Rapid construction method for secondary lining of small-section tunnel
The invention discloses a rapid construction method for a secondary lining of a small-section tunnel. While in-tunnel cleaning is performed after tunnel holing-through, a rebar transport cart and a wheeled dumper are used for transporting and storing secondary lining rebars to a designated position...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHU HAIJUN CAO QIN JIANG SHANGZHI YU NANSHAN SU CHANGYI CUI JIAN SUN QING DAI XIAOSONG LIU KAIYANG CUI LISHAN |
description | The invention discloses a rapid construction method for a secondary lining of a small-section tunnel. While in-tunnel cleaning is performed after tunnel holing-through, a rebar transport cart and a wheeled dumper are used for transporting and storing secondary lining rebars to a designated position in the tunnel; and after tunnel cleaning is completed, the secondary lining is constructed from thetwo ends of the tunnel to the middle at the same time, firstly, a customized inverted arch formwork is used for constructing a lower inverted arch, and then, multiple gantry-type arch wall formwork trolleys are used for following an alternative bay method to construct an upper arch wall, wherein the multiple sections of gantry-type arch wall formwork trolleys form a set and are connected in a hinged manner, which can adapt to construction of the curved tunnel. According to the rapid construction method for the secondary lining of the small-section tunnel, the single construction section is long, the process linkage is |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111188633A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111188633A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111188633A3</originalsourceid><addsrcrecordid>eNrjZHALSizITFFIzs8rLikqTS7JzM9TyE0tychPUUjLL1IoTgXKpCQWVSrkZOZl5qUr5KcpFOcm5uToAmXAiktK8_JSc3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyznyEQWFiYGRs7GhOjBgBlVTP_</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid construction method for secondary lining of small-section tunnel</title><source>esp@cenet</source><creator>ZHU HAIJUN ; CAO QIN ; JIANG SHANGZHI ; YU NANSHAN ; SU CHANGYI ; CUI JIAN ; SUN QING ; DAI XIAOSONG ; LIU KAIYANG ; CUI LISHAN</creator><creatorcontrib>ZHU HAIJUN ; CAO QIN ; JIANG SHANGZHI ; YU NANSHAN ; SU CHANGYI ; CUI JIAN ; SUN QING ; DAI XIAOSONG ; LIU KAIYANG ; CUI LISHAN</creatorcontrib><description>The invention discloses a rapid construction method for a secondary lining of a small-section tunnel. While in-tunnel cleaning is performed after tunnel holing-through, a rebar transport cart and a wheeled dumper are used for transporting and storing secondary lining rebars to a designated position in the tunnel; and after tunnel cleaning is completed, the secondary lining is constructed from thetwo ends of the tunnel to the middle at the same time, firstly, a customized inverted arch formwork is used for constructing a lower inverted arch, and then, multiple gantry-type arch wall formwork trolleys are used for following an alternative bay method to construct an upper arch wall, wherein the multiple sections of gantry-type arch wall formwork trolleys form a set and are connected in a hinged manner, which can adapt to construction of the curved tunnel. According to the rapid construction method for the secondary lining of the small-section tunnel, the single construction section is long, the process linkage is</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200522&DB=EPODOC&CC=CN&NR=111188633A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200522&DB=EPODOC&CC=CN&NR=111188633A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHU HAIJUN</creatorcontrib><creatorcontrib>CAO QIN</creatorcontrib><creatorcontrib>JIANG SHANGZHI</creatorcontrib><creatorcontrib>YU NANSHAN</creatorcontrib><creatorcontrib>SU CHANGYI</creatorcontrib><creatorcontrib>CUI JIAN</creatorcontrib><creatorcontrib>SUN QING</creatorcontrib><creatorcontrib>DAI XIAOSONG</creatorcontrib><creatorcontrib>LIU KAIYANG</creatorcontrib><creatorcontrib>CUI LISHAN</creatorcontrib><title>Rapid construction method for secondary lining of small-section tunnel</title><description>The invention discloses a rapid construction method for a secondary lining of a small-section tunnel. While in-tunnel cleaning is performed after tunnel holing-through, a rebar transport cart and a wheeled dumper are used for transporting and storing secondary lining rebars to a designated position in the tunnel; and after tunnel cleaning is completed, the secondary lining is constructed from thetwo ends of the tunnel to the middle at the same time, firstly, a customized inverted arch formwork is used for constructing a lower inverted arch, and then, multiple gantry-type arch wall formwork trolleys are used for following an alternative bay method to construct an upper arch wall, wherein the multiple sections of gantry-type arch wall formwork trolleys form a set and are connected in a hinged manner, which can adapt to construction of the curved tunnel. According to the rapid construction method for the secondary lining of the small-section tunnel, the single construction section is long, the process linkage is</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHALSizITFFIzs8rLikqTS7JzM9TyE0tychPUUjLL1IoTgXKpCQWVSrkZOZl5qUr5KcpFOcm5uToAmXAiktK8_JSc3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyznyEQWFiYGRs7GhOjBgBlVTP_</recordid><startdate>20200522</startdate><enddate>20200522</enddate><creator>ZHU HAIJUN</creator><creator>CAO QIN</creator><creator>JIANG SHANGZHI</creator><creator>YU NANSHAN</creator><creator>SU CHANGYI</creator><creator>CUI JIAN</creator><creator>SUN QING</creator><creator>DAI XIAOSONG</creator><creator>LIU KAIYANG</creator><creator>CUI LISHAN</creator><scope>EVB</scope></search><sort><creationdate>20200522</creationdate><title>Rapid construction method for secondary lining of small-section tunnel</title><author>ZHU HAIJUN ; CAO QIN ; JIANG SHANGZHI ; YU NANSHAN ; SU CHANGYI ; CUI JIAN ; SUN QING ; DAI XIAOSONG ; LIU KAIYANG ; CUI LISHAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111188633A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHU HAIJUN</creatorcontrib><creatorcontrib>CAO QIN</creatorcontrib><creatorcontrib>JIANG SHANGZHI</creatorcontrib><creatorcontrib>YU NANSHAN</creatorcontrib><creatorcontrib>SU CHANGYI</creatorcontrib><creatorcontrib>CUI JIAN</creatorcontrib><creatorcontrib>SUN QING</creatorcontrib><creatorcontrib>DAI XIAOSONG</creatorcontrib><creatorcontrib>LIU KAIYANG</creatorcontrib><creatorcontrib>CUI LISHAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHU HAIJUN</au><au>CAO QIN</au><au>JIANG SHANGZHI</au><au>YU NANSHAN</au><au>SU CHANGYI</au><au>CUI JIAN</au><au>SUN QING</au><au>DAI XIAOSONG</au><au>LIU KAIYANG</au><au>CUI LISHAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid construction method for secondary lining of small-section tunnel</title><date>2020-05-22</date><risdate>2020</risdate><abstract>The invention discloses a rapid construction method for a secondary lining of a small-section tunnel. While in-tunnel cleaning is performed after tunnel holing-through, a rebar transport cart and a wheeled dumper are used for transporting and storing secondary lining rebars to a designated position in the tunnel; and after tunnel cleaning is completed, the secondary lining is constructed from thetwo ends of the tunnel to the middle at the same time, firstly, a customized inverted arch formwork is used for constructing a lower inverted arch, and then, multiple gantry-type arch wall formwork trolleys are used for following an alternative bay method to construct an upper arch wall, wherein the multiple sections of gantry-type arch wall formwork trolleys form a set and are connected in a hinged manner, which can adapt to construction of the curved tunnel. According to the rapid construction method for the secondary lining of the small-section tunnel, the single construction section is long, the process linkage is</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111188633A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Rapid construction method for secondary lining of small-section tunnel |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T21%3A02%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHU%20HAIJUN&rft.date=2020-05-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111188633A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |