Method for dividing open type TBM construction data tunneling cycle
The invention relates to a method for dividing an open type TBM construction data tunneling cycle. The method comprises the following steps that A1, for each TBM tunneling cycle, parameter data of theTBM tunneling cycle are acquired after the TBM tunneling cycle; A2, based on the parameter data of t...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | BAI WENCHAO SHEN WANQING LIU ZAOBAO LI LONG CAI LICONG SHAO JIANFU |
description | The invention relates to a method for dividing an open type TBM construction data tunneling cycle. The method comprises the following steps that A1, for each TBM tunneling cycle, parameter data of theTBM tunneling cycle are acquired after the TBM tunneling cycle; A2, based on the parameter data of the TBM tunneling cycle, division processing is performed on the TBM tunneling cycle, and a rising segment in the TBM tunneling cycle is determined; A3, the parameter data corresponding to the rising segment in the TBM tunneling cycle are acquired based on the rising segment in the TBM tunneling cycle and the parameter data of the TBM tunneling cycle; and A4, geological parameters in the TBM tunneling cycle are predicted by adopting a preset prediction algorithm according to the parameter data corresponding to the rising segment in the TBM tunneling cycle, and a prediction result is obtained. According to the method, the performance parameters of cutter disc torque equipment and two equipment control parameters such |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111594198A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111594198A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111594198A3</originalsourceid><addsrcrecordid>eNrjZHD2TS3JyE9RSMsvUkjJLMtMycxLV8gvSM1TKKksSFUIcfJVSM7PKy4pKk0uyczPU0hJLElUKCnNy0vNAalMrkzOSeVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGhqaWJoaWFo7GxKgBAF6jMk4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for dividing open type TBM construction data tunneling cycle</title><source>esp@cenet</source><creator>BAI WENCHAO ; SHEN WANQING ; LIU ZAOBAO ; LI LONG ; CAI LICONG ; SHAO JIANFU</creator><creatorcontrib>BAI WENCHAO ; SHEN WANQING ; LIU ZAOBAO ; LI LONG ; CAI LICONG ; SHAO JIANFU</creatorcontrib><description>The invention relates to a method for dividing an open type TBM construction data tunneling cycle. The method comprises the following steps that A1, for each TBM tunneling cycle, parameter data of theTBM tunneling cycle are acquired after the TBM tunneling cycle; A2, based on the parameter data of the TBM tunneling cycle, division processing is performed on the TBM tunneling cycle, and a rising segment in the TBM tunneling cycle is determined; A3, the parameter data corresponding to the rising segment in the TBM tunneling cycle are acquired based on the rising segment in the TBM tunneling cycle and the parameter data of the TBM tunneling cycle; and A4, geological parameters in the TBM tunneling cycle are predicted by adopting a preset prediction algorithm according to the parameter data corresponding to the rising segment in the TBM tunneling cycle, and a prediction result is obtained. According to the method, the performance parameters of cutter disc torque equipment and two equipment control parameters such</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200828&DB=EPODOC&CC=CN&NR=111594198A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200828&DB=EPODOC&CC=CN&NR=111594198A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BAI WENCHAO</creatorcontrib><creatorcontrib>SHEN WANQING</creatorcontrib><creatorcontrib>LIU ZAOBAO</creatorcontrib><creatorcontrib>LI LONG</creatorcontrib><creatorcontrib>CAI LICONG</creatorcontrib><creatorcontrib>SHAO JIANFU</creatorcontrib><title>Method for dividing open type TBM construction data tunneling cycle</title><description>The invention relates to a method for dividing an open type TBM construction data tunneling cycle. The method comprises the following steps that A1, for each TBM tunneling cycle, parameter data of theTBM tunneling cycle are acquired after the TBM tunneling cycle; A2, based on the parameter data of the TBM tunneling cycle, division processing is performed on the TBM tunneling cycle, and a rising segment in the TBM tunneling cycle is determined; A3, the parameter data corresponding to the rising segment in the TBM tunneling cycle are acquired based on the rising segment in the TBM tunneling cycle and the parameter data of the TBM tunneling cycle; and A4, geological parameters in the TBM tunneling cycle are predicted by adopting a preset prediction algorithm according to the parameter data corresponding to the rising segment in the TBM tunneling cycle, and a prediction result is obtained. According to the method, the performance parameters of cutter disc torque equipment and two equipment control parameters such</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHD2TS3JyE9RSMsvUkjJLMtMycxLV8gvSM1TKKksSFUIcfJVSM7PKy4pKk0uyczPU0hJLElUKCnNy0vNAalMrkzOSeVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGhqaWJoaWFo7GxKgBAF6jMk4</recordid><startdate>20200828</startdate><enddate>20200828</enddate><creator>BAI WENCHAO</creator><creator>SHEN WANQING</creator><creator>LIU ZAOBAO</creator><creator>LI LONG</creator><creator>CAI LICONG</creator><creator>SHAO JIANFU</creator><scope>EVB</scope></search><sort><creationdate>20200828</creationdate><title>Method for dividing open type TBM construction data tunneling cycle</title><author>BAI WENCHAO ; SHEN WANQING ; LIU ZAOBAO ; LI LONG ; CAI LICONG ; SHAO JIANFU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111594198A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>BAI WENCHAO</creatorcontrib><creatorcontrib>SHEN WANQING</creatorcontrib><creatorcontrib>LIU ZAOBAO</creatorcontrib><creatorcontrib>LI LONG</creatorcontrib><creatorcontrib>CAI LICONG</creatorcontrib><creatorcontrib>SHAO JIANFU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BAI WENCHAO</au><au>SHEN WANQING</au><au>LIU ZAOBAO</au><au>LI LONG</au><au>CAI LICONG</au><au>SHAO JIANFU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for dividing open type TBM construction data tunneling cycle</title><date>2020-08-28</date><risdate>2020</risdate><abstract>The invention relates to a method for dividing an open type TBM construction data tunneling cycle. The method comprises the following steps that A1, for each TBM tunneling cycle, parameter data of theTBM tunneling cycle are acquired after the TBM tunneling cycle; A2, based on the parameter data of the TBM tunneling cycle, division processing is performed on the TBM tunneling cycle, and a rising segment in the TBM tunneling cycle is determined; A3, the parameter data corresponding to the rising segment in the TBM tunneling cycle are acquired based on the rising segment in the TBM tunneling cycle and the parameter data of the TBM tunneling cycle; and A4, geological parameters in the TBM tunneling cycle are predicted by adopting a preset prediction algorithm according to the parameter data corresponding to the rising segment in the TBM tunneling cycle, and a prediction result is obtained. According to the method, the performance parameters of cutter disc torque equipment and two equipment control parameters such</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111594198A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS SHAFTS TUNNELS |
title | Method for dividing open type TBM construction data tunneling cycle |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T12%3A21%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BAI%20WENCHAO&rft.date=2020-08-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111594198A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |