Construction method for hoisting new viaduct based on original bridge

The invention relates to a construction method for hoisting a new viaduct bridge based on an original bridge, and the method specifically comprises the following steps: building a temporary support, enabling hoisting equipment to enter a site, enabling a steel beam to enter the site, hoisting the ho...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG CHONGJIAN, YAN XINHUI, LIU JIN, YU WEISONG, SHI SHUDONG, ZHOU CAOWEI, SONG JIAN, HUANG JIELI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHENG CHONGJIAN
YAN XINHUI
LIU JIN
YU WEISONG
SHI SHUDONG
ZHOU CAOWEI
SONG JIAN
HUANG JIELI
description The invention relates to a construction method for hoisting a new viaduct bridge based on an original bridge, and the method specifically comprises the following steps: building a temporary support, enabling hoisting equipment to enter a site, enabling a steel beam to enter the site, hoisting the hoisting equipment, aligning and splicing the steel beam, detecting the size of the steel beam, welding the steel beam, detecting a welding seam, and removing the temporary support. The hoisting equipment comprises a hoisting base, a clamping table lifting device arranged on the hoisting base and a clamping table which is arranged on the clamping table lifting device and can move in the vertical direction. The clamping table comprises an edge clamping plate, a plurality of sets of clamping blocks which are connected to the edge clamping plate in an opposite sliding mode and clamp the two side edges of the steel box girder in the length direction, and a clamping block opposite moving mechanism which is arranged on the
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112695639A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112695639A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112695639A3</originalsourceid><addsrcrecordid>eNqNyrEOgkAMANBbHIz6D_UDHJBIwkguGCcnd3Jw5WiCLblW_X0Z_ACnt7yta72wWn4NRsLwRJskwigZJiE14gSMH3hTiGuBPihGWKNkSsRhhj5TTLh3mzHMioefO3e8tg9_O-EiHeoSBmS0zt-L4lzVl6qsm_Kf8wUXDjNw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for hoisting new viaduct based on original bridge</title><source>esp@cenet</source><creator>CHENG CHONGJIAN ; YAN XINHUI ; LIU JIN ; YU WEISONG ; SHI SHUDONG ; ZHOU CAOWEI ; SONG JIAN ; HUANG JIELI</creator><creatorcontrib>CHENG CHONGJIAN ; YAN XINHUI ; LIU JIN ; YU WEISONG ; SHI SHUDONG ; ZHOU CAOWEI ; SONG JIAN ; HUANG JIELI</creatorcontrib><description>The invention relates to a construction method for hoisting a new viaduct bridge based on an original bridge, and the method specifically comprises the following steps: building a temporary support, enabling hoisting equipment to enter a site, enabling a steel beam to enter the site, hoisting the hoisting equipment, aligning and splicing the steel beam, detecting the size of the steel beam, welding the steel beam, detecting a welding seam, and removing the temporary support. The hoisting equipment comprises a hoisting base, a clamping table lifting device arranged on the hoisting base and a clamping table which is arranged on the clamping table lifting device and can move in the vertical direction. The clamping table comprises an edge clamping plate, a plurality of sets of clamping blocks which are connected to the edge clamping plate in an opposite sliding mode and clamp the two side edges of the steel box girder in the length direction, and a clamping block opposite moving mechanism which is arranged on the</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210423&amp;DB=EPODOC&amp;CC=CN&amp;NR=112695639A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210423&amp;DB=EPODOC&amp;CC=CN&amp;NR=112695639A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHENG CHONGJIAN</creatorcontrib><creatorcontrib>YAN XINHUI</creatorcontrib><creatorcontrib>LIU JIN</creatorcontrib><creatorcontrib>YU WEISONG</creatorcontrib><creatorcontrib>SHI SHUDONG</creatorcontrib><creatorcontrib>ZHOU CAOWEI</creatorcontrib><creatorcontrib>SONG JIAN</creatorcontrib><creatorcontrib>HUANG JIELI</creatorcontrib><title>Construction method for hoisting new viaduct based on original bridge</title><description>The invention relates to a construction method for hoisting a new viaduct bridge based on an original bridge, and the method specifically comprises the following steps: building a temporary support, enabling hoisting equipment to enter a site, enabling a steel beam to enter the site, hoisting the hoisting equipment, aligning and splicing the steel beam, detecting the size of the steel beam, welding the steel beam, detecting a welding seam, and removing the temporary support. The hoisting equipment comprises a hoisting base, a clamping table lifting device arranged on the hoisting base and a clamping table which is arranged on the clamping table lifting device and can move in the vertical direction. The clamping table comprises an edge clamping plate, a plurality of sets of clamping blocks which are connected to the edge clamping plate in an opposite sliding mode and clamp the two side edges of the steel box girder in the length direction, and a clamping block opposite moving mechanism which is arranged on the</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyrEOgkAMANBbHIz6D_UDHJBIwkguGCcnd3Jw5WiCLblW_X0Z_ACnt7yta72wWn4NRsLwRJskwigZJiE14gSMH3hTiGuBPihGWKNkSsRhhj5TTLh3mzHMioefO3e8tg9_O-EiHeoSBmS0zt-L4lzVl6qsm_Kf8wUXDjNw</recordid><startdate>20210423</startdate><enddate>20210423</enddate><creator>CHENG CHONGJIAN</creator><creator>YAN XINHUI</creator><creator>LIU JIN</creator><creator>YU WEISONG</creator><creator>SHI SHUDONG</creator><creator>ZHOU CAOWEI</creator><creator>SONG JIAN</creator><creator>HUANG JIELI</creator><scope>EVB</scope></search><sort><creationdate>20210423</creationdate><title>Construction method for hoisting new viaduct based on original bridge</title><author>CHENG CHONGJIAN ; YAN XINHUI ; LIU JIN ; YU WEISONG ; SHI SHUDONG ; ZHOU CAOWEI ; SONG JIAN ; HUANG JIELI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112695639A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>CHENG CHONGJIAN</creatorcontrib><creatorcontrib>YAN XINHUI</creatorcontrib><creatorcontrib>LIU JIN</creatorcontrib><creatorcontrib>YU WEISONG</creatorcontrib><creatorcontrib>SHI SHUDONG</creatorcontrib><creatorcontrib>ZHOU CAOWEI</creatorcontrib><creatorcontrib>SONG JIAN</creatorcontrib><creatorcontrib>HUANG JIELI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHENG CHONGJIAN</au><au>YAN XINHUI</au><au>LIU JIN</au><au>YU WEISONG</au><au>SHI SHUDONG</au><au>ZHOU CAOWEI</au><au>SONG JIAN</au><au>HUANG JIELI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for hoisting new viaduct based on original bridge</title><date>2021-04-23</date><risdate>2021</risdate><abstract>The invention relates to a construction method for hoisting a new viaduct bridge based on an original bridge, and the method specifically comprises the following steps: building a temporary support, enabling hoisting equipment to enter a site, enabling a steel beam to enter the site, hoisting the hoisting equipment, aligning and splicing the steel beam, detecting the size of the steel beam, welding the steel beam, detecting a welding seam, and removing the temporary support. The hoisting equipment comprises a hoisting base, a clamping table lifting device arranged on the hoisting base and a clamping table which is arranged on the clamping table lifting device and can move in the vertical direction. The clamping table comprises an edge clamping plate, a plurality of sets of clamping blocks which are connected to the edge clamping plate in an opposite sliding mode and clamp the two side edges of the steel box girder in the length direction, and a clamping block opposite moving mechanism which is arranged on the</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112695639A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Construction method for hoisting new viaduct based on original bridge
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T10%3A30%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHENG%20CHONGJIAN&rft.date=2021-04-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112695639A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true