Post-tensioning method unbonded prestressed anchorage pile structure and construction method thereof

The invention discloses a post-tensioning method unbonded prestressed anchorage pile structure and a construction method thereof. The post-tensioning method unbonded prestressed anchorage pile structure is characterized in that a drilling machine is used for forming a hole, after the hole is finishe...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN XIMEI, PEI JUNYI, PEI XIAOFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN XIMEI
PEI JUNYI
PEI XIAOFENG
description The invention discloses a post-tensioning method unbonded prestressed anchorage pile structure and a construction method thereof. The post-tensioning method unbonded prestressed anchorage pile structure is characterized in that a drilling machine is used for forming a hole, after the hole is finished, a drilled hole and one or more spaced annular conical cavities along a pile hole are formed at the pile end in an extrusion expansion or rotary expansion mode, and then a steel strand with an anchorage device at the front end is placed in the hole; the steel strand extends to a hole opening all the time and is sleeved with a sleeve, the sleeve is filled with grease, the steel strand is completely soaked in the grease, then the hole is cleaned through a lower guide pipe, concrete is poured tothe position above the uppermost annular conical cavity, the rest pile hole piles are filled with soil or muck and the like, and the cavity becomes a disc body; and after the concrete reaches the preset strength, the steel st
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112211186A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112211186A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112211186A3</originalsourceid><addsrcrecordid>eNqNjLEKwjAYhLM4iPoO8QE6pIK4SlGcxMG9xOTaBtr_D8mf9zeg7g7HHd8dt1b-wVkaAeXAFGjUC2Rirwu9mDy8jglZqnLNltzEyY7QMczQlRcnJaEWXjumD6hHvxeZkMDDVq0GO2fsvr5R--vl2d0aRO6Ro3UgSN_djWlbY8zpeD78s3kDnPVAHQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Post-tensioning method unbonded prestressed anchorage pile structure and construction method thereof</title><source>esp@cenet</source><creator>CHEN XIMEI ; PEI JUNYI ; PEI XIAOFENG</creator><creatorcontrib>CHEN XIMEI ; PEI JUNYI ; PEI XIAOFENG</creatorcontrib><description>The invention discloses a post-tensioning method unbonded prestressed anchorage pile structure and a construction method thereof. The post-tensioning method unbonded prestressed anchorage pile structure is characterized in that a drilling machine is used for forming a hole, after the hole is finished, a drilled hole and one or more spaced annular conical cavities along a pile hole are formed at the pile end in an extrusion expansion or rotary expansion mode, and then a steel strand with an anchorage device at the front end is placed in the hole; the steel strand extends to a hole opening all the time and is sleeved with a sleeve, the sleeve is filled with grease, the steel strand is completely soaked in the grease, then the hole is cleaned through a lower guide pipe, concrete is poured tothe position above the uppermost annular conical cavity, the rest pile hole piles are filled with soil or muck and the like, and the cavity becomes a disc body; and after the concrete reaches the preset strength, the steel st</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210112&amp;DB=EPODOC&amp;CC=CN&amp;NR=112211186A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210112&amp;DB=EPODOC&amp;CC=CN&amp;NR=112211186A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN XIMEI</creatorcontrib><creatorcontrib>PEI JUNYI</creatorcontrib><creatorcontrib>PEI XIAOFENG</creatorcontrib><title>Post-tensioning method unbonded prestressed anchorage pile structure and construction method thereof</title><description>The invention discloses a post-tensioning method unbonded prestressed anchorage pile structure and a construction method thereof. The post-tensioning method unbonded prestressed anchorage pile structure is characterized in that a drilling machine is used for forming a hole, after the hole is finished, a drilled hole and one or more spaced annular conical cavities along a pile hole are formed at the pile end in an extrusion expansion or rotary expansion mode, and then a steel strand with an anchorage device at the front end is placed in the hole; the steel strand extends to a hole opening all the time and is sleeved with a sleeve, the sleeve is filled with grease, the steel strand is completely soaked in the grease, then the hole is cleaned through a lower guide pipe, concrete is poured tothe position above the uppermost annular conical cavity, the rest pile hole piles are filled with soil or muck and the like, and the cavity becomes a disc body; and after the concrete reaches the preset strength, the steel st</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAYhLM4iPoO8QE6pIK4SlGcxMG9xOTaBtr_D8mf9zeg7g7HHd8dt1b-wVkaAeXAFGjUC2Rirwu9mDy8jglZqnLNltzEyY7QMczQlRcnJaEWXjumD6hHvxeZkMDDVq0GO2fsvr5R--vl2d0aRO6Ro3UgSN_djWlbY8zpeD78s3kDnPVAHQ</recordid><startdate>20210112</startdate><enddate>20210112</enddate><creator>CHEN XIMEI</creator><creator>PEI JUNYI</creator><creator>PEI XIAOFENG</creator><scope>EVB</scope></search><sort><creationdate>20210112</creationdate><title>Post-tensioning method unbonded prestressed anchorage pile structure and construction method thereof</title><author>CHEN XIMEI ; PEI JUNYI ; PEI XIAOFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112211186A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN XIMEI</creatorcontrib><creatorcontrib>PEI JUNYI</creatorcontrib><creatorcontrib>PEI XIAOFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN XIMEI</au><au>PEI JUNYI</au><au>PEI XIAOFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Post-tensioning method unbonded prestressed anchorage pile structure and construction method thereof</title><date>2021-01-12</date><risdate>2021</risdate><abstract>The invention discloses a post-tensioning method unbonded prestressed anchorage pile structure and a construction method thereof. The post-tensioning method unbonded prestressed anchorage pile structure is characterized in that a drilling machine is used for forming a hole, after the hole is finished, a drilled hole and one or more spaced annular conical cavities along a pile hole are formed at the pile end in an extrusion expansion or rotary expansion mode, and then a steel strand with an anchorage device at the front end is placed in the hole; the steel strand extends to a hole opening all the time and is sleeved with a sleeve, the sleeve is filled with grease, the steel strand is completely soaked in the grease, then the hole is cleaned through a lower guide pipe, concrete is poured tothe position above the uppermost annular conical cavity, the rest pile hole piles are filled with soil or muck and the like, and the cavity becomes a disc body; and after the concrete reaches the preset strength, the steel st</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112211186A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Post-tensioning method unbonded prestressed anchorage pile structure and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T20%3A50%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20XIMEI&rft.date=2021-01-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112211186A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true