Method for establishing informatization management platform of power system project review whole process

The invention relates to an establishment method of an informatization management platform for the whole project review process of a power system. The establishment method comprises the following steps: (1) parameter integration: integrating and unifying operation parameters of power transmission an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SANG JIANHU, WANG JIAN, XU JING, MALAI DUISHANBAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to an establishment method of an informatization management platform for the whole project review process of a power system. The establishment method comprises the following steps: (1) parameter integration: integrating and unifying operation parameters of power transmission and transformation projects of 35kV, 110kV and 220kV scales or below; (2) parameter archiving: uniformly collecting, archiving and managing the design data and review result data of the power transmission and transformation projects with the scales of 35kV, 110kV and 220kV or below in research and initial setting stages; (3) parameter transfer; (4) parameter primary auditing: completing internal auditing of research and primary setting of a 220kV-scale and above 500kV power transmission and transformation project; and (5) creating a local area network: constructing an on-site review tool. By adopting the method provided by the invention, the working efficiency can be improved, so that the method can be widely applied