Building construction supervision method based on BIM
The invention discloses a building construction supervision method based on BIM. The building construction supervision method comprises the following steps that firstly, a motor I (3) is started by a control switch through a controller and a wireless signal receiving and transmitting device to drive...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | PU ZHIQI QI ZHENGFENG FEI HAIWANG XUE HENGXING DAI YIYOU WANG JINKE LIU BINGYU JIN GAOMING ZHANG XIANG ZHU WENHUI |
description | The invention discloses a building construction supervision method based on BIM. The building construction supervision method comprises the following steps that firstly, a motor I (3) is started by a control switch through a controller and a wireless signal receiving and transmitting device to drive a motor shaft (4) to rotate, and the motor shaft (4) drives a protective shell (6) to move through interaction of a driving gear I (5) and an occlusion tooth (9), so that the height of the protective shell (6) is adjusted; then a servo motor (11) and an electric telescopic rod (43) are started, the servo motor (11) drives a lead screw (12) to rotate to drive a sliding block (15) to ascend, the sliding block (15) stably ascends under the action of a first limiting plate (16) and a first sliding groove (17), and the electric telescopic rod (43) shrinks to drive a plugging plate (44) to ascend to be separated from a movable groove; and then, a supervision measuring instrument (35), a camera (36) and an infrared scann |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112856155A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112856155A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112856155A3</originalsourceid><addsrcrecordid>eNrjZDB1Ks3MScnMS1dIzs8rLikqTS7JzM9TKC4tSC0qyywGsXNTSzLyUxSSEotTUxSAfCdPXx4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoZGFqZmhq6mhMjBoAgUAtNQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Building construction supervision method based on BIM</title><source>esp@cenet</source><creator>PU ZHIQI ; QI ZHENGFENG ; FEI HAIWANG ; XUE HENGXING ; DAI YIYOU ; WANG JINKE ; LIU BINGYU ; JIN GAOMING ; ZHANG XIANG ; ZHU WENHUI</creator><creatorcontrib>PU ZHIQI ; QI ZHENGFENG ; FEI HAIWANG ; XUE HENGXING ; DAI YIYOU ; WANG JINKE ; LIU BINGYU ; JIN GAOMING ; ZHANG XIANG ; ZHU WENHUI</creatorcontrib><description>The invention discloses a building construction supervision method based on BIM. The building construction supervision method comprises the following steps that firstly, a motor I (3) is started by a control switch through a controller and a wireless signal receiving and transmitting device to drive a motor shaft (4) to rotate, and the motor shaft (4) drives a protective shell (6) to move through interaction of a driving gear I (5) and an occlusion tooth (9), so that the height of the protective shell (6) is adjusted; then a servo motor (11) and an electric telescopic rod (43) are started, the servo motor (11) drives a lead screw (12) to rotate to drive a sliding block (15) to ascend, the sliding block (15) stably ascends under the action of a first limiting plate (16) and a first sliding groove (17), and the electric telescopic rod (43) shrinks to drive a plugging plate (44) to ascend to be separated from a movable groove; and then, a supervision measuring instrument (35), a camera (36) and an infrared scann</description><language>chi ; eng</language><subject>BLASTING ; ENGINEERING ELEMENTS AND UNITS ; FRAMES, CASINGS, OR BEDS OF ENGINES OR OTHER MACHINES ORAPPARATUS NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUSPROVIDED FOR ELSEWHERE ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; GYROSCOPIC INSTRUMENTS ; HEATING ; LIGHTING ; MEASURING ; MEASURING DISTANCES, LEVELS OR BEARINGS ; MECHANICAL ENGINEERING ; NAVIGATION ; PHOTOGRAMMETRY OR VIDEOGRAMMETRY ; PHYSICS ; STANDS OR SUPPORTS ; SURVEYING ; TESTING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210528&DB=EPODOC&CC=CN&NR=112856155A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210528&DB=EPODOC&CC=CN&NR=112856155A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PU ZHIQI</creatorcontrib><creatorcontrib>QI ZHENGFENG</creatorcontrib><creatorcontrib>FEI HAIWANG</creatorcontrib><creatorcontrib>XUE HENGXING</creatorcontrib><creatorcontrib>DAI YIYOU</creatorcontrib><creatorcontrib>WANG JINKE</creatorcontrib><creatorcontrib>LIU BINGYU</creatorcontrib><creatorcontrib>JIN GAOMING</creatorcontrib><creatorcontrib>ZHANG XIANG</creatorcontrib><creatorcontrib>ZHU WENHUI</creatorcontrib><title>Building construction supervision method based on BIM</title><description>The invention discloses a building construction supervision method based on BIM. The building construction supervision method comprises the following steps that firstly, a motor I (3) is started by a control switch through a controller and a wireless signal receiving and transmitting device to drive a motor shaft (4) to rotate, and the motor shaft (4) drives a protective shell (6) to move through interaction of a driving gear I (5) and an occlusion tooth (9), so that the height of the protective shell (6) is adjusted; then a servo motor (11) and an electric telescopic rod (43) are started, the servo motor (11) drives a lead screw (12) to rotate to drive a sliding block (15) to ascend, the sliding block (15) stably ascends under the action of a first limiting plate (16) and a first sliding groove (17), and the electric telescopic rod (43) shrinks to drive a plugging plate (44) to ascend to be separated from a movable groove; and then, a supervision measuring instrument (35), a camera (36) and an infrared scann</description><subject>BLASTING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FRAMES, CASINGS, OR BEDS OF ENGINES OR OTHER MACHINES ORAPPARATUS NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUSPROVIDED FOR ELSEWHERE</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>GYROSCOPIC INSTRUMENTS</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MEASURING</subject><subject>MEASURING DISTANCES, LEVELS OR BEARINGS</subject><subject>MECHANICAL ENGINEERING</subject><subject>NAVIGATION</subject><subject>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</subject><subject>PHYSICS</subject><subject>STANDS OR SUPPORTS</subject><subject>SURVEYING</subject><subject>TESTING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB1Ks3MScnMS1dIzs8rLikqTS7JzM9TKC4tSC0qyywGsXNTSzLyUxSSEotTUxSAfCdPXx4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoZGFqZmhq6mhMjBoAgUAtNQ</recordid><startdate>20210528</startdate><enddate>20210528</enddate><creator>PU ZHIQI</creator><creator>QI ZHENGFENG</creator><creator>FEI HAIWANG</creator><creator>XUE HENGXING</creator><creator>DAI YIYOU</creator><creator>WANG JINKE</creator><creator>LIU BINGYU</creator><creator>JIN GAOMING</creator><creator>ZHANG XIANG</creator><creator>ZHU WENHUI</creator><scope>EVB</scope></search><sort><creationdate>20210528</creationdate><title>Building construction supervision method based on BIM</title><author>PU ZHIQI ; QI ZHENGFENG ; FEI HAIWANG ; XUE HENGXING ; DAI YIYOU ; WANG JINKE ; LIU BINGYU ; JIN GAOMING ; ZHANG XIANG ; ZHU WENHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112856155A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>BLASTING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FRAMES, CASINGS, OR BEDS OF ENGINES OR OTHER MACHINES ORAPPARATUS NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUSPROVIDED FOR ELSEWHERE</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>GYROSCOPIC INSTRUMENTS</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MEASURING</topic><topic>MEASURING DISTANCES, LEVELS OR BEARINGS</topic><topic>MECHANICAL ENGINEERING</topic><topic>NAVIGATION</topic><topic>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</topic><topic>PHYSICS</topic><topic>STANDS OR SUPPORTS</topic><topic>SURVEYING</topic><topic>TESTING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>PU ZHIQI</creatorcontrib><creatorcontrib>QI ZHENGFENG</creatorcontrib><creatorcontrib>FEI HAIWANG</creatorcontrib><creatorcontrib>XUE HENGXING</creatorcontrib><creatorcontrib>DAI YIYOU</creatorcontrib><creatorcontrib>WANG JINKE</creatorcontrib><creatorcontrib>LIU BINGYU</creatorcontrib><creatorcontrib>JIN GAOMING</creatorcontrib><creatorcontrib>ZHANG XIANG</creatorcontrib><creatorcontrib>ZHU WENHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PU ZHIQI</au><au>QI ZHENGFENG</au><au>FEI HAIWANG</au><au>XUE HENGXING</au><au>DAI YIYOU</au><au>WANG JINKE</au><au>LIU BINGYU</au><au>JIN GAOMING</au><au>ZHANG XIANG</au><au>ZHU WENHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Building construction supervision method based on BIM</title><date>2021-05-28</date><risdate>2021</risdate><abstract>The invention discloses a building construction supervision method based on BIM. The building construction supervision method comprises the following steps that firstly, a motor I (3) is started by a control switch through a controller and a wireless signal receiving and transmitting device to drive a motor shaft (4) to rotate, and the motor shaft (4) drives a protective shell (6) to move through interaction of a driving gear I (5) and an occlusion tooth (9), so that the height of the protective shell (6) is adjusted; then a servo motor (11) and an electric telescopic rod (43) are started, the servo motor (11) drives a lead screw (12) to rotate to drive a sliding block (15) to ascend, the sliding block (15) stably ascends under the action of a first limiting plate (16) and a first sliding groove (17), and the electric telescopic rod (43) shrinks to drive a plugging plate (44) to ascend to be separated from a movable groove; and then, a supervision measuring instrument (35), a camera (36) and an infrared scann</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112856155A |
source | esp@cenet |
subjects | BLASTING ENGINEERING ELEMENTS AND UNITS FRAMES, CASINGS, OR BEDS OF ENGINES OR OTHER MACHINES ORAPPARATUS NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUSPROVIDED FOR ELSEWHERE GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS GYROSCOPIC INSTRUMENTS HEATING LIGHTING MEASURING MEASURING DISTANCES, LEVELS OR BEARINGS MECHANICAL ENGINEERING NAVIGATION PHOTOGRAMMETRY OR VIDEOGRAMMETRY PHYSICS STANDS OR SUPPORTS SURVEYING TESTING THERMAL INSULATION IN GENERAL WEAPONS |
title | Building construction supervision method based on BIM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T20%3A32%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PU%20ZHIQI&rft.date=2021-05-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112856155A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |