Construction method of cornice formwork
The application relates to a construction method of a cornice formwork, and relates to the technical field of formwork supporting systems. The construction method solves the technical problems of troublesome operation, inconvenience in mounting and low rigidity of a frame body and the whole body in...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG BEIBEI SUN LIANG CHENG JIAJIA LI ZENGZHUANG YUAN MEI MA FENGXIANG |
description | The application relates to a construction method of a cornice formwork, and relates to the technical field of formwork supporting systems. The construction method solves the technical problems of troublesome operation, inconvenience in mounting and low rigidity of a frame body and the whole body in actual construction of an overhanging structure formwork. The construction method comprises the following steps that: S1, a quadrangular special-shaped supporting platform frame is mounted, the four-corner special-shaped supporting platform frame comprises a vertical beam, an upper cross beam is welded to the upper end of the vertical beam, a lower cross beam is welded to the lower end of the vertical beam, the upper cross beam and the lower cross beam are parallel to each other and are respectively perpendicular to the vertical beam, the length of the upper cross beam is larger than that of the lower cross beam, and an oblique beam is connected between the upper cross beam and the lower cross beam, one end of the |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112049415A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112049415A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112049415A3</originalsourceid><addsrcrecordid>eNrjZFB3zs8rLikqTS7JzM9TyE0tychPUchPU0jOL8rLTE5VSMsvyi3PL8rmYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhkYGJpYmhqaOxsSoAQDH7Sg_</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of cornice formwork</title><source>esp@cenet</source><creator>ZHANG BEIBEI ; SUN LIANG ; CHENG JIAJIA ; LI ZENGZHUANG ; YUAN MEI ; MA FENGXIANG</creator><creatorcontrib>ZHANG BEIBEI ; SUN LIANG ; CHENG JIAJIA ; LI ZENGZHUANG ; YUAN MEI ; MA FENGXIANG</creatorcontrib><description>The application relates to a construction method of a cornice formwork, and relates to the technical field of formwork supporting systems. The construction method solves the technical problems of troublesome operation, inconvenience in mounting and low rigidity of a frame body and the whole body in actual construction of an overhanging structure formwork. The construction method comprises the following steps that: S1, a quadrangular special-shaped supporting platform frame is mounted, the four-corner special-shaped supporting platform frame comprises a vertical beam, an upper cross beam is welded to the upper end of the vertical beam, a lower cross beam is welded to the lower end of the vertical beam, the upper cross beam and the lower cross beam are parallel to each other and are respectively perpendicular to the vertical beam, the length of the upper cross beam is larger than that of the lower cross beam, and an oblique beam is connected between the upper cross beam and the lower cross beam, one end of the</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201208&DB=EPODOC&CC=CN&NR=112049415A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201208&DB=EPODOC&CC=CN&NR=112049415A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG BEIBEI</creatorcontrib><creatorcontrib>SUN LIANG</creatorcontrib><creatorcontrib>CHENG JIAJIA</creatorcontrib><creatorcontrib>LI ZENGZHUANG</creatorcontrib><creatorcontrib>YUAN MEI</creatorcontrib><creatorcontrib>MA FENGXIANG</creatorcontrib><title>Construction method of cornice formwork</title><description>The application relates to a construction method of a cornice formwork, and relates to the technical field of formwork supporting systems. The construction method solves the technical problems of troublesome operation, inconvenience in mounting and low rigidity of a frame body and the whole body in actual construction of an overhanging structure formwork. The construction method comprises the following steps that: S1, a quadrangular special-shaped supporting platform frame is mounted, the four-corner special-shaped supporting platform frame comprises a vertical beam, an upper cross beam is welded to the upper end of the vertical beam, a lower cross beam is welded to the lower end of the vertical beam, the upper cross beam and the lower cross beam are parallel to each other and are respectively perpendicular to the vertical beam, the length of the upper cross beam is larger than that of the lower cross beam, and an oblique beam is connected between the upper cross beam and the lower cross beam, one end of the</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB3zs8rLikqTS7JzM9TyE0tychPUchPU0jOL8rLTE5VSMsvyi3PL8rmYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhkYGJpYmhqaOxsSoAQDH7Sg_</recordid><startdate>20201208</startdate><enddate>20201208</enddate><creator>ZHANG BEIBEI</creator><creator>SUN LIANG</creator><creator>CHENG JIAJIA</creator><creator>LI ZENGZHUANG</creator><creator>YUAN MEI</creator><creator>MA FENGXIANG</creator><scope>EVB</scope></search><sort><creationdate>20201208</creationdate><title>Construction method of cornice formwork</title><author>ZHANG BEIBEI ; SUN LIANG ; CHENG JIAJIA ; LI ZENGZHUANG ; YUAN MEI ; MA FENGXIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112049415A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG BEIBEI</creatorcontrib><creatorcontrib>SUN LIANG</creatorcontrib><creatorcontrib>CHENG JIAJIA</creatorcontrib><creatorcontrib>LI ZENGZHUANG</creatorcontrib><creatorcontrib>YUAN MEI</creatorcontrib><creatorcontrib>MA FENGXIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG BEIBEI</au><au>SUN LIANG</au><au>CHENG JIAJIA</au><au>LI ZENGZHUANG</au><au>YUAN MEI</au><au>MA FENGXIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of cornice formwork</title><date>2020-12-08</date><risdate>2020</risdate><abstract>The application relates to a construction method of a cornice formwork, and relates to the technical field of formwork supporting systems. The construction method solves the technical problems of troublesome operation, inconvenience in mounting and low rigidity of a frame body and the whole body in actual construction of an overhanging structure formwork. The construction method comprises the following steps that: S1, a quadrangular special-shaped supporting platform frame is mounted, the four-corner special-shaped supporting platform frame comprises a vertical beam, an upper cross beam is welded to the upper end of the vertical beam, a lower cross beam is welded to the lower end of the vertical beam, the upper cross beam and the lower cross beam are parallel to each other and are respectively perpendicular to the vertical beam, the length of the upper cross beam is larger than that of the lower cross beam, and an oblique beam is connected between the upper cross beam and the lower cross beam, one end of the</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112049415A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Construction method of cornice formwork |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T14%3A20%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20BEIBEI&rft.date=2020-12-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112049415A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |