Risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method
The invention relates to a toll station traffic flow control method, in particular to a risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method. The objectiveof the invention is to solve problems that existing expressway main line risk prevention and control...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SONG XIANMIN BAI QIAOWEN LI ZHIHUI LENG NING TIAN JING TAO PENGFEI GAO YUHONG |
description | The invention relates to a toll station traffic flow control method, in particular to a risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method. The objectiveof the invention is to solve problems that existing expressway main line risk prevention and control measures are extensive, and the release amount of a toll station cannot be accurately judged according to the remaining traffic capacity of a road section under the influence of a specific risk source. The method comprises the following steps: 1, acquiring risk source information of an expresswaymain road section and traffic flow information of the upstream of a risk road section and a ramp road section; 2, calculating the residual bearing capacity of the risk road section; 3, judging whetherthe toll station adopts opening or closing control; if the toll station is opened, judging whether a toll station ETC barrier gate delay opening control scheme is implemented or not; 4, if the ETC barrier gate delay opening sc |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112037351A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112037351A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112037351A3</originalsourceid><addsrcrecordid>eNqNjDEKAjEQRbexEPUO4wECxiDWsihWFmK_jJtxNxhnQjII3t4IewCrD--__-cNXkN5mpTpTaxB2CB70wtrlmgkh0rJg0qMUBR_BhxvLdwx1y7DgErgKeKnWpKIAw8wzeFFOopfNrMHxkKrKRfN-lQvzoaSdFQS9sSkXXuxdrtxe7ezB_eP8wU5WD3m</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method</title><source>esp@cenet</source><creator>SONG XIANMIN ; BAI QIAOWEN ; LI ZHIHUI ; LENG NING ; TIAN JING ; TAO PENGFEI ; GAO YUHONG</creator><creatorcontrib>SONG XIANMIN ; BAI QIAOWEN ; LI ZHIHUI ; LENG NING ; TIAN JING ; TAO PENGFEI ; GAO YUHONG</creatorcontrib><description>The invention relates to a toll station traffic flow control method, in particular to a risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method. The objectiveof the invention is to solve problems that existing expressway main line risk prevention and control measures are extensive, and the release amount of a toll station cannot be accurately judged according to the remaining traffic capacity of a road section under the influence of a specific risk source. The method comprises the following steps: 1, acquiring risk source information of an expresswaymain road section and traffic flow information of the upstream of a risk road section and a ramp road section; 2, calculating the residual bearing capacity of the risk road section; 3, judging whetherthe toll station adopts opening or closing control; if the toll station is opened, judging whether a toll station ETC barrier gate delay opening control scheme is implemented or not; 4, if the ETC barrier gate delay opening sc</description><language>chi ; eng</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; CHECKING-DEVICES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FARE-REGISTERING APPARATUS ; FIXED CONSTRUCTIONS ; FRANKING APPARATUS ; PHYSICS ; SIGNALLING ; TICKET-ISSUING APPARATUS ; TRAFFIC CONTROL SYSTEMS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201204&DB=EPODOC&CC=CN&NR=112037351A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201204&DB=EPODOC&CC=CN&NR=112037351A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SONG XIANMIN</creatorcontrib><creatorcontrib>BAI QIAOWEN</creatorcontrib><creatorcontrib>LI ZHIHUI</creatorcontrib><creatorcontrib>LENG NING</creatorcontrib><creatorcontrib>TIAN JING</creatorcontrib><creatorcontrib>TAO PENGFEI</creatorcontrib><creatorcontrib>GAO YUHONG</creatorcontrib><title>Risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method</title><description>The invention relates to a toll station traffic flow control method, in particular to a risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method. The objectiveof the invention is to solve problems that existing expressway main line risk prevention and control measures are extensive, and the release amount of a toll station cannot be accurately judged according to the remaining traffic capacity of a road section under the influence of a specific risk source. The method comprises the following steps: 1, acquiring risk source information of an expresswaymain road section and traffic flow information of the upstream of a risk road section and a ramp road section; 2, calculating the residual bearing capacity of the risk road section; 3, judging whetherthe toll station adopts opening or closing control; if the toll station is opened, judging whether a toll station ETC barrier gate delay opening control scheme is implemented or not; 4, if the ETC barrier gate delay opening sc</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>CHECKING-DEVICES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FARE-REGISTERING APPARATUS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FRANKING APPARATUS</subject><subject>PHYSICS</subject><subject>SIGNALLING</subject><subject>TICKET-ISSUING APPARATUS</subject><subject>TRAFFIC CONTROL SYSTEMS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEKAjEQRbexEPUO4wECxiDWsihWFmK_jJtxNxhnQjII3t4IewCrD--__-cNXkN5mpTpTaxB2CB70wtrlmgkh0rJg0qMUBR_BhxvLdwx1y7DgErgKeKnWpKIAw8wzeFFOopfNrMHxkKrKRfN-lQvzoaSdFQS9sSkXXuxdrtxe7ezB_eP8wU5WD3m</recordid><startdate>20201204</startdate><enddate>20201204</enddate><creator>SONG XIANMIN</creator><creator>BAI QIAOWEN</creator><creator>LI ZHIHUI</creator><creator>LENG NING</creator><creator>TIAN JING</creator><creator>TAO PENGFEI</creator><creator>GAO YUHONG</creator><scope>EVB</scope></search><sort><creationdate>20201204</creationdate><title>Risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method</title><author>SONG XIANMIN ; BAI QIAOWEN ; LI ZHIHUI ; LENG NING ; TIAN JING ; TAO PENGFEI ; GAO YUHONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112037351A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>CHECKING-DEVICES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FARE-REGISTERING APPARATUS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FRANKING APPARATUS</topic><topic>PHYSICS</topic><topic>SIGNALLING</topic><topic>TICKET-ISSUING APPARATUS</topic><topic>TRAFFIC CONTROL SYSTEMS</topic><toplevel>online_resources</toplevel><creatorcontrib>SONG XIANMIN</creatorcontrib><creatorcontrib>BAI QIAOWEN</creatorcontrib><creatorcontrib>LI ZHIHUI</creatorcontrib><creatorcontrib>LENG NING</creatorcontrib><creatorcontrib>TIAN JING</creatorcontrib><creatorcontrib>TAO PENGFEI</creatorcontrib><creatorcontrib>GAO YUHONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SONG XIANMIN</au><au>BAI QIAOWEN</au><au>LI ZHIHUI</au><au>LENG NING</au><au>TIAN JING</au><au>TAO PENGFEI</au><au>GAO YUHONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method</title><date>2020-12-04</date><risdate>2020</risdate><abstract>The invention relates to a toll station traffic flow control method, in particular to a risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method. The objectiveof the invention is to solve problems that existing expressway main line risk prevention and control measures are extensive, and the release amount of a toll station cannot be accurately judged according to the remaining traffic capacity of a road section under the influence of a specific risk source. The method comprises the following steps: 1, acquiring risk source information of an expresswaymain road section and traffic flow information of the upstream of a risk road section and a ramp road section; 2, calculating the residual bearing capacity of the risk road section; 3, judging whetherthe toll station adopts opening or closing control; if the toll station is opened, judging whether a toll station ETC barrier gate delay opening control scheme is implemented or not; 4, if the ETC barrier gate delay opening sc</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112037351A |
source | esp@cenet |
subjects | ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE CHECKING-DEVICES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FARE-REGISTERING APPARATUS FIXED CONSTRUCTIONS FRANKING APPARATUS PHYSICS SIGNALLING TICKET-ISSUING APPARATUS TRAFFIC CONTROL SYSTEMS |
title | Risk-prevention-and-control-oriented toll station ETC barrier gate delayed opening control method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T17%3A12%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SONG%20XIANMIN&rft.date=2020-12-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112037351A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |