BIM technology-based railway continuous beam prestressed pipeline accurate positioning method

The invention discloses a BIM technology-based railway continuous beam prestressed pipeline accurate positioning method, which relates to a railway bridge prestressed pipeline positioning method. Themethod is invented mainly for solving the problem that at present, prestressed steel beam space posit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG SHANSHAN, MA ZHEN, YANG YULIN, GU YUXIN, TIAN RENDONG, LU MENGRU, LU MENGFAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG SHANSHAN
MA ZHEN
YANG YULIN
GU YUXIN
TIAN RENDONG
LU MENGRU
LU MENGFAN
description The invention discloses a BIM technology-based railway continuous beam prestressed pipeline accurate positioning method, which relates to a railway bridge prestressed pipeline positioning method. Themethod is invented mainly for solving the problem that at present, prestressed steel beam space positioning is based on a two-dimensional design drawing, and deviation is likely to occur in continuousbeam construction. Based on a drawing, a complete engineering model and a database are established according to construction procedures and system coding requirements, a BIM model adopts Tekla software for modeling, and an IFC general format is exported by utilizing the BIM model and transmitted to Navisworks. And through Navisworks display software, three-dimensional display of components is carried out on the bridge engineering, and meanwhile three-dimensional collision inspection is achieved. Programming is conducted through C# language to realize one-key output of the spatial coordinatesof the prestressed steel be
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112347549A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112347549A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112347549A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQQNE0FqLeYTxAipiIWGpQtNDKVsK4GZOBzcySnSC5vQoewOLzmzdN7vvzBYxcK-q1GdMHRqqhR_YvHMGpGMugQ4QHYQehp2ifviZwIM9CgM4NPRpB0MjGKiwNdGSt1vNk8kQfafH7LFkeD7fylFLQimJAR0JWldcsW-XFZl1sd_k_5g1TqD0X</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BIM technology-based railway continuous beam prestressed pipeline accurate positioning method</title><source>esp@cenet</source><creator>WANG SHANSHAN ; MA ZHEN ; YANG YULIN ; GU YUXIN ; TIAN RENDONG ; LU MENGRU ; LU MENGFAN</creator><creatorcontrib>WANG SHANSHAN ; MA ZHEN ; YANG YULIN ; GU YUXIN ; TIAN RENDONG ; LU MENGRU ; LU MENGFAN</creatorcontrib><description>The invention discloses a BIM technology-based railway continuous beam prestressed pipeline accurate positioning method, which relates to a railway bridge prestressed pipeline positioning method. Themethod is invented mainly for solving the problem that at present, prestressed steel beam space positioning is based on a two-dimensional design drawing, and deviation is likely to occur in continuousbeam construction. Based on a drawing, a complete engineering model and a database are established according to construction procedures and system coding requirements, a BIM model adopts Tekla software for modeling, and an IFC general format is exported by utilizing the BIM model and transmitted to Navisworks. And through Navisworks display software, three-dimensional display of components is carried out on the bridge engineering, and meanwhile three-dimensional collision inspection is achieved. Programming is conducted through C# language to realize one-key output of the spatial coordinatesof the prestressed steel be</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; IMAGE DATA PROCESSING OR GENERATION, IN GENERAL ; PHYSICS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210209&amp;DB=EPODOC&amp;CC=CN&amp;NR=112347549A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210209&amp;DB=EPODOC&amp;CC=CN&amp;NR=112347549A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG SHANSHAN</creatorcontrib><creatorcontrib>MA ZHEN</creatorcontrib><creatorcontrib>YANG YULIN</creatorcontrib><creatorcontrib>GU YUXIN</creatorcontrib><creatorcontrib>TIAN RENDONG</creatorcontrib><creatorcontrib>LU MENGRU</creatorcontrib><creatorcontrib>LU MENGFAN</creatorcontrib><title>BIM technology-based railway continuous beam prestressed pipeline accurate positioning method</title><description>The invention discloses a BIM technology-based railway continuous beam prestressed pipeline accurate positioning method, which relates to a railway bridge prestressed pipeline positioning method. Themethod is invented mainly for solving the problem that at present, prestressed steel beam space positioning is based on a two-dimensional design drawing, and deviation is likely to occur in continuousbeam construction. Based on a drawing, a complete engineering model and a database are established according to construction procedures and system coding requirements, a BIM model adopts Tekla software for modeling, and an IFC general format is exported by utilizing the BIM model and transmitted to Navisworks. And through Navisworks display software, three-dimensional display of components is carried out on the bridge engineering, and meanwhile three-dimensional collision inspection is achieved. Programming is conducted through C# language to realize one-key output of the spatial coordinatesof the prestressed steel be</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>IMAGE DATA PROCESSING OR GENERATION, IN GENERAL</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQQNE0FqLeYTxAipiIWGpQtNDKVsK4GZOBzcySnSC5vQoewOLzmzdN7vvzBYxcK-q1GdMHRqqhR_YvHMGpGMugQ4QHYQehp2ifviZwIM9CgM4NPRpB0MjGKiwNdGSt1vNk8kQfafH7LFkeD7fylFLQimJAR0JWldcsW-XFZl1sd_k_5g1TqD0X</recordid><startdate>20210209</startdate><enddate>20210209</enddate><creator>WANG SHANSHAN</creator><creator>MA ZHEN</creator><creator>YANG YULIN</creator><creator>GU YUXIN</creator><creator>TIAN RENDONG</creator><creator>LU MENGRU</creator><creator>LU MENGFAN</creator><scope>EVB</scope></search><sort><creationdate>20210209</creationdate><title>BIM technology-based railway continuous beam prestressed pipeline accurate positioning method</title><author>WANG SHANSHAN ; MA ZHEN ; YANG YULIN ; GU YUXIN ; TIAN RENDONG ; LU MENGRU ; LU MENGFAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112347549A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>IMAGE DATA PROCESSING OR GENERATION, IN GENERAL</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG SHANSHAN</creatorcontrib><creatorcontrib>MA ZHEN</creatorcontrib><creatorcontrib>YANG YULIN</creatorcontrib><creatorcontrib>GU YUXIN</creatorcontrib><creatorcontrib>TIAN RENDONG</creatorcontrib><creatorcontrib>LU MENGRU</creatorcontrib><creatorcontrib>LU MENGFAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG SHANSHAN</au><au>MA ZHEN</au><au>YANG YULIN</au><au>GU YUXIN</au><au>TIAN RENDONG</au><au>LU MENGRU</au><au>LU MENGFAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BIM technology-based railway continuous beam prestressed pipeline accurate positioning method</title><date>2021-02-09</date><risdate>2021</risdate><abstract>The invention discloses a BIM technology-based railway continuous beam prestressed pipeline accurate positioning method, which relates to a railway bridge prestressed pipeline positioning method. Themethod is invented mainly for solving the problem that at present, prestressed steel beam space positioning is based on a two-dimensional design drawing, and deviation is likely to occur in continuousbeam construction. Based on a drawing, a complete engineering model and a database are established according to construction procedures and system coding requirements, a BIM model adopts Tekla software for modeling, and an IFC general format is exported by utilizing the BIM model and transmitted to Navisworks. And through Navisworks display software, three-dimensional display of components is carried out on the bridge engineering, and meanwhile three-dimensional collision inspection is achieved. Programming is conducted through C# language to realize one-key output of the spatial coordinatesof the prestressed steel be</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112347549A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
PHYSICS
title BIM technology-based railway continuous beam prestressed pipeline accurate positioning method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T12%3A33%3A02IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20SHANSHAN&rft.date=2021-02-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112347549A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true