Differential settlement control pre-propping excavation construction method for deformation joint of underpass subway station

The invention discloses a differential settlement control pre-propping excavation construction method for a deformation joint of an underpass subway station. The differential settlement control pre-propping excavation construction method comprises the five steps of deformation joint reinforcement, p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CUI CHENQIU, GUO ZHENHU, XING QISHENG, ZHENG JINLEI, HE JIAXIN, JIA XIAOJIE, LIU BINGKE, GUO XUDONG, HE SHAOHUI, BAI SHOUXING, LI YIMING, WANG AIJUN, LIANG ZHICHAO, SHAO XIANGYU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CUI CHENQIU
GUO ZHENHU
XING QISHENG
ZHENG JINLEI
HE JIAXIN
JIA XIAOJIE
LIU BINGKE
GUO XUDONG
HE SHAOHUI
BAI SHOUXING
LI YIMING
WANG AIJUN
LIANG ZHICHAO
SHAO XIANGYU
description The invention discloses a differential settlement control pre-propping excavation construction method for a deformation joint of an underpass subway station. The differential settlement control pre-propping excavation construction method comprises the five steps of deformation joint reinforcement, pre-construction, pilot tunnel primary reinforcement, pilot tunnel secondary reinforcement and working face construction. According to the construction method, the basic principle of a shallow tunneling method is followed in construction, so that the stress state of a long-term operation subway station structure is effectively improved; stable supporting structures are formed on the two sides of the deformation joint, so that differential settlement of the two sides of the deformation joint of the station is controlled; and meanwhile, compared with a traditional construction technology, the construction technology is effectively simplified, construction difficulty and construction cost are reduced, and accordingly c
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111206944A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111206944A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111206944A3</originalsourceid><addsrcrecordid>eNqNjDsOwjAQRNNQIOAOywEiEYiQKFEAUVHRR8ZZg5HjtbxrPgV3JwQOQDOjp3maYfbaWGMwoherHDCKOGw7Ak1eIjkIEfMQKQTrz4APrW5KLPnPzhKT7qFFuVADhiI02GX7da5kuycykHyDMShm4HS6qyew9MY4GxjlGCe_HmXT3fZY7XMMVCMHpdGj1NWhKIr5bLkqy_XiH-cNd_tKGg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Differential settlement control pre-propping excavation construction method for deformation joint of underpass subway station</title><source>esp@cenet</source><creator>CUI CHENQIU ; GUO ZHENHU ; XING QISHENG ; ZHENG JINLEI ; HE JIAXIN ; JIA XIAOJIE ; LIU BINGKE ; GUO XUDONG ; HE SHAOHUI ; BAI SHOUXING ; LI YIMING ; WANG AIJUN ; LIANG ZHICHAO ; SHAO XIANGYU</creator><creatorcontrib>CUI CHENQIU ; GUO ZHENHU ; XING QISHENG ; ZHENG JINLEI ; HE JIAXIN ; JIA XIAOJIE ; LIU BINGKE ; GUO XUDONG ; HE SHAOHUI ; BAI SHOUXING ; LI YIMING ; WANG AIJUN ; LIANG ZHICHAO ; SHAO XIANGYU</creatorcontrib><description>The invention discloses a differential settlement control pre-propping excavation construction method for a deformation joint of an underpass subway station. The differential settlement control pre-propping excavation construction method comprises the five steps of deformation joint reinforcement, pre-construction, pilot tunnel primary reinforcement, pilot tunnel secondary reinforcement and working face construction. According to the construction method, the basic principle of a shallow tunneling method is followed in construction, so that the stress state of a long-term operation subway station structure is effectively improved; stable supporting structures are formed on the two sides of the deformation joint, so that differential settlement of the two sides of the deformation joint of the station is controlled; and meanwhile, compared with a traditional construction technology, the construction technology is effectively simplified, construction difficulty and construction cost are reduced, and accordingly c</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200529&amp;DB=EPODOC&amp;CC=CN&amp;NR=111206944A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200529&amp;DB=EPODOC&amp;CC=CN&amp;NR=111206944A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CUI CHENQIU</creatorcontrib><creatorcontrib>GUO ZHENHU</creatorcontrib><creatorcontrib>XING QISHENG</creatorcontrib><creatorcontrib>ZHENG JINLEI</creatorcontrib><creatorcontrib>HE JIAXIN</creatorcontrib><creatorcontrib>JIA XIAOJIE</creatorcontrib><creatorcontrib>LIU BINGKE</creatorcontrib><creatorcontrib>GUO XUDONG</creatorcontrib><creatorcontrib>HE SHAOHUI</creatorcontrib><creatorcontrib>BAI SHOUXING</creatorcontrib><creatorcontrib>LI YIMING</creatorcontrib><creatorcontrib>WANG AIJUN</creatorcontrib><creatorcontrib>LIANG ZHICHAO</creatorcontrib><creatorcontrib>SHAO XIANGYU</creatorcontrib><title>Differential settlement control pre-propping excavation construction method for deformation joint of underpass subway station</title><description>The invention discloses a differential settlement control pre-propping excavation construction method for a deformation joint of an underpass subway station. The differential settlement control pre-propping excavation construction method comprises the five steps of deformation joint reinforcement, pre-construction, pilot tunnel primary reinforcement, pilot tunnel secondary reinforcement and working face construction. According to the construction method, the basic principle of a shallow tunneling method is followed in construction, so that the stress state of a long-term operation subway station structure is effectively improved; stable supporting structures are formed on the two sides of the deformation joint, so that differential settlement of the two sides of the deformation joint of the station is controlled; and meanwhile, compared with a traditional construction technology, the construction technology is effectively simplified, construction difficulty and construction cost are reduced, and accordingly c</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDsOwjAQRNNQIOAOywEiEYiQKFEAUVHRR8ZZg5HjtbxrPgV3JwQOQDOjp3maYfbaWGMwoherHDCKOGw7Ak1eIjkIEfMQKQTrz4APrW5KLPnPzhKT7qFFuVADhiI02GX7da5kuycykHyDMShm4HS6qyew9MY4GxjlGCe_HmXT3fZY7XMMVCMHpdGj1NWhKIr5bLkqy_XiH-cNd_tKGg</recordid><startdate>20200529</startdate><enddate>20200529</enddate><creator>CUI CHENQIU</creator><creator>GUO ZHENHU</creator><creator>XING QISHENG</creator><creator>ZHENG JINLEI</creator><creator>HE JIAXIN</creator><creator>JIA XIAOJIE</creator><creator>LIU BINGKE</creator><creator>GUO XUDONG</creator><creator>HE SHAOHUI</creator><creator>BAI SHOUXING</creator><creator>LI YIMING</creator><creator>WANG AIJUN</creator><creator>LIANG ZHICHAO</creator><creator>SHAO XIANGYU</creator><scope>EVB</scope></search><sort><creationdate>20200529</creationdate><title>Differential settlement control pre-propping excavation construction method for deformation joint of underpass subway station</title><author>CUI CHENQIU ; GUO ZHENHU ; XING QISHENG ; ZHENG JINLEI ; HE JIAXIN ; JIA XIAOJIE ; LIU BINGKE ; GUO XUDONG ; HE SHAOHUI ; BAI SHOUXING ; LI YIMING ; WANG AIJUN ; LIANG ZHICHAO ; SHAO XIANGYU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111206944A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>CUI CHENQIU</creatorcontrib><creatorcontrib>GUO ZHENHU</creatorcontrib><creatorcontrib>XING QISHENG</creatorcontrib><creatorcontrib>ZHENG JINLEI</creatorcontrib><creatorcontrib>HE JIAXIN</creatorcontrib><creatorcontrib>JIA XIAOJIE</creatorcontrib><creatorcontrib>LIU BINGKE</creatorcontrib><creatorcontrib>GUO XUDONG</creatorcontrib><creatorcontrib>HE SHAOHUI</creatorcontrib><creatorcontrib>BAI SHOUXING</creatorcontrib><creatorcontrib>LI YIMING</creatorcontrib><creatorcontrib>WANG AIJUN</creatorcontrib><creatorcontrib>LIANG ZHICHAO</creatorcontrib><creatorcontrib>SHAO XIANGYU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CUI CHENQIU</au><au>GUO ZHENHU</au><au>XING QISHENG</au><au>ZHENG JINLEI</au><au>HE JIAXIN</au><au>JIA XIAOJIE</au><au>LIU BINGKE</au><au>GUO XUDONG</au><au>HE SHAOHUI</au><au>BAI SHOUXING</au><au>LI YIMING</au><au>WANG AIJUN</au><au>LIANG ZHICHAO</au><au>SHAO XIANGYU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Differential settlement control pre-propping excavation construction method for deformation joint of underpass subway station</title><date>2020-05-29</date><risdate>2020</risdate><abstract>The invention discloses a differential settlement control pre-propping excavation construction method for a deformation joint of an underpass subway station. The differential settlement control pre-propping excavation construction method comprises the five steps of deformation joint reinforcement, pre-construction, pilot tunnel primary reinforcement, pilot tunnel secondary reinforcement and working face construction. According to the construction method, the basic principle of a shallow tunneling method is followed in construction, so that the stress state of a long-term operation subway station structure is effectively improved; stable supporting structures are formed on the two sides of the deformation joint, so that differential settlement of the two sides of the deformation joint of the station is controlled; and meanwhile, compared with a traditional construction technology, the construction technology is effectively simplified, construction difficulty and construction cost are reduced, and accordingly c</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111206944A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Differential settlement control pre-propping excavation construction method for deformation joint of underpass subway station
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T23%3A49%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CUI%20CHENQIU&rft.date=2020-05-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111206944A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true