10kv on-load switch drainage wire replacement supporting tool
The invention discloses a 10kV on-load switch drainage wire replacement supporting tool, which comprises two sets of supporting frames arranged in a mirror image mode, wherein the supporting frame comprises two supporting rods arranged in a mirror image mode and a first connecting rod connected with...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | JIA QILONG WANG JUE LUO YANGRUI FAN SHANG DENG CHENJIA ZHAO XIN WEI JIAN MA TAO ZHOU JIA PAN JINCHAO YANG GETONG LI WENZHENG ZHOU YIZHE WANG ZHE SONG GUOTAO YANG FENG |
description | The invention discloses a 10kV on-load switch drainage wire replacement supporting tool, which comprises two sets of supporting frames arranged in a mirror image mode, wherein the supporting frame comprises two supporting rods arranged in a mirror image mode and a first connecting rod connected with the top ends of the two supporting rods, the supporting rod is provided with a plurality of drainage wire locking assemblies, a lantern ring is arranged between the first connecting rods, the two sides of the lantern ring are connected with the first connecting rods through second connecting rods,and a plurality of third connecting rods are arranged between the supporting frames. By means of the method that the supporting rods are opened, and the drainage wire is installed on the supporting rods in a side-by-side mode, the safety of operators is greatly protected while the operation efficiency is improved.
一种10kV带负荷开关引流线更换支撑工具,包括两组镜像设置的支撑架,所述支撑架包括两个镜像设置的支撑杆和连接两个支撑杆顶端的连接杆一,所述支撑杆上设置多个引流线闭锁组件,所述连接杆一之间设置套环,所述套环两侧通过连接杆 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111864619A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111864619A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111864619A3</originalsourceid><addsrcrecordid>eNrjZLA1NMguU8jP083JT0xRKC7PLEnOUEgpSszMS0xPVSjPLEpVKEotyElMTs1NzStRKC4tKMgvKsnMS1coyc_P4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFQG15qSXxzn6GhoYWZiZmhpaOxsSoAQABlTAn</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>10kv on-load switch drainage wire replacement supporting tool</title><source>esp@cenet</source><creator>JIA QILONG ; WANG JUE ; LUO YANGRUI ; FAN SHANG ; DENG CHENJIA ; ZHAO XIN ; WEI JIAN ; MA TAO ; ZHOU JIA ; PAN JINCHAO ; YANG GETONG ; LI WENZHENG ; ZHOU YIZHE ; WANG ZHE ; SONG GUOTAO ; YANG FENG</creator><creatorcontrib>JIA QILONG ; WANG JUE ; LUO YANGRUI ; FAN SHANG ; DENG CHENJIA ; ZHAO XIN ; WEI JIAN ; MA TAO ; ZHOU JIA ; PAN JINCHAO ; YANG GETONG ; LI WENZHENG ; ZHOU YIZHE ; WANG ZHE ; SONG GUOTAO ; YANG FENG</creatorcontrib><description>The invention discloses a 10kV on-load switch drainage wire replacement supporting tool, which comprises two sets of supporting frames arranged in a mirror image mode, wherein the supporting frame comprises two supporting rods arranged in a mirror image mode and a first connecting rod connected with the top ends of the two supporting rods, the supporting rod is provided with a plurality of drainage wire locking assemblies, a lantern ring is arranged between the first connecting rods, the two sides of the lantern ring are connected with the first connecting rods through second connecting rods,and a plurality of third connecting rods are arranged between the supporting frames. By means of the method that the supporting rods are opened, and the drainage wire is installed on the supporting rods in a side-by-side mode, the safety of operators is greatly protected while the operation efficiency is improved.
一种10kV带负荷开关引流线更换支撑工具,包括两组镜像设置的支撑架,所述支撑架包括两个镜像设置的支撑杆和连接两个支撑杆顶端的连接杆一,所述支撑杆上设置多个引流线闭锁组件,所述连接杆一之间设置套环,所述套环两侧通过连接杆</description><language>chi ; eng</language><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201030&DB=EPODOC&CC=CN&NR=111864619A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201030&DB=EPODOC&CC=CN&NR=111864619A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIA QILONG</creatorcontrib><creatorcontrib>WANG JUE</creatorcontrib><creatorcontrib>LUO YANGRUI</creatorcontrib><creatorcontrib>FAN SHANG</creatorcontrib><creatorcontrib>DENG CHENJIA</creatorcontrib><creatorcontrib>ZHAO XIN</creatorcontrib><creatorcontrib>WEI JIAN</creatorcontrib><creatorcontrib>MA TAO</creatorcontrib><creatorcontrib>ZHOU JIA</creatorcontrib><creatorcontrib>PAN JINCHAO</creatorcontrib><creatorcontrib>YANG GETONG</creatorcontrib><creatorcontrib>LI WENZHENG</creatorcontrib><creatorcontrib>ZHOU YIZHE</creatorcontrib><creatorcontrib>WANG ZHE</creatorcontrib><creatorcontrib>SONG GUOTAO</creatorcontrib><creatorcontrib>YANG FENG</creatorcontrib><title>10kv on-load switch drainage wire replacement supporting tool</title><description>The invention discloses a 10kV on-load switch drainage wire replacement supporting tool, which comprises two sets of supporting frames arranged in a mirror image mode, wherein the supporting frame comprises two supporting rods arranged in a mirror image mode and a first connecting rod connected with the top ends of the two supporting rods, the supporting rod is provided with a plurality of drainage wire locking assemblies, a lantern ring is arranged between the first connecting rods, the two sides of the lantern ring are connected with the first connecting rods through second connecting rods,and a plurality of third connecting rods are arranged between the supporting frames. By means of the method that the supporting rods are opened, and the drainage wire is installed on the supporting rods in a side-by-side mode, the safety of operators is greatly protected while the operation efficiency is improved.
一种10kV带负荷开关引流线更换支撑工具,包括两组镜像设置的支撑架,所述支撑架包括两个镜像设置的支撑杆和连接两个支撑杆顶端的连接杆一,所述支撑杆上设置多个引流线闭锁组件,所述连接杆一之间设置套环,所述套环两侧通过连接杆</description><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLA1NMguU8jP083JT0xRKC7PLEnOUEgpSszMS0xPVSjPLEpVKEotyElMTs1NzStRKC4tKMgvKsnMS1coyc_P4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFQG15qSXxzn6GhoYWZiZmhpaOxsSoAQABlTAn</recordid><startdate>20201030</startdate><enddate>20201030</enddate><creator>JIA QILONG</creator><creator>WANG JUE</creator><creator>LUO YANGRUI</creator><creator>FAN SHANG</creator><creator>DENG CHENJIA</creator><creator>ZHAO XIN</creator><creator>WEI JIAN</creator><creator>MA TAO</creator><creator>ZHOU JIA</creator><creator>PAN JINCHAO</creator><creator>YANG GETONG</creator><creator>LI WENZHENG</creator><creator>ZHOU YIZHE</creator><creator>WANG ZHE</creator><creator>SONG GUOTAO</creator><creator>YANG FENG</creator><scope>EVB</scope></search><sort><creationdate>20201030</creationdate><title>10kv on-load switch drainage wire replacement supporting tool</title><author>JIA QILONG ; WANG JUE ; LUO YANGRUI ; FAN SHANG ; DENG CHENJIA ; ZHAO XIN ; WEI JIAN ; MA TAO ; ZHOU JIA ; PAN JINCHAO ; YANG GETONG ; LI WENZHENG ; ZHOU YIZHE ; WANG ZHE ; SONG GUOTAO ; YANG FENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111864619A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</topic><toplevel>online_resources</toplevel><creatorcontrib>JIA QILONG</creatorcontrib><creatorcontrib>WANG JUE</creatorcontrib><creatorcontrib>LUO YANGRUI</creatorcontrib><creatorcontrib>FAN SHANG</creatorcontrib><creatorcontrib>DENG CHENJIA</creatorcontrib><creatorcontrib>ZHAO XIN</creatorcontrib><creatorcontrib>WEI JIAN</creatorcontrib><creatorcontrib>MA TAO</creatorcontrib><creatorcontrib>ZHOU JIA</creatorcontrib><creatorcontrib>PAN JINCHAO</creatorcontrib><creatorcontrib>YANG GETONG</creatorcontrib><creatorcontrib>LI WENZHENG</creatorcontrib><creatorcontrib>ZHOU YIZHE</creatorcontrib><creatorcontrib>WANG ZHE</creatorcontrib><creatorcontrib>SONG GUOTAO</creatorcontrib><creatorcontrib>YANG FENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIA QILONG</au><au>WANG JUE</au><au>LUO YANGRUI</au><au>FAN SHANG</au><au>DENG CHENJIA</au><au>ZHAO XIN</au><au>WEI JIAN</au><au>MA TAO</au><au>ZHOU JIA</au><au>PAN JINCHAO</au><au>YANG GETONG</au><au>LI WENZHENG</au><au>ZHOU YIZHE</au><au>WANG ZHE</au><au>SONG GUOTAO</au><au>YANG FENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>10kv on-load switch drainage wire replacement supporting tool</title><date>2020-10-30</date><risdate>2020</risdate><abstract>The invention discloses a 10kV on-load switch drainage wire replacement supporting tool, which comprises two sets of supporting frames arranged in a mirror image mode, wherein the supporting frame comprises two supporting rods arranged in a mirror image mode and a first connecting rod connected with the top ends of the two supporting rods, the supporting rod is provided with a plurality of drainage wire locking assemblies, a lantern ring is arranged between the first connecting rods, the two sides of the lantern ring are connected with the first connecting rods through second connecting rods,and a plurality of third connecting rods are arranged between the supporting frames. By means of the method that the supporting rods are opened, and the drainage wire is installed on the supporting rods in a side-by-side mode, the safety of operators is greatly protected while the operation efficiency is improved.
一种10kV带负荷开关引流线更换支撑工具,包括两组镜像设置的支撑架,所述支撑架包括两个镜像设置的支撑杆和连接两个支撑杆顶端的连接杆一,所述支撑杆上设置多个引流线闭锁组件,所述连接杆一之间设置套环,所述套环两侧通过连接杆</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111864619A |
source | esp@cenet |
subjects | CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY GENERATION INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES |
title | 10kv on-load switch drainage wire replacement supporting tool |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T19%3A23%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIA%20QILONG&rft.date=2020-10-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111864619A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |