Bracket for installing soil pressure meter in construction period of deep foundation pit and using method thereof

The invention discloses a bracket for installing a soil pressure meter in a construction period of a deep foundation pit. The bracket comprises threaded rods, winches, pushing rods and a secondary meter. One or more reinforcement cages are arranged, and one or more steel wire ropes are disposed. The...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XU KUNZHEN, SHEN MINGYI, LU ANDIAN, SHI WENGUANG, ZHOU YIXIN, SUN YUANHUI, ZHENG DONG, LIU HONGLIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XU KUNZHEN
SHEN MINGYI
LU ANDIAN
SHI WENGUANG
ZHOU YIXIN
SUN YUANHUI
ZHENG DONG
LIU HONGLIANG
description The invention discloses a bracket for installing a soil pressure meter in a construction period of a deep foundation pit. The bracket comprises threaded rods, winches, pushing rods and a secondary meter. One or more reinforcement cages are arranged, and one or more steel wire ropes are disposed. The upper ends of the steel wire ropes are fixed to the tops of the reinforcement cages; one ends of the threaded rods are welded to steel bars in the reinforcement cages, the other ends of the threaded rods penetrate through the winches and are sleeved with the pushing rods, and the axis of each threaded rod is perpendicular to the side face of a soil retaining side; each winch comprises a winch wheel, a winch steel pipe and a winch steel wire shaft; the steel wire ropes are wound on the peripheries of the winch wheels, and the winch steel pipes are connected with the threaded rods through threads; one end of each pushing rod is connected with the corresponding winch steel pipe, and the otherend of each pushing rod a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111997104A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111997104A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111997104A3</originalsourceid><addsrcrecordid>eNqNjDsKAjEURdNYiLqH5wIEg4JMqYNiZWU_hOTGCca8mM_-zaALsLrFOffMxfuUlH6ikOVELuSivHfhQZmdp5iQc02gFwomTJqbkqoujgNFJMeG2JIBYivUYNSXuEIqGKp5arX32LwyIoHtUsys8hmr3y7E-nK-99cNIg_IUWkElKG_SSm77iC3--PuH-cD5FREIg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Bracket for installing soil pressure meter in construction period of deep foundation pit and using method thereof</title><source>esp@cenet</source><creator>XU KUNZHEN ; SHEN MINGYI ; LU ANDIAN ; SHI WENGUANG ; ZHOU YIXIN ; SUN YUANHUI ; ZHENG DONG ; LIU HONGLIANG</creator><creatorcontrib>XU KUNZHEN ; SHEN MINGYI ; LU ANDIAN ; SHI WENGUANG ; ZHOU YIXIN ; SUN YUANHUI ; ZHENG DONG ; LIU HONGLIANG</creatorcontrib><description>The invention discloses a bracket for installing a soil pressure meter in a construction period of a deep foundation pit. The bracket comprises threaded rods, winches, pushing rods and a secondary meter. One or more reinforcement cages are arranged, and one or more steel wire ropes are disposed. The upper ends of the steel wire ropes are fixed to the tops of the reinforcement cages; one ends of the threaded rods are welded to steel bars in the reinforcement cages, the other ends of the threaded rods penetrate through the winches and are sleeved with the pushing rods, and the axis of each threaded rod is perpendicular to the side face of a soil retaining side; each winch comprises a winch wheel, a winch steel pipe and a winch steel wire shaft; the steel wire ropes are wound on the peripheries of the winch wheels, and the winch steel pipes are connected with the threaded rods through threads; one end of each pushing rod is connected with the corresponding winch steel pipe, and the otherend of each pushing rod a</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201127&amp;DB=EPODOC&amp;CC=CN&amp;NR=111997104A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201127&amp;DB=EPODOC&amp;CC=CN&amp;NR=111997104A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XU KUNZHEN</creatorcontrib><creatorcontrib>SHEN MINGYI</creatorcontrib><creatorcontrib>LU ANDIAN</creatorcontrib><creatorcontrib>SHI WENGUANG</creatorcontrib><creatorcontrib>ZHOU YIXIN</creatorcontrib><creatorcontrib>SUN YUANHUI</creatorcontrib><creatorcontrib>ZHENG DONG</creatorcontrib><creatorcontrib>LIU HONGLIANG</creatorcontrib><title>Bracket for installing soil pressure meter in construction period of deep foundation pit and using method thereof</title><description>The invention discloses a bracket for installing a soil pressure meter in a construction period of a deep foundation pit. The bracket comprises threaded rods, winches, pushing rods and a secondary meter. One or more reinforcement cages are arranged, and one or more steel wire ropes are disposed. The upper ends of the steel wire ropes are fixed to the tops of the reinforcement cages; one ends of the threaded rods are welded to steel bars in the reinforcement cages, the other ends of the threaded rods penetrate through the winches and are sleeved with the pushing rods, and the axis of each threaded rod is perpendicular to the side face of a soil retaining side; each winch comprises a winch wheel, a winch steel pipe and a winch steel wire shaft; the steel wire ropes are wound on the peripheries of the winch wheels, and the winch steel pipes are connected with the threaded rods through threads; one end of each pushing rod is connected with the corresponding winch steel pipe, and the otherend of each pushing rod a</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDsKAjEURdNYiLqH5wIEg4JMqYNiZWU_hOTGCca8mM_-zaALsLrFOffMxfuUlH6ikOVELuSivHfhQZmdp5iQc02gFwomTJqbkqoujgNFJMeG2JIBYivUYNSXuEIqGKp5arX32LwyIoHtUsys8hmr3y7E-nK-99cNIg_IUWkElKG_SSm77iC3--PuH-cD5FREIg</recordid><startdate>20201127</startdate><enddate>20201127</enddate><creator>XU KUNZHEN</creator><creator>SHEN MINGYI</creator><creator>LU ANDIAN</creator><creator>SHI WENGUANG</creator><creator>ZHOU YIXIN</creator><creator>SUN YUANHUI</creator><creator>ZHENG DONG</creator><creator>LIU HONGLIANG</creator><scope>EVB</scope></search><sort><creationdate>20201127</creationdate><title>Bracket for installing soil pressure meter in construction period of deep foundation pit and using method thereof</title><author>XU KUNZHEN ; SHEN MINGYI ; LU ANDIAN ; SHI WENGUANG ; ZHOU YIXIN ; SUN YUANHUI ; ZHENG DONG ; LIU HONGLIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111997104A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>XU KUNZHEN</creatorcontrib><creatorcontrib>SHEN MINGYI</creatorcontrib><creatorcontrib>LU ANDIAN</creatorcontrib><creatorcontrib>SHI WENGUANG</creatorcontrib><creatorcontrib>ZHOU YIXIN</creatorcontrib><creatorcontrib>SUN YUANHUI</creatorcontrib><creatorcontrib>ZHENG DONG</creatorcontrib><creatorcontrib>LIU HONGLIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XU KUNZHEN</au><au>SHEN MINGYI</au><au>LU ANDIAN</au><au>SHI WENGUANG</au><au>ZHOU YIXIN</au><au>SUN YUANHUI</au><au>ZHENG DONG</au><au>LIU HONGLIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Bracket for installing soil pressure meter in construction period of deep foundation pit and using method thereof</title><date>2020-11-27</date><risdate>2020</risdate><abstract>The invention discloses a bracket for installing a soil pressure meter in a construction period of a deep foundation pit. The bracket comprises threaded rods, winches, pushing rods and a secondary meter. One or more reinforcement cages are arranged, and one or more steel wire ropes are disposed. The upper ends of the steel wire ropes are fixed to the tops of the reinforcement cages; one ends of the threaded rods are welded to steel bars in the reinforcement cages, the other ends of the threaded rods penetrate through the winches and are sleeved with the pushing rods, and the axis of each threaded rod is perpendicular to the side face of a soil retaining side; each winch comprises a winch wheel, a winch steel pipe and a winch steel wire shaft; the steel wire ropes are wound on the peripheries of the winch wheels, and the winch steel pipes are connected with the threaded rods through threads; one end of each pushing rod is connected with the corresponding winch steel pipe, and the otherend of each pushing rod a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111997104A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Bracket for installing soil pressure meter in construction period of deep foundation pit and using method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T08%3A50%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XU%20KUNZHEN&rft.date=2020-11-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111997104A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true