Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile

The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WEI GANGRONG, WANG MINHUA, CHEN YU, ZHUO XIAOLI, LI MING, QIN YAOLIU, RONG XIANYI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WEI GANGRONG
WANG MINHUA
CHEN YU
ZHUO XIAOLI
LI MING
QIN YAOLIU
RONG XIANYI
description The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111877316A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111877316A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111877316A3</originalsourceid><addsrcrecordid>eNqNik0KwjAUhLtxIeodngdwEQrWrRTFlbhwX5J20gZefkgeQm8vLR7Azcw3H7OtzMsxyESR6InxAbswkg4DWccrF8kIo0xkY_aL8JApDsuklGG1ya7XgoF0KfCGZ5I5gZJbg7GvNlZzweHXu-p4v73bxwkpdihJ9wiQrn0qpS5NU6vztf7n8wV9yj5r</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><source>esp@cenet</source><creator>WEI GANGRONG ; WANG MINHUA ; CHEN YU ; ZHUO XIAOLI ; LI MING ; QIN YAOLIU ; RONG XIANYI</creator><creatorcontrib>WEI GANGRONG ; WANG MINHUA ; CHEN YU ; ZHUO XIAOLI ; LI MING ; QIN YAOLIU ; RONG XIANYI</creatorcontrib><description>The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; OR VIADUCTS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201103&amp;DB=EPODOC&amp;CC=CN&amp;NR=111877316A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201103&amp;DB=EPODOC&amp;CC=CN&amp;NR=111877316A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WEI GANGRONG</creatorcontrib><creatorcontrib>WANG MINHUA</creatorcontrib><creatorcontrib>CHEN YU</creatorcontrib><creatorcontrib>ZHUO XIAOLI</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIN YAOLIU</creatorcontrib><creatorcontrib>RONG XIANYI</creatorcontrib><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><description>The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>OR VIADUCTS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNik0KwjAUhLtxIeodngdwEQrWrRTFlbhwX5J20gZefkgeQm8vLR7Azcw3H7OtzMsxyESR6InxAbswkg4DWccrF8kIo0xkY_aL8JApDsuklGG1ya7XgoF0KfCGZ5I5gZJbg7GvNlZzweHXu-p4v73bxwkpdihJ9wiQrn0qpS5NU6vztf7n8wV9yj5r</recordid><startdate>20201103</startdate><enddate>20201103</enddate><creator>WEI GANGRONG</creator><creator>WANG MINHUA</creator><creator>CHEN YU</creator><creator>ZHUO XIAOLI</creator><creator>LI MING</creator><creator>QIN YAOLIU</creator><creator>RONG XIANYI</creator><scope>EVB</scope></search><sort><creationdate>20201103</creationdate><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><author>WEI GANGRONG ; WANG MINHUA ; CHEN YU ; ZHUO XIAOLI ; LI MING ; QIN YAOLIU ; RONG XIANYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111877316A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>OR VIADUCTS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WEI GANGRONG</creatorcontrib><creatorcontrib>WANG MINHUA</creatorcontrib><creatorcontrib>CHEN YU</creatorcontrib><creatorcontrib>ZHUO XIAOLI</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIN YAOLIU</creatorcontrib><creatorcontrib>RONG XIANYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WEI GANGRONG</au><au>WANG MINHUA</au><au>CHEN YU</au><au>ZHUO XIAOLI</au><au>LI MING</au><au>QIN YAOLIU</au><au>RONG XIANYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile</title><date>2020-11-03</date><risdate>2020</risdate><abstract>The invention provides a pile bottom leveling and filling strength forming method for a prefabricated assembly type pipe pile. The pile bottom leveling and filling strength forming method comprises the following steps of (1) assembling a prefabricated tubular pile on site, lowering the prefabricated tubular pile to a certain distance away from the bottom of a hole, and temporarily fixing the prefabricated tubular pile through a hoop; (2) cleaning sediments at the bottom of the hole through slurry circulation; (3) after cleaning is completed, blending cement-mixed soil, and continuing to perform reverse circulation through the cement-mixed soil; (4) pouring underwater concrete; (5) loosening the hoop is, and grouting the pipe pile in place; (6) finely adjusting the verticality of the pipe pile; (7) performing maintaining. By means of the method, the pile bottom of the prefabricated pipe pile of a fabricated bridge can be horizontal, and besides, pile bottom strength and pile periphery strength meet the require</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111877316A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
OR VIADUCTS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pile bottom leveling and filling strength forming method for prefabricated assembly type pipe pile
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T05%3A26%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WEI%20GANGRONG&rft.date=2020-11-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111877316A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true