107455A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true