Simple method for determining key procedures and calculating total construction period
The invention discloses a simple method for determining key procedures and calculating a total construction period. The simple method comprises the following steps: S1, determining engineering construction content, dividing construction procedures and decomposing a construction process; S2, dividing...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | DAI LONGLONG |
description | The invention discloses a simple method for determining key procedures and calculating a total construction period. The simple method comprises the following steps: S1, determining engineering construction content, dividing construction procedures and decomposing a construction process; S2, dividing construction sections according to the construction sequence, dividing the construction sections into a plurality of construction teams, and determining the time of the construction sections of the construction teams; S3, according to the step S1 and the step S2, writing a table of the number of construction processes * the number of construction sections (n * m); S4, determining a technical gap of each construction section according to process requirements; S5, according to the construction sequence, carrying out step-by-step dislocation comparison, and determining the key procedures; and S6, accumulating the sum sigmaAij of the construction time Aij of each key process Kij, and adding the technical gap accumulat |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112766757A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112766757A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112766757A3</originalsourceid><addsrcrecordid>eNqNyjEOAiEQRmEaC6PeYTyAxWpcarPRWNlobDcE_lUiMASGwtsbEw9g9YrvzdX96mMOoAh5sqOJCzkISvTJpwe98KZc2MK1gkomObIm2BaMfFlYTCDLqUppVjwnyiie3VLNJhMqVr8u1Pp0vA3nDTKPqNlYJMg4XLpuq_te7_Vh98_zAXbVOmo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Simple method for determining key procedures and calculating total construction period</title><source>esp@cenet</source><creator>DAI LONGLONG</creator><creatorcontrib>DAI LONGLONG</creatorcontrib><description>The invention discloses a simple method for determining key procedures and calculating a total construction period. The simple method comprises the following steps: S1, determining engineering construction content, dividing construction procedures and decomposing a construction process; S2, dividing construction sections according to the construction sequence, dividing the construction sections into a plurality of construction teams, and determining the time of the construction sections of the construction teams; S3, according to the step S1 and the step S2, writing a table of the number of construction processes * the number of construction sections (n * m); S4, determining a technical gap of each construction section according to process requirements; S5, according to the construction sequence, carrying out step-by-step dislocation comparison, and determining the key procedures; and S6, accumulating the sum sigmaAij of the construction time Aij of each key process Kij, and adding the technical gap accumulat</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210507&DB=EPODOC&CC=CN&NR=112766757A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210507&DB=EPODOC&CC=CN&NR=112766757A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DAI LONGLONG</creatorcontrib><title>Simple method for determining key procedures and calculating total construction period</title><description>The invention discloses a simple method for determining key procedures and calculating a total construction period. The simple method comprises the following steps: S1, determining engineering construction content, dividing construction procedures and decomposing a construction process; S2, dividing construction sections according to the construction sequence, dividing the construction sections into a plurality of construction teams, and determining the time of the construction sections of the construction teams; S3, according to the step S1 and the step S2, writing a table of the number of construction processes * the number of construction sections (n * m); S4, determining a technical gap of each construction section according to process requirements; S5, according to the construction sequence, carrying out step-by-step dislocation comparison, and determining the key procedures; and S6, accumulating the sum sigmaAij of the construction time Aij of each key process Kij, and adding the technical gap accumulat</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEOAiEQRmEaC6PeYTyAxWpcarPRWNlobDcE_lUiMASGwtsbEw9g9YrvzdX96mMOoAh5sqOJCzkISvTJpwe98KZc2MK1gkomObIm2BaMfFlYTCDLqUppVjwnyiie3VLNJhMqVr8u1Pp0vA3nDTKPqNlYJMg4XLpuq_te7_Vh98_zAXbVOmo</recordid><startdate>20210507</startdate><enddate>20210507</enddate><creator>DAI LONGLONG</creator><scope>EVB</scope></search><sort><creationdate>20210507</creationdate><title>Simple method for determining key procedures and calculating total construction period</title><author>DAI LONGLONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112766757A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>DAI LONGLONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DAI LONGLONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Simple method for determining key procedures and calculating total construction period</title><date>2021-05-07</date><risdate>2021</risdate><abstract>The invention discloses a simple method for determining key procedures and calculating a total construction period. The simple method comprises the following steps: S1, determining engineering construction content, dividing construction procedures and decomposing a construction process; S2, dividing construction sections according to the construction sequence, dividing the construction sections into a plurality of construction teams, and determining the time of the construction sections of the construction teams; S3, according to the step S1 and the step S2, writing a table of the number of construction processes * the number of construction sections (n * m); S4, determining a technical gap of each construction section according to process requirements; S5, according to the construction sequence, carrying out step-by-step dislocation comparison, and determining the key procedures; and S6, accumulating the sum sigmaAij of the construction time Aij of each key process Kij, and adding the technical gap accumulat</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112766757A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Simple method for determining key procedures and calculating total construction period |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-19T09%3A52%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DAI%20LONGLONG&rft.date=2021-05-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112766757A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |