Construction method using self-bearing structure as temporary support

The construction method using the self-bearing structure as the temporary support comprises the following steps that A, the size of a main beam is determined according to the overall cross beam heightand the cross beam wall thickness; b, a pouring support of the side wall of the main beam is built,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DONG BONING, LI CHUNSHENG, YU WEI, CAO ZHI, LIU HONGYU, FAN LINGFENG, MENG NING'AN, ZHANG SHIXIAN, YANG QIBIAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DONG BONING
LI CHUNSHENG
YU WEI
CAO ZHI
LIU HONGYU
FAN LINGFENG
MENG NING'AN
ZHANG SHIXIAN
YANG QIBIAO
description The construction method using the self-bearing structure as the temporary support comprises the following steps that A, the size of a main beam is determined according to the overall cross beam heightand the cross beam wall thickness; b, a pouring support of the side wall of the main beam is built, and pouring is conducted on the side wall of the main beam; c, prestress or temporary prestress isapplied in the pouring process of the side wall of the main beam; d, after the side wall of the main beam is completed, a pouring support of the side wall of the main beam is dismantled, and horizontal concrete formworks are erected and located at the top and the bottom of the side wall of the main beam; compared with the prior art, the pouring section size of the main beam is changed; and on theother hand, a structure with high bearing capacity is formed by utilizing the structure of the cross beam and tensioning prestress so as to solve the problem of subsequent concrete pouring, so that the material consumption of t
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111335166A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111335166A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111335166A3</originalsourceid><addsrcrecordid>eNrjZHB1zs8rLikqTS7JzM9TyE0tychPUSgtzsxLVyhOzUnTTUpNLAJzwGpKi1IVEosVSlJzC_KLEosqFYpLC4CsEh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoaGxsamhm5mhMjBoAac00KA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method using self-bearing structure as temporary support</title><source>esp@cenet</source><creator>DONG BONING ; LI CHUNSHENG ; YU WEI ; CAO ZHI ; LIU HONGYU ; FAN LINGFENG ; MENG NING'AN ; ZHANG SHIXIAN ; YANG QIBIAO</creator><creatorcontrib>DONG BONING ; LI CHUNSHENG ; YU WEI ; CAO ZHI ; LIU HONGYU ; FAN LINGFENG ; MENG NING'AN ; ZHANG SHIXIAN ; YANG QIBIAO</creatorcontrib><description>The construction method using the self-bearing structure as the temporary support comprises the following steps that A, the size of a main beam is determined according to the overall cross beam heightand the cross beam wall thickness; b, a pouring support of the side wall of the main beam is built, and pouring is conducted on the side wall of the main beam; c, prestress or temporary prestress isapplied in the pouring process of the side wall of the main beam; d, after the side wall of the main beam is completed, a pouring support of the side wall of the main beam is dismantled, and horizontal concrete formworks are erected and located at the top and the bottom of the side wall of the main beam; compared with the prior art, the pouring section size of the main beam is changed; and on theother hand, a structure with high bearing capacity is formed by utilizing the structure of the cross beam and tensioning prestress so as to solve the problem of subsequent concrete pouring, so that the material consumption of t</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200626&amp;DB=EPODOC&amp;CC=CN&amp;NR=111335166A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200626&amp;DB=EPODOC&amp;CC=CN&amp;NR=111335166A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DONG BONING</creatorcontrib><creatorcontrib>LI CHUNSHENG</creatorcontrib><creatorcontrib>YU WEI</creatorcontrib><creatorcontrib>CAO ZHI</creatorcontrib><creatorcontrib>LIU HONGYU</creatorcontrib><creatorcontrib>FAN LINGFENG</creatorcontrib><creatorcontrib>MENG NING'AN</creatorcontrib><creatorcontrib>ZHANG SHIXIAN</creatorcontrib><creatorcontrib>YANG QIBIAO</creatorcontrib><title>Construction method using self-bearing structure as temporary support</title><description>The construction method using the self-bearing structure as the temporary support comprises the following steps that A, the size of a main beam is determined according to the overall cross beam heightand the cross beam wall thickness; b, a pouring support of the side wall of the main beam is built, and pouring is conducted on the side wall of the main beam; c, prestress or temporary prestress isapplied in the pouring process of the side wall of the main beam; d, after the side wall of the main beam is completed, a pouring support of the side wall of the main beam is dismantled, and horizontal concrete formworks are erected and located at the top and the bottom of the side wall of the main beam; compared with the prior art, the pouring section size of the main beam is changed; and on theother hand, a structure with high bearing capacity is formed by utilizing the structure of the cross beam and tensioning prestress so as to solve the problem of subsequent concrete pouring, so that the material consumption of t</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB1zs8rLikqTS7JzM9TyE0tychPUSgtzsxLVyhOzUnTTUpNLAJzwGpKi1IVEosVSlJzC_KLEosqFYpLC4CsEh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoaGxsamhm5mhMjBoAac00KA</recordid><startdate>20200626</startdate><enddate>20200626</enddate><creator>DONG BONING</creator><creator>LI CHUNSHENG</creator><creator>YU WEI</creator><creator>CAO ZHI</creator><creator>LIU HONGYU</creator><creator>FAN LINGFENG</creator><creator>MENG NING'AN</creator><creator>ZHANG SHIXIAN</creator><creator>YANG QIBIAO</creator><scope>EVB</scope></search><sort><creationdate>20200626</creationdate><title>Construction method using self-bearing structure as temporary support</title><author>DONG BONING ; LI CHUNSHENG ; YU WEI ; CAO ZHI ; LIU HONGYU ; FAN LINGFENG ; MENG NING'AN ; ZHANG SHIXIAN ; YANG QIBIAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111335166A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>DONG BONING</creatorcontrib><creatorcontrib>LI CHUNSHENG</creatorcontrib><creatorcontrib>YU WEI</creatorcontrib><creatorcontrib>CAO ZHI</creatorcontrib><creatorcontrib>LIU HONGYU</creatorcontrib><creatorcontrib>FAN LINGFENG</creatorcontrib><creatorcontrib>MENG NING'AN</creatorcontrib><creatorcontrib>ZHANG SHIXIAN</creatorcontrib><creatorcontrib>YANG QIBIAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DONG BONING</au><au>LI CHUNSHENG</au><au>YU WEI</au><au>CAO ZHI</au><au>LIU HONGYU</au><au>FAN LINGFENG</au><au>MENG NING'AN</au><au>ZHANG SHIXIAN</au><au>YANG QIBIAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method using self-bearing structure as temporary support</title><date>2020-06-26</date><risdate>2020</risdate><abstract>The construction method using the self-bearing structure as the temporary support comprises the following steps that A, the size of a main beam is determined according to the overall cross beam heightand the cross beam wall thickness; b, a pouring support of the side wall of the main beam is built, and pouring is conducted on the side wall of the main beam; c, prestress or temporary prestress isapplied in the pouring process of the side wall of the main beam; d, after the side wall of the main beam is completed, a pouring support of the side wall of the main beam is dismantled, and horizontal concrete formworks are erected and located at the top and the bottom of the side wall of the main beam; compared with the prior art, the pouring section size of the main beam is changed; and on theother hand, a structure with high bearing capacity is formed by utilizing the structure of the cross beam and tensioning prestress so as to solve the problem of subsequent concrete pouring, so that the material consumption of t</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111335166A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Construction method using self-bearing structure as temporary support
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T23%3A59%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DONG%20BONING&rft.date=2020-06-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111335166A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true