Prefabricated concrete inspection well
The invention provides a prefabricated concrete inspection well. The prefabricated concrete inspection well comprises a base, a lower wellbore, a wellbore adjusting section, a well circle seat and a well cover plate which are sequentially arranged from bottom to top, wherein a well cavity communicat...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CAI YIXIAN ZHANG SHUCHAO ZHUANG BIN WENG YULIN LI XIAOFENG HE ERYUE CHEN SU |
description | The invention provides a prefabricated concrete inspection well. The prefabricated concrete inspection well comprises a base, a lower wellbore, a wellbore adjusting section, a well circle seat and a well cover plate which are sequentially arranged from bottom to top, wherein a well cavity communicating with the lower wellbore and the wellbore adjusting section is formed in the lower wellbore and the wellbore adjusting section; and an upper opening communicating with the well cavity is formed in the well circle seat, an anti-collapse piece is further arranged on the upper side of the well circle seat, embedded pipes are arranged in the inner wall of the lower wellbore and the inner wall of the wellbore adjusting section in an embedded mode, and a pulley assembly is arranged in the upper opening of the well circle seat. According to the prefabricated concrete inspection well, the problems that a roadbed around the well cover plate of the inspection well is extremely prone to sink and collapse, and heavy objects |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111945782A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111945782A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111945782A3</originalsourceid><addsrcrecordid>eNrjZFALKEpNS0wqykxOLElNUUjOz0suSi1JVcjMKy5ITS7JzM9TKE_NyeFhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGhpYmpuYWRo7GxKgBAJMqJ-g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prefabricated concrete inspection well</title><source>esp@cenet</source><creator>CAI YIXIAN ; ZHANG SHUCHAO ; ZHUANG BIN ; WENG YULIN ; LI XIAOFENG ; HE ERYUE ; CHEN SU</creator><creatorcontrib>CAI YIXIAN ; ZHANG SHUCHAO ; ZHUANG BIN ; WENG YULIN ; LI XIAOFENG ; HE ERYUE ; CHEN SU</creatorcontrib><description>The invention provides a prefabricated concrete inspection well. The prefabricated concrete inspection well comprises a base, a lower wellbore, a wellbore adjusting section, a well circle seat and a well cover plate which are sequentially arranged from bottom to top, wherein a well cavity communicating with the lower wellbore and the wellbore adjusting section is formed in the lower wellbore and the wellbore adjusting section; and an upper opening communicating with the well cavity is formed in the well circle seat, an anti-collapse piece is further arranged on the upper side of the well circle seat, embedded pipes are arranged in the inner wall of the lower wellbore and the inner wall of the wellbore adjusting section in an embedded mode, and a pulley assembly is arranged in the upper opening of the well circle seat. According to the prefabricated concrete inspection well, the problems that a roadbed around the well cover plate of the inspection well is extremely prone to sink and collapse, and heavy objects</description><language>chi ; eng</language><subject>CAPSTANS ; CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HAULING ; HOISTING ; HOISTS ; HYDRAULIC ENGINEERING ; LIFTING ; PERFORMING OPERATIONS ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; TACKLES, e.g. PULLEY BLOCKS ; TRANSPORTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY ; WINCHES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201117&DB=EPODOC&CC=CN&NR=111945782A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201117&DB=EPODOC&CC=CN&NR=111945782A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CAI YIXIAN</creatorcontrib><creatorcontrib>ZHANG SHUCHAO</creatorcontrib><creatorcontrib>ZHUANG BIN</creatorcontrib><creatorcontrib>WENG YULIN</creatorcontrib><creatorcontrib>LI XIAOFENG</creatorcontrib><creatorcontrib>HE ERYUE</creatorcontrib><creatorcontrib>CHEN SU</creatorcontrib><title>Prefabricated concrete inspection well</title><description>The invention provides a prefabricated concrete inspection well. The prefabricated concrete inspection well comprises a base, a lower wellbore, a wellbore adjusting section, a well circle seat and a well cover plate which are sequentially arranged from bottom to top, wherein a well cavity communicating with the lower wellbore and the wellbore adjusting section is formed in the lower wellbore and the wellbore adjusting section; and an upper opening communicating with the well cavity is formed in the well circle seat, an anti-collapse piece is further arranged on the upper side of the well circle seat, embedded pipes are arranged in the inner wall of the lower wellbore and the inner wall of the wellbore adjusting section in an embedded mode, and a pulley assembly is arranged in the upper opening of the well circle seat. According to the prefabricated concrete inspection well, the problems that a roadbed around the well cover plate of the inspection well is extremely prone to sink and collapse, and heavy objects</description><subject>CAPSTANS</subject><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>HOISTS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LIFTING</subject><subject>PERFORMING OPERATIONS</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>TACKLES, e.g. PULLEY BLOCKS</subject><subject>TRANSPORTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><subject>WINCHES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFALKEpNS0wqykxOLElNUUjOz0suSi1JVcjMKy5ITS7JzM9TKE_NyeFhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGhpYmpuYWRo7GxKgBAJMqJ-g</recordid><startdate>20201117</startdate><enddate>20201117</enddate><creator>CAI YIXIAN</creator><creator>ZHANG SHUCHAO</creator><creator>ZHUANG BIN</creator><creator>WENG YULIN</creator><creator>LI XIAOFENG</creator><creator>HE ERYUE</creator><creator>CHEN SU</creator><scope>EVB</scope></search><sort><creationdate>20201117</creationdate><title>Prefabricated concrete inspection well</title><author>CAI YIXIAN ; ZHANG SHUCHAO ; ZHUANG BIN ; WENG YULIN ; LI XIAOFENG ; HE ERYUE ; CHEN SU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111945782A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>CAPSTANS</topic><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>HOISTS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LIFTING</topic><topic>PERFORMING OPERATIONS</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>TACKLES, e.g. PULLEY BLOCKS</topic><topic>TRANSPORTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><topic>WINCHES</topic><toplevel>online_resources</toplevel><creatorcontrib>CAI YIXIAN</creatorcontrib><creatorcontrib>ZHANG SHUCHAO</creatorcontrib><creatorcontrib>ZHUANG BIN</creatorcontrib><creatorcontrib>WENG YULIN</creatorcontrib><creatorcontrib>LI XIAOFENG</creatorcontrib><creatorcontrib>HE ERYUE</creatorcontrib><creatorcontrib>CHEN SU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CAI YIXIAN</au><au>ZHANG SHUCHAO</au><au>ZHUANG BIN</au><au>WENG YULIN</au><au>LI XIAOFENG</au><au>HE ERYUE</au><au>CHEN SU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prefabricated concrete inspection well</title><date>2020-11-17</date><risdate>2020</risdate><abstract>The invention provides a prefabricated concrete inspection well. The prefabricated concrete inspection well comprises a base, a lower wellbore, a wellbore adjusting section, a well circle seat and a well cover plate which are sequentially arranged from bottom to top, wherein a well cavity communicating with the lower wellbore and the wellbore adjusting section is formed in the lower wellbore and the wellbore adjusting section; and an upper opening communicating with the well cavity is formed in the well circle seat, an anti-collapse piece is further arranged on the upper side of the well circle seat, embedded pipes are arranged in the inner wall of the lower wellbore and the inner wall of the wellbore adjusting section in an embedded mode, and a pulley assembly is arranged in the upper opening of the well circle seat. According to the prefabricated concrete inspection well, the problems that a roadbed around the well cover plate of the inspection well is extremely prone to sink and collapse, and heavy objects</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111945782A |
source | esp@cenet |
subjects | CAPSTANS CESSPOOLS EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HAULING HOISTING HOISTS HYDRAULIC ENGINEERING LIFTING PERFORMING OPERATIONS SEWERAGE SEWERS SOIL SHIFTING TACKLES, e.g. PULLEY BLOCKS TRANSPORTING UNDERGROUND OR UNDERWATER STRUCTURES WATER SUPPLY WINCHES |
title | Prefabricated concrete inspection well |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T18%3A12%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CAI%20YIXIAN&rft.date=2020-11-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111945782A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |