Construction project real-time management system with high management efficiency
The invention relates to the technical field of building construction, and discloses a construction project real-time management system with high management efficiency, which comprises a control unit,and is characterized in that the control unit is respectively connected with an equipment verificati...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | JIN KEQIN |
description | The invention relates to the technical field of building construction, and discloses a construction project real-time management system with high management efficiency, which comprises a control unit,and is characterized in that the control unit is respectively connected with an equipment verification unit, an equipment unit, a storage unit, a user unit, a login unit, an encryption unit, a levelauthentication unit and a data transmission unit through wires; the control unit is specifically used for storing and processing information data; and the equipment verification unit is specifically used for verifying equipment logging in the real-time management system, and a mobile phone and an IP address which are not registered in the real-time management system cannot enter the real-time management system. According to the construction project real-time management system with the high management efficiency, the problems that at present, project materials are stored through paper files, sothat the project materials |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111680976A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111680976A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111680976A3</originalsourceid><addsrcrecordid>eNrjZAhwzs8rLikqTS7JzM9TKCjKz0pNLlEoSk3M0S3JzE1VyE3MS0xPzU3NK1EoriwuSc1VKM8syVDIyEzPQJZLTUvLTM5MzUuu5GFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoaGZhYGluZmjsbEqAEA_jQ4Fw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction project real-time management system with high management efficiency</title><source>esp@cenet</source><creator>JIN KEQIN</creator><creatorcontrib>JIN KEQIN</creatorcontrib><description>The invention relates to the technical field of building construction, and discloses a construction project real-time management system with high management efficiency, which comprises a control unit,and is characterized in that the control unit is respectively connected with an equipment verification unit, an equipment unit, a storage unit, a user unit, a login unit, an encryption unit, a levelauthentication unit and a data transmission unit through wires; the control unit is specifically used for storing and processing information data; and the equipment verification unit is specifically used for verifying equipment logging in the real-time management system, and a mobile phone and an IP address which are not registered in the real-time management system cannot enter the real-time management system. According to the construction project real-time management system with the high management efficiency, the problems that at present, project materials are stored through paper files, sothat the project materials</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200918&DB=EPODOC&CC=CN&NR=111680976A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200918&DB=EPODOC&CC=CN&NR=111680976A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIN KEQIN</creatorcontrib><title>Construction project real-time management system with high management efficiency</title><description>The invention relates to the technical field of building construction, and discloses a construction project real-time management system with high management efficiency, which comprises a control unit,and is characterized in that the control unit is respectively connected with an equipment verification unit, an equipment unit, a storage unit, a user unit, a login unit, an encryption unit, a levelauthentication unit and a data transmission unit through wires; the control unit is specifically used for storing and processing information data; and the equipment verification unit is specifically used for verifying equipment logging in the real-time management system, and a mobile phone and an IP address which are not registered in the real-time management system cannot enter the real-time management system. According to the construction project real-time management system with the high management efficiency, the problems that at present, project materials are stored through paper files, sothat the project materials</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAhwzs8rLikqTS7JzM9TKCjKz0pNLlEoSk3M0S3JzE1VyE3MS0xPzU3NK1EoriwuSc1VKM8syVDIyEzPQJZLTUvLTM5MzUuu5GFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoaGZhYGluZmjsbEqAEA_jQ4Fw</recordid><startdate>20200918</startdate><enddate>20200918</enddate><creator>JIN KEQIN</creator><scope>EVB</scope></search><sort><creationdate>20200918</creationdate><title>Construction project real-time management system with high management efficiency</title><author>JIN KEQIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111680976A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>JIN KEQIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIN KEQIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction project real-time management system with high management efficiency</title><date>2020-09-18</date><risdate>2020</risdate><abstract>The invention relates to the technical field of building construction, and discloses a construction project real-time management system with high management efficiency, which comprises a control unit,and is characterized in that the control unit is respectively connected with an equipment verification unit, an equipment unit, a storage unit, a user unit, a login unit, an encryption unit, a levelauthentication unit and a data transmission unit through wires; the control unit is specifically used for storing and processing information data; and the equipment verification unit is specifically used for verifying equipment logging in the real-time management system, and a mobile phone and an IP address which are not registered in the real-time management system cannot enter the real-time management system. According to the construction project real-time management system with the high management efficiency, the problems that at present, project materials are stored through paper files, sothat the project materials</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111680976A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Construction project real-time management system with high management efficiency |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T05%3A03%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIN%20KEQIN&rft.date=2020-09-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111680976A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |