Open-cut tunnel prefabricated lining prestress connecting structure and method of upper and lower blocks

The invention belongs to the technical field of underground structure engineering, and particularly relates to an open-cut tunnel prefabricated lining prestress connecting structure of upper and lowerblocks. The open-cut tunnel prefabricated lining prestress connecting structure is formed by longitu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FU RUI'AN, XIAO MINGQING, LYU YANHAO, SHUAI BIN, YOU LONGFEI, ZHOU JIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FU RUI'AN
XIAO MINGQING
LYU YANHAO
SHUAI BIN
YOU LONGFEI
ZHOU JIAN
description The invention belongs to the technical field of underground structure engineering, and particularly relates to an open-cut tunnel prefabricated lining prestress connecting structure of upper and lowerblocks. The open-cut tunnel prefabricated lining prestress connecting structure is formed by longitudinally splicing a plurality of lining rings; each lining ring comprises a prefabricated lining upper block and a prefabricated lining lower block; and a plurality of vertically penetrated vertical prestress tensioning holes are correspondingly formed in a top plate and an upper side wall of each prefabricated lining upper block and a bottom plate and a lower side wall of each prefabricated lining lower block. The same prestress twisted steel is tensioned in the corresponding vertical prestressed tensioning holes in the vertical direction, and fine aggregate concrete is injected in a pressing mode. According to a connecting method, the vertical prestress connection of the prefabricated lining upper blocks and the p
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112112194A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112112194A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112112194A3</originalsourceid><addsrcrecordid>eNqNijEOwjAQBNNQIOAPxwNSBGgoUQSigoY-cs5nYsWcLfssvo-NeADSrnY1mmUz3QNxi1lAMjM5CJGMGqNFJaTBWbb8rDBJaQL0xUKpsJCMkiOBYg0vkslr8AZyCBS_zPl3eaPzOKd1szDKJdr8dtVsL-dHf20p-IFSUEhMMvS3rtvVHA-n_T_OB2JjQNw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Open-cut tunnel prefabricated lining prestress connecting structure and method of upper and lower blocks</title><source>esp@cenet</source><creator>FU RUI'AN ; XIAO MINGQING ; LYU YANHAO ; SHUAI BIN ; YOU LONGFEI ; ZHOU JIAN</creator><creatorcontrib>FU RUI'AN ; XIAO MINGQING ; LYU YANHAO ; SHUAI BIN ; YOU LONGFEI ; ZHOU JIAN</creatorcontrib><description>The invention belongs to the technical field of underground structure engineering, and particularly relates to an open-cut tunnel prefabricated lining prestress connecting structure of upper and lowerblocks. The open-cut tunnel prefabricated lining prestress connecting structure is formed by longitudinally splicing a plurality of lining rings; each lining ring comprises a prefabricated lining upper block and a prefabricated lining lower block; and a plurality of vertically penetrated vertical prestress tensioning holes are correspondingly formed in a top plate and an upper side wall of each prefabricated lining upper block and a bottom plate and a lower side wall of each prefabricated lining lower block. The same prestress twisted steel is tensioned in the corresponding vertical prestressed tensioning holes in the vertical direction, and fine aggregate concrete is injected in a pressing mode. According to a connecting method, the vertical prestress connection of the prefabricated lining upper blocks and the p</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201222&amp;DB=EPODOC&amp;CC=CN&amp;NR=112112194A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201222&amp;DB=EPODOC&amp;CC=CN&amp;NR=112112194A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FU RUI'AN</creatorcontrib><creatorcontrib>XIAO MINGQING</creatorcontrib><creatorcontrib>LYU YANHAO</creatorcontrib><creatorcontrib>SHUAI BIN</creatorcontrib><creatorcontrib>YOU LONGFEI</creatorcontrib><creatorcontrib>ZHOU JIAN</creatorcontrib><title>Open-cut tunnel prefabricated lining prestress connecting structure and method of upper and lower blocks</title><description>The invention belongs to the technical field of underground structure engineering, and particularly relates to an open-cut tunnel prefabricated lining prestress connecting structure of upper and lowerblocks. The open-cut tunnel prefabricated lining prestress connecting structure is formed by longitudinally splicing a plurality of lining rings; each lining ring comprises a prefabricated lining upper block and a prefabricated lining lower block; and a plurality of vertically penetrated vertical prestress tensioning holes are correspondingly formed in a top plate and an upper side wall of each prefabricated lining upper block and a bottom plate and a lower side wall of each prefabricated lining lower block. The same prestress twisted steel is tensioned in the corresponding vertical prestressed tensioning holes in the vertical direction, and fine aggregate concrete is injected in a pressing mode. According to a connecting method, the vertical prestress connection of the prefabricated lining upper blocks and the p</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEOwjAQBNNQIOAPxwNSBGgoUQSigoY-cs5nYsWcLfssvo-NeADSrnY1mmUz3QNxi1lAMjM5CJGMGqNFJaTBWbb8rDBJaQL0xUKpsJCMkiOBYg0vkslr8AZyCBS_zPl3eaPzOKd1szDKJdr8dtVsL-dHf20p-IFSUEhMMvS3rtvVHA-n_T_OB2JjQNw</recordid><startdate>20201222</startdate><enddate>20201222</enddate><creator>FU RUI'AN</creator><creator>XIAO MINGQING</creator><creator>LYU YANHAO</creator><creator>SHUAI BIN</creator><creator>YOU LONGFEI</creator><creator>ZHOU JIAN</creator><scope>EVB</scope></search><sort><creationdate>20201222</creationdate><title>Open-cut tunnel prefabricated lining prestress connecting structure and method of upper and lower blocks</title><author>FU RUI'AN ; XIAO MINGQING ; LYU YANHAO ; SHUAI BIN ; YOU LONGFEI ; ZHOU JIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112112194A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>FU RUI'AN</creatorcontrib><creatorcontrib>XIAO MINGQING</creatorcontrib><creatorcontrib>LYU YANHAO</creatorcontrib><creatorcontrib>SHUAI BIN</creatorcontrib><creatorcontrib>YOU LONGFEI</creatorcontrib><creatorcontrib>ZHOU JIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FU RUI'AN</au><au>XIAO MINGQING</au><au>LYU YANHAO</au><au>SHUAI BIN</au><au>YOU LONGFEI</au><au>ZHOU JIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Open-cut tunnel prefabricated lining prestress connecting structure and method of upper and lower blocks</title><date>2020-12-22</date><risdate>2020</risdate><abstract>The invention belongs to the technical field of underground structure engineering, and particularly relates to an open-cut tunnel prefabricated lining prestress connecting structure of upper and lowerblocks. The open-cut tunnel prefabricated lining prestress connecting structure is formed by longitudinally splicing a plurality of lining rings; each lining ring comprises a prefabricated lining upper block and a prefabricated lining lower block; and a plurality of vertically penetrated vertical prestress tensioning holes are correspondingly formed in a top plate and an upper side wall of each prefabricated lining upper block and a bottom plate and a lower side wall of each prefabricated lining lower block. The same prestress twisted steel is tensioned in the corresponding vertical prestressed tensioning holes in the vertical direction, and fine aggregate concrete is injected in a pressing mode. According to a connecting method, the vertical prestress connection of the prefabricated lining upper blocks and the p</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112112194A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Open-cut tunnel prefabricated lining prestress connecting structure and method of upper and lower blocks
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T11%3A42%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FU%20RUI'AN&rft.date=2020-12-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112112194A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true