Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile
The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WEI GANGRONG WANG MINHUA CHEN YU ZHUO XIAOLI LI MING QIN YAOLIU RONG XIANYI |
description | The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111877316A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111877316A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111877316A3</originalsourceid><addsrcrecordid>eNqNik0KwjAUhLtxIeodngdwEQrWrRTFlbhwX5J20gZefkgeQm8vLR7Azcw3H7OtzMsxyESR6InxAbswkg4DWccrF8kIo0xkY_aL8JApDsuklGG1ya7XgoF0KfCGZ5I5gZJbg7GvNlZzweHXu-p4v73bxwkpdihJ9wiQrn0qpS5NU6vztf7n8wV9yj5r</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><source>esp@cenet</source><creator>WEI GANGRONG ; WANG MINHUA ; CHEN YU ; ZHUO XIAOLI ; LI MING ; QIN YAOLIU ; RONG XIANYI</creator><creatorcontrib>WEI GANGRONG ; WANG MINHUA ; CHEN YU ; ZHUO XIAOLI ; LI MING ; QIN YAOLIU ; RONG XIANYI</creatorcontrib><description>The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; OR VIADUCTS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201103&DB=EPODOC&CC=CN&NR=111877316A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201103&DB=EPODOC&CC=CN&NR=111877316A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WEI GANGRONG</creatorcontrib><creatorcontrib>WANG MINHUA</creatorcontrib><creatorcontrib>CHEN YU</creatorcontrib><creatorcontrib>ZHUO XIAOLI</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIN YAOLIU</creatorcontrib><creatorcontrib>RONG XIANYI</creatorcontrib><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><description>The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>OR VIADUCTS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNik0KwjAUhLtxIeodngdwEQrWrRTFlbhwX5J20gZefkgeQm8vLR7Azcw3H7OtzMsxyESR6InxAbswkg4DWccrF8kIo0xkY_aL8JApDsuklGG1ya7XgoF0KfCGZ5I5gZJbg7GvNlZzweHXu-p4v73bxwkpdihJ9wiQrn0qpS5NU6vztf7n8wV9yj5r</recordid><startdate>20201103</startdate><enddate>20201103</enddate><creator>WEI GANGRONG</creator><creator>WANG MINHUA</creator><creator>CHEN YU</creator><creator>ZHUO XIAOLI</creator><creator>LI MING</creator><creator>QIN YAOLIU</creator><creator>RONG XIANYI</creator><scope>EVB</scope></search><sort><creationdate>20201103</creationdate><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><author>WEI GANGRONG ; WANG MINHUA ; CHEN YU ; ZHUO XIAOLI ; LI MING ; QIN YAOLIU ; RONG XIANYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111877316A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>OR VIADUCTS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WEI GANGRONG</creatorcontrib><creatorcontrib>WANG MINHUA</creatorcontrib><creatorcontrib>CHEN YU</creatorcontrib><creatorcontrib>ZHUO XIAOLI</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIN YAOLIU</creatorcontrib><creatorcontrib>RONG XIANYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WEI GANGRONG</au><au>WANG MINHUA</au><au>CHEN YU</au><au>ZHUO XIAOLI</au><au>LI MING</au><au>QIN YAOLIU</au><au>RONG XIANYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><date>2020-11-03</date><risdate>2020</risdate><abstract>The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111877316A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING OR VIADUCTS SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T05%3A26%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WEI%20GANGRONG&rft.date=2020-11-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111877316A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |