Mounting method of gas dome cylinder hoisting platform
The invention provides a mounting method of a gas dome cylinder hoisting platform. The mounting method comprises the following steps: 1, designing a connecting cylinder, and arranging a connecting flange at one end of the connecting cylinder; 2, a platform plate is welded to the other end of the con...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | GAN JIANXIN CI YUANMAO ZHAO JIAXUAN HU JIN |
description | The invention provides a mounting method of a gas dome cylinder hoisting platform. The mounting method comprises the following steps: 1, designing a connecting cylinder, and arranging a connecting flange at one end of the connecting cylinder; 2, a platform plate is welded to the other end of the connecting cylinder; 3, railing stand columns and railing reinforcing columns are installed on the front side of the platform plate, the railing stand columns are connected through the railing reinforcing columns, and ventilation bent pipes are installed on the connecting cylinder; 4, the connecting cylinder is installed on a top flange of a gas dome cylinder through the connecting flange; and 5, a crane walking beam is installed on a structural frame, the structural frame is installed on the platform plate through bolts, the crane walking beam is installed at the top of the structural frame, and a top rainproof plate is installed above the structural frame. The top rainproof plate is arranged,operation can be conduct |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112357755A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112357755A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112357755A3</originalsourceid><addsrcrecordid>eNrjZDDzzS_NK8nMS1fITS3JyE9RyE9TSE8sVkjJz01VSK7MycxLSS1SyMjPLAYrKshJLEnLL8rlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhkbGpubmpqaOxsSoAQClVC2w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Mounting method of gas dome cylinder hoisting platform</title><source>esp@cenet</source><creator>GAN JIANXIN ; CI YUANMAO ; ZHAO JIAXUAN ; HU JIN</creator><creatorcontrib>GAN JIANXIN ; CI YUANMAO ; ZHAO JIAXUAN ; HU JIN</creatorcontrib><description>The invention provides a mounting method of a gas dome cylinder hoisting platform. The mounting method comprises the following steps: 1, designing a connecting cylinder, and arranging a connecting flange at one end of the connecting cylinder; 2, a platform plate is welded to the other end of the connecting cylinder; 3, railing stand columns and railing reinforcing columns are installed on the front side of the platform plate, the railing stand columns are connected through the railing reinforcing columns, and ventilation bent pipes are installed on the connecting cylinder; 4, the connecting cylinder is installed on a top flange of a gas dome cylinder through the connecting flange; and 5, a crane walking beam is installed on a structural frame, the structural frame is installed on the platform plate through bolts, the crane walking beam is installed at the top of the structural frame, and a top rainproof plate is installed above the structural frame. The top rainproof plate is arranged,operation can be conduct</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210212&DB=EPODOC&CC=CN&NR=112357755A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210212&DB=EPODOC&CC=CN&NR=112357755A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GAN JIANXIN</creatorcontrib><creatorcontrib>CI YUANMAO</creatorcontrib><creatorcontrib>ZHAO JIAXUAN</creatorcontrib><creatorcontrib>HU JIN</creatorcontrib><title>Mounting method of gas dome cylinder hoisting platform</title><description>The invention provides a mounting method of a gas dome cylinder hoisting platform. The mounting method comprises the following steps: 1, designing a connecting cylinder, and arranging a connecting flange at one end of the connecting cylinder; 2, a platform plate is welded to the other end of the connecting cylinder; 3, railing stand columns and railing reinforcing columns are installed on the front side of the platform plate, the railing stand columns are connected through the railing reinforcing columns, and ventilation bent pipes are installed on the connecting cylinder; 4, the connecting cylinder is installed on a top flange of a gas dome cylinder through the connecting flange; and 5, a crane walking beam is installed on a structural frame, the structural frame is installed on the platform plate through bolts, the crane walking beam is installed at the top of the structural frame, and a top rainproof plate is installed above the structural frame. The top rainproof plate is arranged,operation can be conduct</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDDzzS_NK8nMS1fITS3JyE9RyE9TSE8sVkjJz01VSK7MycxLSS1SyMjPLAYrKshJLEnLL8rlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhkbGpubmpqaOxsSoAQClVC2w</recordid><startdate>20210212</startdate><enddate>20210212</enddate><creator>GAN JIANXIN</creator><creator>CI YUANMAO</creator><creator>ZHAO JIAXUAN</creator><creator>HU JIN</creator><scope>EVB</scope></search><sort><creationdate>20210212</creationdate><title>Mounting method of gas dome cylinder hoisting platform</title><author>GAN JIANXIN ; CI YUANMAO ; ZHAO JIAXUAN ; HU JIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112357755A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>GAN JIANXIN</creatorcontrib><creatorcontrib>CI YUANMAO</creatorcontrib><creatorcontrib>ZHAO JIAXUAN</creatorcontrib><creatorcontrib>HU JIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GAN JIANXIN</au><au>CI YUANMAO</au><au>ZHAO JIAXUAN</au><au>HU JIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Mounting method of gas dome cylinder hoisting platform</title><date>2021-02-12</date><risdate>2021</risdate><abstract>The invention provides a mounting method of a gas dome cylinder hoisting platform. The mounting method comprises the following steps: 1, designing a connecting cylinder, and arranging a connecting flange at one end of the connecting cylinder; 2, a platform plate is welded to the other end of the connecting cylinder; 3, railing stand columns and railing reinforcing columns are installed on the front side of the platform plate, the railing stand columns are connected through the railing reinforcing columns, and ventilation bent pipes are installed on the connecting cylinder; 4, the connecting cylinder is installed on a top flange of a gas dome cylinder through the connecting flange; and 5, a crane walking beam is installed on a structural frame, the structural frame is installed on the platform plate through bolts, the crane walking beam is installed at the top of the structural frame, and a top rainproof plate is installed above the structural frame. The top rainproof plate is arranged,operation can be conduct</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112357755A |
source | esp@cenet |
subjects | CRANES HAULING HOISTING LIFTING LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES PERFORMING OPERATIONS TRANSPORTING |
title | Mounting method of gas dome cylinder hoisting platform |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T11%3A53%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GAN%20JIANXIN&rft.date=2021-02-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112357755A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |