Reinforcing method for shaft penetrating through weak surrounding rock

The invention relates to a reinforcing method for a shaft penetrating through weak surrounding rock. The stability of the surrounding rock is fundamentally enhanced, and the shaft tunneling construction safety is improved. The reinforcing method specifically comprises the steps that shaft constructi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAN DEGUANG, YANG YIQUAN, WANG NAIBIN, QI YUNPU, XIA ANYUAN, SHU XUEFU, LIU CHAO, CHEN LIXIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHAN DEGUANG
YANG YIQUAN
WANG NAIBIN
QI YUNPU
XIA ANYUAN
SHU XUEFU
LIU CHAO
CHEN LIXIN
description The invention relates to a reinforcing method for a shaft penetrating through weak surrounding rock. The stability of the surrounding rock is fundamentally enhanced, and the shaft tunneling construction safety is improved. The reinforcing method specifically comprises the steps that shaft construction is stopped when the shaft is constructed to the position away from a weak layer by a certain distance, an original rock grout stopping pad with a certain thickness is reserved, concrete with a certain thickness is poured at the bottom of a shaft, and grout stopping pad concrete is formed; after the concrete reaches the design strength, drilling operation is conducted, after a drilled hole reaches the designed hole depth, steel bars are put into the hole, the length of the steel bars is the same as the depth of the drilled hole, and then the hole is subjected to grouting for the last time; and after grouting of the single hole is finished, the next hole is constructed nearby, and drilling and grouting are sequent
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113027462A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113027462A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113027462A3</originalsourceid><addsrcrecordid>eNrjZHALSs3MS8svSs7MS1fITS3JyE9RAHIVijMS00oUClLzUkuKEktAkiUZRfml6RkK5amJ2QrFpUVAXl4KSKIoPzmbh4E1LTGnOJUXSnMzKLq5hjh76KYW5MenFhckJoNMinf2MzQ0NjAyNzEzcjQmRg0Ae7k0Lg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Reinforcing method for shaft penetrating through weak surrounding rock</title><source>esp@cenet</source><creator>ZHAN DEGUANG ; YANG YIQUAN ; WANG NAIBIN ; QI YUNPU ; XIA ANYUAN ; SHU XUEFU ; LIU CHAO ; CHEN LIXIN</creator><creatorcontrib>ZHAN DEGUANG ; YANG YIQUAN ; WANG NAIBIN ; QI YUNPU ; XIA ANYUAN ; SHU XUEFU ; LIU CHAO ; CHEN LIXIN</creatorcontrib><description>The invention relates to a reinforcing method for a shaft penetrating through weak surrounding rock. The stability of the surrounding rock is fundamentally enhanced, and the shaft tunneling construction safety is improved. The reinforcing method specifically comprises the steps that shaft construction is stopped when the shaft is constructed to the position away from a weak layer by a certain distance, an original rock grout stopping pad with a certain thickness is reserved, concrete with a certain thickness is poured at the bottom of a shaft, and grout stopping pad concrete is formed; after the concrete reaches the design strength, drilling operation is conducted, after a drilled hole reaches the designed hole depth, steel bars are put into the hole, the length of the steel bars is the same as the depth of the drilled hole, and then the hole is subjected to grouting for the last time; and after grouting of the single hole is finished, the next hole is constructed nearby, and drilling and grouting are sequent</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210625&amp;DB=EPODOC&amp;CC=CN&amp;NR=113027462A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210625&amp;DB=EPODOC&amp;CC=CN&amp;NR=113027462A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAN DEGUANG</creatorcontrib><creatorcontrib>YANG YIQUAN</creatorcontrib><creatorcontrib>WANG NAIBIN</creatorcontrib><creatorcontrib>QI YUNPU</creatorcontrib><creatorcontrib>XIA ANYUAN</creatorcontrib><creatorcontrib>SHU XUEFU</creatorcontrib><creatorcontrib>LIU CHAO</creatorcontrib><creatorcontrib>CHEN LIXIN</creatorcontrib><title>Reinforcing method for shaft penetrating through weak surrounding rock</title><description>The invention relates to a reinforcing method for a shaft penetrating through weak surrounding rock. The stability of the surrounding rock is fundamentally enhanced, and the shaft tunneling construction safety is improved. The reinforcing method specifically comprises the steps that shaft construction is stopped when the shaft is constructed to the position away from a weak layer by a certain distance, an original rock grout stopping pad with a certain thickness is reserved, concrete with a certain thickness is poured at the bottom of a shaft, and grout stopping pad concrete is formed; after the concrete reaches the design strength, drilling operation is conducted, after a drilled hole reaches the designed hole depth, steel bars are put into the hole, the length of the steel bars is the same as the depth of the drilled hole, and then the hole is subjected to grouting for the last time; and after grouting of the single hole is finished, the next hole is constructed nearby, and drilling and grouting are sequent</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHALSs3MS8svSs7MS1fITS3JyE9RAHIVijMS00oUClLzUkuKEktAkiUZRfml6RkK5amJ2QrFpUVAXl4KSKIoPzmbh4E1LTGnOJUXSnMzKLq5hjh76KYW5MenFhckJoNMinf2MzQ0NjAyNzEzcjQmRg0Ae7k0Lg</recordid><startdate>20210625</startdate><enddate>20210625</enddate><creator>ZHAN DEGUANG</creator><creator>YANG YIQUAN</creator><creator>WANG NAIBIN</creator><creator>QI YUNPU</creator><creator>XIA ANYUAN</creator><creator>SHU XUEFU</creator><creator>LIU CHAO</creator><creator>CHEN LIXIN</creator><scope>EVB</scope></search><sort><creationdate>20210625</creationdate><title>Reinforcing method for shaft penetrating through weak surrounding rock</title><author>ZHAN DEGUANG ; YANG YIQUAN ; WANG NAIBIN ; QI YUNPU ; XIA ANYUAN ; SHU XUEFU ; LIU CHAO ; CHEN LIXIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113027462A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAN DEGUANG</creatorcontrib><creatorcontrib>YANG YIQUAN</creatorcontrib><creatorcontrib>WANG NAIBIN</creatorcontrib><creatorcontrib>QI YUNPU</creatorcontrib><creatorcontrib>XIA ANYUAN</creatorcontrib><creatorcontrib>SHU XUEFU</creatorcontrib><creatorcontrib>LIU CHAO</creatorcontrib><creatorcontrib>CHEN LIXIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAN DEGUANG</au><au>YANG YIQUAN</au><au>WANG NAIBIN</au><au>QI YUNPU</au><au>XIA ANYUAN</au><au>SHU XUEFU</au><au>LIU CHAO</au><au>CHEN LIXIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Reinforcing method for shaft penetrating through weak surrounding rock</title><date>2021-06-25</date><risdate>2021</risdate><abstract>The invention relates to a reinforcing method for a shaft penetrating through weak surrounding rock. The stability of the surrounding rock is fundamentally enhanced, and the shaft tunneling construction safety is improved. The reinforcing method specifically comprises the steps that shaft construction is stopped when the shaft is constructed to the position away from a weak layer by a certain distance, an original rock grout stopping pad with a certain thickness is reserved, concrete with a certain thickness is poured at the bottom of a shaft, and grout stopping pad concrete is formed; after the concrete reaches the design strength, drilling operation is conducted, after a drilled hole reaches the designed hole depth, steel bars are put into the hole, the length of the steel bars is the same as the depth of the drilled hole, and then the hole is subjected to grouting for the last time; and after grouting of the single hole is finished, the next hole is constructed nearby, and drilling and grouting are sequent</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113027462A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Reinforcing method for shaft penetrating through weak surrounding rock
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T05%3A39%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAN%20DEGUANG&rft.date=2021-06-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113027462A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true