LNG ship pump tower positioning and mounting method

The invention discloses a method for positioning and installing a pump tower of an LNG ship. The method specifically comprises the following steps that a liquid dome section and a deck section are manufactured; marking a first sample punching mark on the inner deck of the liquid dome subsection, and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHI YINFENG, LI CHEN, GAO PAN, JI LIXIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHI YINFENG
LI CHEN
GAO PAN
JI LIXIANG
description The invention discloses a method for positioning and installing a pump tower of an LNG ship. The method specifically comprises the following steps that a liquid dome section and a deck section are manufactured; marking a first sample punching mark on the inner deck of the liquid dome subsection, and marking a second sample punching mark on the inner deck of the deck subsection; carrying the deck subsection on the cargo hold, and reversely connecting the second sample punching mark on the deck subsection to a ship body inner bottom plate of the cargo hold to determine the mounting position of the pump tower base; a pump tower base is installed, and the pump tower is hoisted on the pump tower base; hoisting the liquid dome subsection into the hole of the deck subsection, so that the first sample punching mark on the liquid dome subsection is aligned with the axis of the pump tower; and the liquid dome subsection, the pump tower, the cargo hold and the deck subsection are welded into a whole. The positioning and
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112158310A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112158310A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112158310A3</originalsourceid><addsrcrecordid>eNrjZDD28XNXKM7ILFAoKM0tUCjJL08tUijIL84syczPy8xLV0jMS1HIzS_NKwFxclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoaGRoamFsaGBozExagDooSxG</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>LNG ship pump tower positioning and mounting method</title><source>esp@cenet</source><creator>ZHI YINFENG ; LI CHEN ; GAO PAN ; JI LIXIANG</creator><creatorcontrib>ZHI YINFENG ; LI CHEN ; GAO PAN ; JI LIXIANG</creatorcontrib><description>The invention discloses a method for positioning and installing a pump tower of an LNG ship. The method specifically comprises the following steps that a liquid dome section and a deck section are manufactured; marking a first sample punching mark on the inner deck of the liquid dome subsection, and marking a second sample punching mark on the inner deck of the deck subsection; carrying the deck subsection on the cargo hold, and reversely connecting the second sample punching mark on the deck subsection to a ship body inner bottom plate of the cargo hold to determine the mounting position of the pump tower base; a pump tower base is installed, and the pump tower is hoisted on the pump tower base; hoisting the liquid dome subsection into the hole of the deck subsection, so that the first sample punching mark on the liquid dome subsection is aligned with the axis of the pump tower; and the liquid dome subsection, the pump tower, the cargo hold and the deck subsection are welded into a whole. The positioning and</description><language>chi ; eng</language><subject>EQUIPMENT FOR SHIPPING ; PERFORMING OPERATIONS ; RELATED EQUIPMENT ; SHIPS OR OTHER WATERBORNE VESSELS ; TRANSPORTING</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210101&amp;DB=EPODOC&amp;CC=CN&amp;NR=112158310A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210101&amp;DB=EPODOC&amp;CC=CN&amp;NR=112158310A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHI YINFENG</creatorcontrib><creatorcontrib>LI CHEN</creatorcontrib><creatorcontrib>GAO PAN</creatorcontrib><creatorcontrib>JI LIXIANG</creatorcontrib><title>LNG ship pump tower positioning and mounting method</title><description>The invention discloses a method for positioning and installing a pump tower of an LNG ship. The method specifically comprises the following steps that a liquid dome section and a deck section are manufactured; marking a first sample punching mark on the inner deck of the liquid dome subsection, and marking a second sample punching mark on the inner deck of the deck subsection; carrying the deck subsection on the cargo hold, and reversely connecting the second sample punching mark on the deck subsection to a ship body inner bottom plate of the cargo hold to determine the mounting position of the pump tower base; a pump tower base is installed, and the pump tower is hoisted on the pump tower base; hoisting the liquid dome subsection into the hole of the deck subsection, so that the first sample punching mark on the liquid dome subsection is aligned with the axis of the pump tower; and the liquid dome subsection, the pump tower, the cargo hold and the deck subsection are welded into a whole. The positioning and</description><subject>EQUIPMENT FOR SHIPPING</subject><subject>PERFORMING OPERATIONS</subject><subject>RELATED EQUIPMENT</subject><subject>SHIPS OR OTHER WATERBORNE VESSELS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD28XNXKM7ILFAoKM0tUCjJL08tUijIL84syczPy8xLV0jMS1HIzS_NKwFxclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoaGRoamFsaGBozExagDooSxG</recordid><startdate>20210101</startdate><enddate>20210101</enddate><creator>ZHI YINFENG</creator><creator>LI CHEN</creator><creator>GAO PAN</creator><creator>JI LIXIANG</creator><scope>EVB</scope></search><sort><creationdate>20210101</creationdate><title>LNG ship pump tower positioning and mounting method</title><author>ZHI YINFENG ; LI CHEN ; GAO PAN ; JI LIXIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112158310A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EQUIPMENT FOR SHIPPING</topic><topic>PERFORMING OPERATIONS</topic><topic>RELATED EQUIPMENT</topic><topic>SHIPS OR OTHER WATERBORNE VESSELS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHI YINFENG</creatorcontrib><creatorcontrib>LI CHEN</creatorcontrib><creatorcontrib>GAO PAN</creatorcontrib><creatorcontrib>JI LIXIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHI YINFENG</au><au>LI CHEN</au><au>GAO PAN</au><au>JI LIXIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>LNG ship pump tower positioning and mounting method</title><date>2021-01-01</date><risdate>2021</risdate><abstract>The invention discloses a method for positioning and installing a pump tower of an LNG ship. The method specifically comprises the following steps that a liquid dome section and a deck section are manufactured; marking a first sample punching mark on the inner deck of the liquid dome subsection, and marking a second sample punching mark on the inner deck of the deck subsection; carrying the deck subsection on the cargo hold, and reversely connecting the second sample punching mark on the deck subsection to a ship body inner bottom plate of the cargo hold to determine the mounting position of the pump tower base; a pump tower base is installed, and the pump tower is hoisted on the pump tower base; hoisting the liquid dome subsection into the hole of the deck subsection, so that the first sample punching mark on the liquid dome subsection is aligned with the axis of the pump tower; and the liquid dome subsection, the pump tower, the cargo hold and the deck subsection are welded into a whole. The positioning and</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112158310A
source esp@cenet
subjects EQUIPMENT FOR SHIPPING
PERFORMING OPERATIONS
RELATED EQUIPMENT
SHIPS OR OTHER WATERBORNE VESSELS
TRANSPORTING
title LNG ship pump tower positioning and mounting method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T23%3A28%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHI%20YINFENG&rft.date=2021-01-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112158310A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true