Construction method for excavation of foundation pit

The invention discloses a construction method for excavation of a foundation pit, and relates to the field of architectural engineering. A specific implementation mode of the method comprises the steps of dividing a foundation pit excavation project into multiple standard segments, and simultaneousl...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN JIE, YUAN XINGSHEN, FU JUN, WU CHUANBO, CAI XIAOYING, XU YING'ER, ZHAO YUFU, BAO LIANFAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN JIE
YUAN XINGSHEN
FU JUN
WU CHUANBO
CAI XIAOYING
XU YING'ER
ZHAO YUFU
BAO LIANFAN
description The invention discloses a construction method for excavation of a foundation pit, and relates to the field of architectural engineering. A specific implementation mode of the method comprises the steps of dividing a foundation pit excavation project into multiple standard segments, and simultaneously excavating the standard segments from the two ends according to the excavation sequence from the two ends to the middle; in each standard segment excavation process, according to the excavation depth, excavating each standard segment in layers from top to bottom according to the following steps ofsymmetrically excavating the first layer of earthwork through excavators arranged on the two sides of the foundation pit, and meanwhile, arranging a foundation pit support; after determining that theexcavation of the first layer of earthwork is finished, through the excavators arranged on two sides of the foundation pit, excavating the second layer of earthwork from the middle to the two sides,and meanwhile, arranging a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111305218A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111305218A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111305218A3</originalsourceid><addsrcrecordid>eNrjZDBxzs8rLikqTS7JzM9TyE0tychPUUjLL1JIrUhOLEsEi-anAUVK81IgvILMEh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoaGxgamRo4WhMjBoAZuctJQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for excavation of foundation pit</title><source>esp@cenet</source><creator>CHEN JIE ; YUAN XINGSHEN ; FU JUN ; WU CHUANBO ; CAI XIAOYING ; XU YING'ER ; ZHAO YUFU ; BAO LIANFAN</creator><creatorcontrib>CHEN JIE ; YUAN XINGSHEN ; FU JUN ; WU CHUANBO ; CAI XIAOYING ; XU YING'ER ; ZHAO YUFU ; BAO LIANFAN</creatorcontrib><description>The invention discloses a construction method for excavation of a foundation pit, and relates to the field of architectural engineering. A specific implementation mode of the method comprises the steps of dividing a foundation pit excavation project into multiple standard segments, and simultaneously excavating the standard segments from the two ends according to the excavation sequence from the two ends to the middle; in each standard segment excavation process, according to the excavation depth, excavating each standard segment in layers from top to bottom according to the following steps ofsymmetrically excavating the first layer of earthwork through excavators arranged on the two sides of the foundation pit, and meanwhile, arranging a foundation pit support; after determining that theexcavation of the first layer of earthwork is finished, through the excavators arranged on two sides of the foundation pit, excavating the second layer of earthwork from the middle to the two sides,and meanwhile, arranging a</description><language>chi ; eng</language><subject>DREDGING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200619&amp;DB=EPODOC&amp;CC=CN&amp;NR=111305218A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200619&amp;DB=EPODOC&amp;CC=CN&amp;NR=111305218A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN JIE</creatorcontrib><creatorcontrib>YUAN XINGSHEN</creatorcontrib><creatorcontrib>FU JUN</creatorcontrib><creatorcontrib>WU CHUANBO</creatorcontrib><creatorcontrib>CAI XIAOYING</creatorcontrib><creatorcontrib>XU YING'ER</creatorcontrib><creatorcontrib>ZHAO YUFU</creatorcontrib><creatorcontrib>BAO LIANFAN</creatorcontrib><title>Construction method for excavation of foundation pit</title><description>The invention discloses a construction method for excavation of a foundation pit, and relates to the field of architectural engineering. A specific implementation mode of the method comprises the steps of dividing a foundation pit excavation project into multiple standard segments, and simultaneously excavating the standard segments from the two ends according to the excavation sequence from the two ends to the middle; in each standard segment excavation process, according to the excavation depth, excavating each standard segment in layers from top to bottom according to the following steps ofsymmetrically excavating the first layer of earthwork through excavators arranged on the two sides of the foundation pit, and meanwhile, arranging a foundation pit support; after determining that theexcavation of the first layer of earthwork is finished, through the excavators arranged on two sides of the foundation pit, excavating the second layer of earthwork from the middle to the two sides,and meanwhile, arranging a</description><subject>DREDGING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBxzs8rLikqTS7JzM9TyE0tychPUUjLL1JIrUhOLEsEi-anAUVK81IgvILMEh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoaGxgamRo4WhMjBoAZuctJQ</recordid><startdate>20200619</startdate><enddate>20200619</enddate><creator>CHEN JIE</creator><creator>YUAN XINGSHEN</creator><creator>FU JUN</creator><creator>WU CHUANBO</creator><creator>CAI XIAOYING</creator><creator>XU YING'ER</creator><creator>ZHAO YUFU</creator><creator>BAO LIANFAN</creator><scope>EVB</scope></search><sort><creationdate>20200619</creationdate><title>Construction method for excavation of foundation pit</title><author>CHEN JIE ; YUAN XINGSHEN ; FU JUN ; WU CHUANBO ; CAI XIAOYING ; XU YING'ER ; ZHAO YUFU ; BAO LIANFAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111305218A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>DREDGING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN JIE</creatorcontrib><creatorcontrib>YUAN XINGSHEN</creatorcontrib><creatorcontrib>FU JUN</creatorcontrib><creatorcontrib>WU CHUANBO</creatorcontrib><creatorcontrib>CAI XIAOYING</creatorcontrib><creatorcontrib>XU YING'ER</creatorcontrib><creatorcontrib>ZHAO YUFU</creatorcontrib><creatorcontrib>BAO LIANFAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN JIE</au><au>YUAN XINGSHEN</au><au>FU JUN</au><au>WU CHUANBO</au><au>CAI XIAOYING</au><au>XU YING'ER</au><au>ZHAO YUFU</au><au>BAO LIANFAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for excavation of foundation pit</title><date>2020-06-19</date><risdate>2020</risdate><abstract>The invention discloses a construction method for excavation of a foundation pit, and relates to the field of architectural engineering. A specific implementation mode of the method comprises the steps of dividing a foundation pit excavation project into multiple standard segments, and simultaneously excavating the standard segments from the two ends according to the excavation sequence from the two ends to the middle; in each standard segment excavation process, according to the excavation depth, excavating each standard segment in layers from top to bottom according to the following steps ofsymmetrically excavating the first layer of earthwork through excavators arranged on the two sides of the foundation pit, and meanwhile, arranging a foundation pit support; after determining that theexcavation of the first layer of earthwork is finished, through the excavators arranged on two sides of the foundation pit, excavating the second layer of earthwork from the middle to the two sides,and meanwhile, arranging a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111305218A
source esp@cenet
subjects DREDGING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method for excavation of foundation pit
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-14T19%3A55%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20JIE&rft.date=2020-06-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111305218A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true