Unsymmetrial loading tunnel structure for applying prestress through pilot tunnel and construction method thereof

The invention discloses an unsymmetrial loading tunnel structure for applying prestress through a pilot tunnel and a construction method thereof. The unsymmetrial loading tunnel structure comprises atunnel and a frame beam fixed to the earth surface of a slope. A pre-stressed anchor cable is connect...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG JIANMIN, WANG LEI, ZHU LINCHEN, HE CONG, ZHANG HAN, SHU DONGLI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YANG JIANMIN
WANG LEI
ZHU LINCHEN
HE CONG
ZHANG HAN
SHU DONGLI
description The invention discloses an unsymmetrial loading tunnel structure for applying prestress through a pilot tunnel and a construction method thereof. The unsymmetrial loading tunnel structure comprises atunnel and a frame beam fixed to the earth surface of a slope. A pre-stressed anchor cable is connected between the pilot tunnel of the tunnel and a frame beam. The construction method of the unsymmetrial loading tunnel structure comprises the steps that hole drilling is carried out in the pilot tunnel to be excavated from the earth surface of the unsymmetrial low side slope; the frame beam is constructed on the earth surface of the slope, the pilot tunnel is excavated, the pre-stressed anchor cable is placed in a drilled hole, and one end of the pre-stressed anchor cable is anchored on the frame beam; after prestress is applied to the pre-stressed anchor cable, the other end of the pre-stressed anchor cable is solidified on the wall of the pilot tunnel, and active reinforcing is carried out on the unsymmetrial lo
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111140248A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111140248A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111140248A3</originalsourceid><addsrcrecordid>eNqNjDsOwjAQRNNQIOAOywGQ-KSgRRGIigrqyLI3iSVn16zXRW6PEdAzzRTz3syr54PSNI6o4k2AwMZ56kEzEQZIKtlqFoSOBUyMYXqvUbAsmBLoIJz7AaIPrD_LkAPL9JE9E5T3gV2BUZC7ZTXrTEi4-vaiWl_O9-a6wcgtpmgsEmrb3HYl9XZfH0-Hf5gXs7hFdA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Unsymmetrial loading tunnel structure for applying prestress through pilot tunnel and construction method thereof</title><source>esp@cenet</source><creator>YANG JIANMIN ; WANG LEI ; ZHU LINCHEN ; HE CONG ; ZHANG HAN ; SHU DONGLI</creator><creatorcontrib>YANG JIANMIN ; WANG LEI ; ZHU LINCHEN ; HE CONG ; ZHANG HAN ; SHU DONGLI</creatorcontrib><description>The invention discloses an unsymmetrial loading tunnel structure for applying prestress through a pilot tunnel and a construction method thereof. The unsymmetrial loading tunnel structure comprises atunnel and a frame beam fixed to the earth surface of a slope. A pre-stressed anchor cable is connected between the pilot tunnel of the tunnel and a frame beam. The construction method of the unsymmetrial loading tunnel structure comprises the steps that hole drilling is carried out in the pilot tunnel to be excavated from the earth surface of the unsymmetrial low side slope; the frame beam is constructed on the earth surface of the slope, the pilot tunnel is excavated, the pre-stressed anchor cable is placed in a drilled hole, and one end of the pre-stressed anchor cable is anchored on the frame beam; after prestress is applied to the pre-stressed anchor cable, the other end of the pre-stressed anchor cable is solidified on the wall of the pilot tunnel, and active reinforcing is carried out on the unsymmetrial lo</description><language>chi ; eng</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200512&amp;DB=EPODOC&amp;CC=CN&amp;NR=111140248A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200512&amp;DB=EPODOC&amp;CC=CN&amp;NR=111140248A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG JIANMIN</creatorcontrib><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>ZHU LINCHEN</creatorcontrib><creatorcontrib>HE CONG</creatorcontrib><creatorcontrib>ZHANG HAN</creatorcontrib><creatorcontrib>SHU DONGLI</creatorcontrib><title>Unsymmetrial loading tunnel structure for applying prestress through pilot tunnel and construction method thereof</title><description>The invention discloses an unsymmetrial loading tunnel structure for applying prestress through a pilot tunnel and a construction method thereof. The unsymmetrial loading tunnel structure comprises atunnel and a frame beam fixed to the earth surface of a slope. A pre-stressed anchor cable is connected between the pilot tunnel of the tunnel and a frame beam. The construction method of the unsymmetrial loading tunnel structure comprises the steps that hole drilling is carried out in the pilot tunnel to be excavated from the earth surface of the unsymmetrial low side slope; the frame beam is constructed on the earth surface of the slope, the pilot tunnel is excavated, the pre-stressed anchor cable is placed in a drilled hole, and one end of the pre-stressed anchor cable is anchored on the frame beam; after prestress is applied to the pre-stressed anchor cable, the other end of the pre-stressed anchor cable is solidified on the wall of the pilot tunnel, and active reinforcing is carried out on the unsymmetrial lo</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDsOwjAQRNNQIOAOywGQ-KSgRRGIigrqyLI3iSVn16zXRW6PEdAzzRTz3syr54PSNI6o4k2AwMZ56kEzEQZIKtlqFoSOBUyMYXqvUbAsmBLoIJz7AaIPrD_LkAPL9JE9E5T3gV2BUZC7ZTXrTEi4-vaiWl_O9-a6wcgtpmgsEmrb3HYl9XZfH0-Hf5gXs7hFdA</recordid><startdate>20200512</startdate><enddate>20200512</enddate><creator>YANG JIANMIN</creator><creator>WANG LEI</creator><creator>ZHU LINCHEN</creator><creator>HE CONG</creator><creator>ZHANG HAN</creator><creator>SHU DONGLI</creator><scope>EVB</scope></search><sort><creationdate>20200512</creationdate><title>Unsymmetrial loading tunnel structure for applying prestress through pilot tunnel and construction method thereof</title><author>YANG JIANMIN ; WANG LEI ; ZHU LINCHEN ; HE CONG ; ZHANG HAN ; SHU DONGLI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111140248A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG JIANMIN</creatorcontrib><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>ZHU LINCHEN</creatorcontrib><creatorcontrib>HE CONG</creatorcontrib><creatorcontrib>ZHANG HAN</creatorcontrib><creatorcontrib>SHU DONGLI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG JIANMIN</au><au>WANG LEI</au><au>ZHU LINCHEN</au><au>HE CONG</au><au>ZHANG HAN</au><au>SHU DONGLI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Unsymmetrial loading tunnel structure for applying prestress through pilot tunnel and construction method thereof</title><date>2020-05-12</date><risdate>2020</risdate><abstract>The invention discloses an unsymmetrial loading tunnel structure for applying prestress through a pilot tunnel and a construction method thereof. The unsymmetrial loading tunnel structure comprises atunnel and a frame beam fixed to the earth surface of a slope. A pre-stressed anchor cable is connected between the pilot tunnel of the tunnel and a frame beam. The construction method of the unsymmetrial loading tunnel structure comprises the steps that hole drilling is carried out in the pilot tunnel to be excavated from the earth surface of the unsymmetrial low side slope; the frame beam is constructed on the earth surface of the slope, the pilot tunnel is excavated, the pre-stressed anchor cable is placed in a drilled hole, and one end of the pre-stressed anchor cable is anchored on the frame beam; after prestress is applied to the pre-stressed anchor cable, the other end of the pre-stressed anchor cable is solidified on the wall of the pilot tunnel, and active reinforcing is carried out on the unsymmetrial lo</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111140248A
source esp@cenet
subjects EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title Unsymmetrial loading tunnel structure for applying prestress through pilot tunnel and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T17%3A17%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20JIANMIN&rft.date=2020-05-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111140248A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true