High-rigidity seepage-proofing combined cofferdam and construction method thereof

The invention discloses a high-rigidity seepage-proofing combined cofferdam and a construction method thereof. The manufactured cofferdam comprises two oppositely arranged steel plate piles, steel tierods for oppositely pulling the two steel plate piles, and sub-piles arranged on a foundation pit fo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG YI, ZHANG YING, YU DINGXIAN, HE JIANPING, DU YONGJIANG, ZHU CHUNSHENG, XU YONG, WANG BIN, DOU WEI'E
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHENG YI
ZHANG YING
YU DINGXIAN
HE JIANPING
DU YONGJIANG
ZHU CHUNSHENG
XU YONG
WANG BIN
DOU WEI'E
description The invention discloses a high-rigidity seepage-proofing combined cofferdam and a construction method thereof. The manufactured cofferdam comprises two oppositely arranged steel plate piles, steel tierods for oppositely pulling the two steel plate piles, and sub-piles arranged on a foundation pit for the steel plate piles. Bagged miscellaneous fill is stacked between the two steel plate piles andstacked to the pile tops of the steel plate piles; a clay-bound macadam pavement is laid on the bagged miscellaneous fill, cement chemical churning piles engaged with one another are arranged along the clay-bound macadam pavement close to the outer side of a foundation pit, and the cement chemical churning piles are used for being inserted into a foundation silty clay layer; and bagged miscellaneous fill is stacked at the tops of the chemical churning piles close to the outer side of the foundation pit as a sub-weir, and a geomembrane is laid on the water side of the sub-weir. The high-rigidity seepage-proofing combin
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111851540A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111851540A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111851540A3</originalsourceid><addsrcrecordid>eNqNisEKAiEYBvfSIap3sAcQklrouizFnoKg-2L6qT-kv6gdevsKeoBOMwOz7K4T-SALebLUXqICWXvIXJgdJS8Mxzsl2I84h2J1FDp9K9VWnqYRJxHRAlvRAgrYrbuF04-KzY-rbns-3cZJIvOMmrVBQpvHi1Lq2Kv-sBv2_zxvHgI4PQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High-rigidity seepage-proofing combined cofferdam and construction method thereof</title><source>esp@cenet</source><creator>CHENG YI ; ZHANG YING ; YU DINGXIAN ; HE JIANPING ; DU YONGJIANG ; ZHU CHUNSHENG ; XU YONG ; WANG BIN ; DOU WEI'E</creator><creatorcontrib>CHENG YI ; ZHANG YING ; YU DINGXIAN ; HE JIANPING ; DU YONGJIANG ; ZHU CHUNSHENG ; XU YONG ; WANG BIN ; DOU WEI'E</creatorcontrib><description>The invention discloses a high-rigidity seepage-proofing combined cofferdam and a construction method thereof. The manufactured cofferdam comprises two oppositely arranged steel plate piles, steel tierods for oppositely pulling the two steel plate piles, and sub-piles arranged on a foundation pit for the steel plate piles. Bagged miscellaneous fill is stacked between the two steel plate piles andstacked to the pile tops of the steel plate piles; a clay-bound macadam pavement is laid on the bagged miscellaneous fill, cement chemical churning piles engaged with one another are arranged along the clay-bound macadam pavement close to the outer side of a foundation pit, and the cement chemical churning piles are used for being inserted into a foundation silty clay layer; and bagged miscellaneous fill is stacked at the tops of the chemical churning piles close to the outer side of the foundation pit as a sub-weir, and a geomembrane is laid on the water side of the sub-weir. The high-rigidity seepage-proofing combin</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201030&amp;DB=EPODOC&amp;CC=CN&amp;NR=111851540A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201030&amp;DB=EPODOC&amp;CC=CN&amp;NR=111851540A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHENG YI</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>YU DINGXIAN</creatorcontrib><creatorcontrib>HE JIANPING</creatorcontrib><creatorcontrib>DU YONGJIANG</creatorcontrib><creatorcontrib>ZHU CHUNSHENG</creatorcontrib><creatorcontrib>XU YONG</creatorcontrib><creatorcontrib>WANG BIN</creatorcontrib><creatorcontrib>DOU WEI'E</creatorcontrib><title>High-rigidity seepage-proofing combined cofferdam and construction method thereof</title><description>The invention discloses a high-rigidity seepage-proofing combined cofferdam and a construction method thereof. The manufactured cofferdam comprises two oppositely arranged steel plate piles, steel tierods for oppositely pulling the two steel plate piles, and sub-piles arranged on a foundation pit for the steel plate piles. Bagged miscellaneous fill is stacked between the two steel plate piles andstacked to the pile tops of the steel plate piles; a clay-bound macadam pavement is laid on the bagged miscellaneous fill, cement chemical churning piles engaged with one another are arranged along the clay-bound macadam pavement close to the outer side of a foundation pit, and the cement chemical churning piles are used for being inserted into a foundation silty clay layer; and bagged miscellaneous fill is stacked at the tops of the chemical churning piles close to the outer side of the foundation pit as a sub-weir, and a geomembrane is laid on the water side of the sub-weir. The high-rigidity seepage-proofing combin</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNisEKAiEYBvfSIap3sAcQklrouizFnoKg-2L6qT-kv6gdevsKeoBOMwOz7K4T-SALebLUXqICWXvIXJgdJS8Mxzsl2I84h2J1FDp9K9VWnqYRJxHRAlvRAgrYrbuF04-KzY-rbns-3cZJIvOMmrVBQpvHi1Lq2Kv-sBv2_zxvHgI4PQ</recordid><startdate>20201030</startdate><enddate>20201030</enddate><creator>CHENG YI</creator><creator>ZHANG YING</creator><creator>YU DINGXIAN</creator><creator>HE JIANPING</creator><creator>DU YONGJIANG</creator><creator>ZHU CHUNSHENG</creator><creator>XU YONG</creator><creator>WANG BIN</creator><creator>DOU WEI'E</creator><scope>EVB</scope></search><sort><creationdate>20201030</creationdate><title>High-rigidity seepage-proofing combined cofferdam and construction method thereof</title><author>CHENG YI ; ZHANG YING ; YU DINGXIAN ; HE JIANPING ; DU YONGJIANG ; ZHU CHUNSHENG ; XU YONG ; WANG BIN ; DOU WEI'E</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111851540A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHENG YI</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>YU DINGXIAN</creatorcontrib><creatorcontrib>HE JIANPING</creatorcontrib><creatorcontrib>DU YONGJIANG</creatorcontrib><creatorcontrib>ZHU CHUNSHENG</creatorcontrib><creatorcontrib>XU YONG</creatorcontrib><creatorcontrib>WANG BIN</creatorcontrib><creatorcontrib>DOU WEI'E</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHENG YI</au><au>ZHANG YING</au><au>YU DINGXIAN</au><au>HE JIANPING</au><au>DU YONGJIANG</au><au>ZHU CHUNSHENG</au><au>XU YONG</au><au>WANG BIN</au><au>DOU WEI'E</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High-rigidity seepage-proofing combined cofferdam and construction method thereof</title><date>2020-10-30</date><risdate>2020</risdate><abstract>The invention discloses a high-rigidity seepage-proofing combined cofferdam and a construction method thereof. The manufactured cofferdam comprises two oppositely arranged steel plate piles, steel tierods for oppositely pulling the two steel plate piles, and sub-piles arranged on a foundation pit for the steel plate piles. Bagged miscellaneous fill is stacked between the two steel plate piles andstacked to the pile tops of the steel plate piles; a clay-bound macadam pavement is laid on the bagged miscellaneous fill, cement chemical churning piles engaged with one another are arranged along the clay-bound macadam pavement close to the outer side of a foundation pit, and the cement chemical churning piles are used for being inserted into a foundation silty clay layer; and bagged miscellaneous fill is stacked at the tops of the chemical churning piles close to the outer side of the foundation pit as a sub-weir, and a geomembrane is laid on the water side of the sub-weir. The high-rigidity seepage-proofing combin</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111851540A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title High-rigidity seepage-proofing combined cofferdam and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T11%3A56%3A23IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHENG%20YI&rft.date=2020-10-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111851540A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true