Shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method

The invention discloses a shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method. Identification points are arranged at fluctuation change points of a top interface and a bottom interface of a target layer, an optimal trajectory contr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHI YUANHUI, WANG BIJIN, RAO HAITAO, FENG AIGUO, FENG YIJIANG, ZHAO QING, YANG GUOSHENG, TIAN HAITAO, SHEN JINCAI, XU XIANG, ZHANG XINHUA, YE XIN, ZHAO HONGYAN, ZENG BAOLIN, CHEN SIPING, LI GUANGQUAN, DING WENLONG, YE YINGGUI, CHEN HUI, LIAO YONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHI YUANHUI
WANG BIJIN
RAO HAITAO
FENG AIGUO
FENG YIJIANG
ZHAO QING
YANG GUOSHENG
TIAN HAITAO
SHEN JINCAI
XU XIANG
ZHANG XINHUA
YE XIN
ZHAO HONGYAN
ZENG BAOLIN
CHEN SIPING
LI GUANGQUAN
DING WENLONG
YE YINGGUI
CHEN HUI
LIAO YONG
description The invention discloses a shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method. Identification points are arranged at fluctuation change points of a top interface and a bottom interface of a target layer, an optimal trajectory control path is formed by combining an in-target point and an out-target point, the well deviation angle of the trajectory reaching the in-target point and the well deviation angle required by the front point reaching the rear point in each section are obtained by matching with corresponding formulas, and the geosteering trajectory control of the continuous fluctuation type reservoir horizontal section is realized. The control method is simple, the engineering curvature is optimized, the trajectory adjustment frequency is low, the drilling route is short, and the drilling quality and the drilling time are improved. 本发明公开了一种页岩气水平井连续起伏型储层水平段地质导向轨迹控制方法,通过在目的层顶界面和底界面的起伏变化点处设置标识点,结合入靶点和出靶点形成最优的轨迹控制路径,配合相应公式获得轨迹到达入靶点井斜角和每个分段中
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112983275A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112983275A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112983275A3</originalsourceid><addsrcrecordid>eNqNjLEKwkAQRNNYiPoP6wdYJEHUUoJiZaN9OOKYnJy3YW9PjV9vCBaWVvMY3sw4eZ0a40C1CdSw2Dd7NY6ecI6qnq2PHANdXaw0GrXsSbsWJAiQB1v5XQVUg1GDgwJifU0q5tbXLN3wJ-zoDm34Mk1GV-MCZt-cJPP97lwcFmi5RGhNBQ8ti2OaZpt1nq2W2_wf5wPoaUh9</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method</title><source>esp@cenet</source><creator>SHI YUANHUI ; WANG BIJIN ; RAO HAITAO ; FENG AIGUO ; FENG YIJIANG ; ZHAO QING ; YANG GUOSHENG ; TIAN HAITAO ; SHEN JINCAI ; XU XIANG ; ZHANG XINHUA ; YE XIN ; ZHAO HONGYAN ; ZENG BAOLIN ; CHEN SIPING ; LI GUANGQUAN ; DING WENLONG ; YE YINGGUI ; CHEN HUI ; LIAO YONG</creator><creatorcontrib>SHI YUANHUI ; WANG BIJIN ; RAO HAITAO ; FENG AIGUO ; FENG YIJIANG ; ZHAO QING ; YANG GUOSHENG ; TIAN HAITAO ; SHEN JINCAI ; XU XIANG ; ZHANG XINHUA ; YE XIN ; ZHAO HONGYAN ; ZENG BAOLIN ; CHEN SIPING ; LI GUANGQUAN ; DING WENLONG ; YE YINGGUI ; CHEN HUI ; LIAO YONG</creatorcontrib><description>The invention discloses a shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method. Identification points are arranged at fluctuation change points of a top interface and a bottom interface of a target layer, an optimal trajectory control path is formed by combining an in-target point and an out-target point, the well deviation angle of the trajectory reaching the in-target point and the well deviation angle required by the front point reaching the rear point in each section are obtained by matching with corresponding formulas, and the geosteering trajectory control of the continuous fluctuation type reservoir horizontal section is realized. The control method is simple, the engineering curvature is optimized, the trajectory adjustment frequency is low, the drilling route is short, and the drilling quality and the drilling time are improved. 本发明公开了一种页岩气水平井连续起伏型储层水平段地质导向轨迹控制方法,通过在目的层顶界面和底界面的起伏变化点处设置标识点,结合入靶点和出靶点形成最优的轨迹控制路径,配合相应公式获得轨迹到达入靶点井斜角和每个分段中</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; IMAGE DATA PROCESSING OR GENERATION, IN GENERAL ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PHYSICS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210618&amp;DB=EPODOC&amp;CC=CN&amp;NR=112983275A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210618&amp;DB=EPODOC&amp;CC=CN&amp;NR=112983275A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHI YUANHUI</creatorcontrib><creatorcontrib>WANG BIJIN</creatorcontrib><creatorcontrib>RAO HAITAO</creatorcontrib><creatorcontrib>FENG AIGUO</creatorcontrib><creatorcontrib>FENG YIJIANG</creatorcontrib><creatorcontrib>ZHAO QING</creatorcontrib><creatorcontrib>YANG GUOSHENG</creatorcontrib><creatorcontrib>TIAN HAITAO</creatorcontrib><creatorcontrib>SHEN JINCAI</creatorcontrib><creatorcontrib>XU XIANG</creatorcontrib><creatorcontrib>ZHANG XINHUA</creatorcontrib><creatorcontrib>YE XIN</creatorcontrib><creatorcontrib>ZHAO HONGYAN</creatorcontrib><creatorcontrib>ZENG BAOLIN</creatorcontrib><creatorcontrib>CHEN SIPING</creatorcontrib><creatorcontrib>LI GUANGQUAN</creatorcontrib><creatorcontrib>DING WENLONG</creatorcontrib><creatorcontrib>YE YINGGUI</creatorcontrib><creatorcontrib>CHEN HUI</creatorcontrib><creatorcontrib>LIAO YONG</creatorcontrib><title>Shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method</title><description>The invention discloses a shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method. Identification points are arranged at fluctuation change points of a top interface and a bottom interface of a target layer, an optimal trajectory control path is formed by combining an in-target point and an out-target point, the well deviation angle of the trajectory reaching the in-target point and the well deviation angle required by the front point reaching the rear point in each section are obtained by matching with corresponding formulas, and the geosteering trajectory control of the continuous fluctuation type reservoir horizontal section is realized. The control method is simple, the engineering curvature is optimized, the trajectory adjustment frequency is low, the drilling route is short, and the drilling quality and the drilling time are improved. 本发明公开了一种页岩气水平井连续起伏型储层水平段地质导向轨迹控制方法,通过在目的层顶界面和底界面的起伏变化点处设置标识点,结合入靶点和出靶点形成最优的轨迹控制路径,配合相应公式获得轨迹到达入靶点井斜角和每个分段中</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>IMAGE DATA PROCESSING OR GENERATION, IN GENERAL</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwkAQRNNYiPoP6wdYJEHUUoJiZaN9OOKYnJy3YW9PjV9vCBaWVvMY3sw4eZ0a40C1CdSw2Dd7NY6ecI6qnq2PHANdXaw0GrXsSbsWJAiQB1v5XQVUg1GDgwJifU0q5tbXLN3wJ-zoDm34Mk1GV-MCZt-cJPP97lwcFmi5RGhNBQ8ti2OaZpt1nq2W2_wf5wPoaUh9</recordid><startdate>20210618</startdate><enddate>20210618</enddate><creator>SHI YUANHUI</creator><creator>WANG BIJIN</creator><creator>RAO HAITAO</creator><creator>FENG AIGUO</creator><creator>FENG YIJIANG</creator><creator>ZHAO QING</creator><creator>YANG GUOSHENG</creator><creator>TIAN HAITAO</creator><creator>SHEN JINCAI</creator><creator>XU XIANG</creator><creator>ZHANG XINHUA</creator><creator>YE XIN</creator><creator>ZHAO HONGYAN</creator><creator>ZENG BAOLIN</creator><creator>CHEN SIPING</creator><creator>LI GUANGQUAN</creator><creator>DING WENLONG</creator><creator>YE YINGGUI</creator><creator>CHEN HUI</creator><creator>LIAO YONG</creator><scope>EVB</scope></search><sort><creationdate>20210618</creationdate><title>Shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method</title><author>SHI YUANHUI ; WANG BIJIN ; RAO HAITAO ; FENG AIGUO ; FENG YIJIANG ; ZHAO QING ; YANG GUOSHENG ; TIAN HAITAO ; SHEN JINCAI ; XU XIANG ; ZHANG XINHUA ; YE XIN ; ZHAO HONGYAN ; ZENG BAOLIN ; CHEN SIPING ; LI GUANGQUAN ; DING WENLONG ; YE YINGGUI ; CHEN HUI ; LIAO YONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112983275A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>IMAGE DATA PROCESSING OR GENERATION, IN GENERAL</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>SHI YUANHUI</creatorcontrib><creatorcontrib>WANG BIJIN</creatorcontrib><creatorcontrib>RAO HAITAO</creatorcontrib><creatorcontrib>FENG AIGUO</creatorcontrib><creatorcontrib>FENG YIJIANG</creatorcontrib><creatorcontrib>ZHAO QING</creatorcontrib><creatorcontrib>YANG GUOSHENG</creatorcontrib><creatorcontrib>TIAN HAITAO</creatorcontrib><creatorcontrib>SHEN JINCAI</creatorcontrib><creatorcontrib>XU XIANG</creatorcontrib><creatorcontrib>ZHANG XINHUA</creatorcontrib><creatorcontrib>YE XIN</creatorcontrib><creatorcontrib>ZHAO HONGYAN</creatorcontrib><creatorcontrib>ZENG BAOLIN</creatorcontrib><creatorcontrib>CHEN SIPING</creatorcontrib><creatorcontrib>LI GUANGQUAN</creatorcontrib><creatorcontrib>DING WENLONG</creatorcontrib><creatorcontrib>YE YINGGUI</creatorcontrib><creatorcontrib>CHEN HUI</creatorcontrib><creatorcontrib>LIAO YONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHI YUANHUI</au><au>WANG BIJIN</au><au>RAO HAITAO</au><au>FENG AIGUO</au><au>FENG YIJIANG</au><au>ZHAO QING</au><au>YANG GUOSHENG</au><au>TIAN HAITAO</au><au>SHEN JINCAI</au><au>XU XIANG</au><au>ZHANG XINHUA</au><au>YE XIN</au><au>ZHAO HONGYAN</au><au>ZENG BAOLIN</au><au>CHEN SIPING</au><au>LI GUANGQUAN</au><au>DING WENLONG</au><au>YE YINGGUI</au><au>CHEN HUI</au><au>LIAO YONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method</title><date>2021-06-18</date><risdate>2021</risdate><abstract>The invention discloses a shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method. Identification points are arranged at fluctuation change points of a top interface and a bottom interface of a target layer, an optimal trajectory control path is formed by combining an in-target point and an out-target point, the well deviation angle of the trajectory reaching the in-target point and the well deviation angle required by the front point reaching the rear point in each section are obtained by matching with corresponding formulas, and the geosteering trajectory control of the continuous fluctuation type reservoir horizontal section is realized. The control method is simple, the engineering curvature is optimized, the trajectory adjustment frequency is low, the drilling route is short, and the drilling quality and the drilling time are improved. 本发明公开了一种页岩气水平井连续起伏型储层水平段地质导向轨迹控制方法,通过在目的层顶界面和底界面的起伏变化点处设置标识点,结合入靶点和出靶点形成最优的轨迹控制路径,配合相应公式获得轨迹到达入靶点井斜角和每个分段中</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112983275A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
PHYSICS
title Shale gas horizontal well continuous fluctuation type reservoir horizontal section geosteering trajectory control method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T12%3A01%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHI%20YUANHUI&rft.date=2021-06-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112983275A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true