No.45 steel semi-grouting sleeve structure and method thereof

The invention discloses a No.45 steel casting semi-grouting sleeve structure and a method thereof. The structure comprises a sleeve, a prefabricated end steel bar, an assembly end steel bar, a grout outlet nozzle and a grouting nozzle, wherein the front end of the sleeve is a prefabricated end, one...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JIA ZHENGHAO, ZHANG XUEKONG, WANG QIXIANG, REN BAOJIU, LIU ZHICAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator JIA ZHENGHAO
ZHANG XUEKONG
WANG QIXIANG
REN BAOJIU
LIU ZHICAI
description The invention discloses a No.45 steel casting semi-grouting sleeve structure and a method thereof. The structure comprises a sleeve, a prefabricated end steel bar, an assembly end steel bar, a grout outlet nozzle and a grouting nozzle, wherein the front end of the sleeve is a prefabricated end, one end of the prefabricated end is fixedly connected with the assembly end through a transition end, athreaded hole is formed in one end of the prefabricated end, the threaded hole is in threaded connection with an external thread at one end of a prefabricated end steel bar, the assembly end steel baris installed at one end of the assembly end, a spiral rolling groove is formed in the outer surface of the assembly end, a spiral rolling protrusion is arranged on the inner surface of the assembly end, the grout outlet nozzle is installed on one side of the outer surface of the assembly end, and the grouting nozzle is installed on the other side of the assembly end. According to the casting semi-grouting sleeve structure
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111997270A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111997270A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111997270A3</originalsourceid><addsrcrecordid>eNrjZLD1y9czMVUoLklNzVEoTs3N1E0vyi8tycxLVyjOSU0tSwVKFZUml5QWpSok5qUo5KaWZOSnKJRkpBal5qfxMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DQ0NLS3MjcwNHY2LUAADlQy_f</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>No.45 steel semi-grouting sleeve structure and method thereof</title><source>esp@cenet</source><creator>JIA ZHENGHAO ; ZHANG XUEKONG ; WANG QIXIANG ; REN BAOJIU ; LIU ZHICAI</creator><creatorcontrib>JIA ZHENGHAO ; ZHANG XUEKONG ; WANG QIXIANG ; REN BAOJIU ; LIU ZHICAI</creatorcontrib><description>The invention discloses a No.45 steel casting semi-grouting sleeve structure and a method thereof. The structure comprises a sleeve, a prefabricated end steel bar, an assembly end steel bar, a grout outlet nozzle and a grouting nozzle, wherein the front end of the sleeve is a prefabricated end, one end of the prefabricated end is fixedly connected with the assembly end through a transition end, athreaded hole is formed in one end of the prefabricated end, the threaded hole is in threaded connection with an external thread at one end of a prefabricated end steel bar, the assembly end steel baris installed at one end of the assembly end, a spiral rolling groove is formed in the outer surface of the assembly end, a spiral rolling protrusion is arranged on the inner surface of the assembly end, the grout outlet nozzle is installed on one side of the outer surface of the assembly end, and the grouting nozzle is installed on the other side of the assembly end. According to the casting semi-grouting sleeve structure</description><language>chi ; eng</language><subject>BUILDING ; BUILDING MATERIALS ; FIXED CONSTRUCTIONS ; STRUCTURAL ELEMENTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201127&amp;DB=EPODOC&amp;CC=CN&amp;NR=111997270A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201127&amp;DB=EPODOC&amp;CC=CN&amp;NR=111997270A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIA ZHENGHAO</creatorcontrib><creatorcontrib>ZHANG XUEKONG</creatorcontrib><creatorcontrib>WANG QIXIANG</creatorcontrib><creatorcontrib>REN BAOJIU</creatorcontrib><creatorcontrib>LIU ZHICAI</creatorcontrib><title>No.45 steel semi-grouting sleeve structure and method thereof</title><description>The invention discloses a No.45 steel casting semi-grouting sleeve structure and a method thereof. The structure comprises a sleeve, a prefabricated end steel bar, an assembly end steel bar, a grout outlet nozzle and a grouting nozzle, wherein the front end of the sleeve is a prefabricated end, one end of the prefabricated end is fixedly connected with the assembly end through a transition end, athreaded hole is formed in one end of the prefabricated end, the threaded hole is in threaded connection with an external thread at one end of a prefabricated end steel bar, the assembly end steel baris installed at one end of the assembly end, a spiral rolling groove is formed in the outer surface of the assembly end, a spiral rolling protrusion is arranged on the inner surface of the assembly end, the grout outlet nozzle is installed on one side of the outer surface of the assembly end, and the grouting nozzle is installed on the other side of the assembly end. According to the casting semi-grouting sleeve structure</description><subject>BUILDING</subject><subject>BUILDING MATERIALS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>STRUCTURAL ELEMENTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLD1y9czMVUoLklNzVEoTs3N1E0vyi8tycxLVyjOSU0tSwVKFZUml5QWpSok5qUo5KaWZOSnKJRkpBal5qfxMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DQ0NLS3MjcwNHY2LUAADlQy_f</recordid><startdate>20201127</startdate><enddate>20201127</enddate><creator>JIA ZHENGHAO</creator><creator>ZHANG XUEKONG</creator><creator>WANG QIXIANG</creator><creator>REN BAOJIU</creator><creator>LIU ZHICAI</creator><scope>EVB</scope></search><sort><creationdate>20201127</creationdate><title>No.45 steel semi-grouting sleeve structure and method thereof</title><author>JIA ZHENGHAO ; ZHANG XUEKONG ; WANG QIXIANG ; REN BAOJIU ; LIU ZHICAI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111997270A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>BUILDING</topic><topic>BUILDING MATERIALS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>STRUCTURAL ELEMENTS</topic><toplevel>online_resources</toplevel><creatorcontrib>JIA ZHENGHAO</creatorcontrib><creatorcontrib>ZHANG XUEKONG</creatorcontrib><creatorcontrib>WANG QIXIANG</creatorcontrib><creatorcontrib>REN BAOJIU</creatorcontrib><creatorcontrib>LIU ZHICAI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIA ZHENGHAO</au><au>ZHANG XUEKONG</au><au>WANG QIXIANG</au><au>REN BAOJIU</au><au>LIU ZHICAI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>No.45 steel semi-grouting sleeve structure and method thereof</title><date>2020-11-27</date><risdate>2020</risdate><abstract>The invention discloses a No.45 steel casting semi-grouting sleeve structure and a method thereof. The structure comprises a sleeve, a prefabricated end steel bar, an assembly end steel bar, a grout outlet nozzle and a grouting nozzle, wherein the front end of the sleeve is a prefabricated end, one end of the prefabricated end is fixedly connected with the assembly end through a transition end, athreaded hole is formed in one end of the prefabricated end, the threaded hole is in threaded connection with an external thread at one end of a prefabricated end steel bar, the assembly end steel baris installed at one end of the assembly end, a spiral rolling groove is formed in the outer surface of the assembly end, a spiral rolling protrusion is arranged on the inner surface of the assembly end, the grout outlet nozzle is installed on one side of the outer surface of the assembly end, and the grouting nozzle is installed on the other side of the assembly end. According to the casting semi-grouting sleeve structure</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111997270A
source esp@cenet
subjects BUILDING
BUILDING MATERIALS
FIXED CONSTRUCTIONS
STRUCTURAL ELEMENTS
title No.45 steel semi-grouting sleeve structure and method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T06%3A45%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIA%20ZHENGHAO&rft.date=2020-11-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111997270A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true