Pile-end post-grouting construction and grouting failure treatment device and method

The invention discloses a pile-end post-grouting construction and grouting failure treatment device and method. The pile-end post-grouting construction and grouting failure treatment device comprisesa grout mixing truck and a high-pressure grouting bin, wherein the grout mixing truck comprises a mix...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WEI SHANSHAN, TAN FENGSHEN, LI CHANGSHENG, HUANG XUEJUN, CHEN BILIAN, YIN LIWEI, CHEN GUOZHAN, FANG MAN, ZHANG PENG, FANG XIANQIANG, ZHANG GAOXU, TANG WEN, FANG ZHIMAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WEI SHANSHAN
TAN FENGSHEN
LI CHANGSHENG
HUANG XUEJUN
CHEN BILIAN
YIN LIWEI
CHEN GUOZHAN
FANG MAN
ZHANG PENG
FANG XIANQIANG
ZHANG GAOXU
TANG WEN
FANG ZHIMAO
description The invention discloses a pile-end post-grouting construction and grouting failure treatment device and method. The pile-end post-grouting construction and grouting failure treatment device comprisesa grout mixing truck and a high-pressure grouting bin, wherein the grout mixing truck comprises a mixing truck body; a driving battery and a mixing tank are fixedly mounted on the outer wall of the top of the mixing truck body; a mixing motor is fixedly mounted on the outer wall of the top of the mixing tank; the end, penetrating through the mixing tank, of the output shaft of the mixing motor iswelded with a mixing rod; and the mixing rod is positioned inside the mixing tank. The pile-end post-grouting construction and grouting failure treatment method comprises the steps of determining a mounting position of a grouting disk before pile forming of a cast-in-place pile, and pre-embedding the grouting disk at the bottom end of the pile so as to finish the pre-embedding of the grouting disk. The pile-end post-grouti
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111042142A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111042142A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111042142A3</originalsourceid><addsrcrecordid>eNqNyrEKwjAURuEuDqK-Q3yAgKl9ASmKkzh0LyH5WwPpvSG58fkVEWenM3xn3Qz3EKFBXiUuoufMVQLNyjEVydVJYFL2zT-ZbIg1Q0mGlQUkyuMZHD7XAnmw3zarycaC3bebZn85D_1VI_GIkqwDQcb-Zow5dK3p2tPxn-cF4Ok5OA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pile-end post-grouting construction and grouting failure treatment device and method</title><source>esp@cenet</source><creator>WEI SHANSHAN ; TAN FENGSHEN ; LI CHANGSHENG ; HUANG XUEJUN ; CHEN BILIAN ; YIN LIWEI ; CHEN GUOZHAN ; FANG MAN ; ZHANG PENG ; FANG XIANQIANG ; ZHANG GAOXU ; TANG WEN ; FANG ZHIMAO</creator><creatorcontrib>WEI SHANSHAN ; TAN FENGSHEN ; LI CHANGSHENG ; HUANG XUEJUN ; CHEN BILIAN ; YIN LIWEI ; CHEN GUOZHAN ; FANG MAN ; ZHANG PENG ; FANG XIANQIANG ; ZHANG GAOXU ; TANG WEN ; FANG ZHIMAO</creatorcontrib><description>The invention discloses a pile-end post-grouting construction and grouting failure treatment device and method. The pile-end post-grouting construction and grouting failure treatment device comprisesa grout mixing truck and a high-pressure grouting bin, wherein the grout mixing truck comprises a mixing truck body; a driving battery and a mixing tank are fixedly mounted on the outer wall of the top of the mixing truck body; a mixing motor is fixedly mounted on the outer wall of the top of the mixing tank; the end, penetrating through the mixing tank, of the output shaft of the mixing motor iswelded with a mixing rod; and the mixing rod is positioned inside the mixing tank. The pile-end post-grouting construction and grouting failure treatment method comprises the steps of determining a mounting position of a grouting disk before pile forming of a cast-in-place pile, and pre-embedding the grouting disk at the bottom end of the pile so as to finish the pre-embedding of the grouting disk. The pile-end post-grouti</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200421&amp;DB=EPODOC&amp;CC=CN&amp;NR=111042142A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200421&amp;DB=EPODOC&amp;CC=CN&amp;NR=111042142A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WEI SHANSHAN</creatorcontrib><creatorcontrib>TAN FENGSHEN</creatorcontrib><creatorcontrib>LI CHANGSHENG</creatorcontrib><creatorcontrib>HUANG XUEJUN</creatorcontrib><creatorcontrib>CHEN BILIAN</creatorcontrib><creatorcontrib>YIN LIWEI</creatorcontrib><creatorcontrib>CHEN GUOZHAN</creatorcontrib><creatorcontrib>FANG MAN</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>FANG XIANQIANG</creatorcontrib><creatorcontrib>ZHANG GAOXU</creatorcontrib><creatorcontrib>TANG WEN</creatorcontrib><creatorcontrib>FANG ZHIMAO</creatorcontrib><title>Pile-end post-grouting construction and grouting failure treatment device and method</title><description>The invention discloses a pile-end post-grouting construction and grouting failure treatment device and method. The pile-end post-grouting construction and grouting failure treatment device comprisesa grout mixing truck and a high-pressure grouting bin, wherein the grout mixing truck comprises a mixing truck body; a driving battery and a mixing tank are fixedly mounted on the outer wall of the top of the mixing truck body; a mixing motor is fixedly mounted on the outer wall of the top of the mixing tank; the end, penetrating through the mixing tank, of the output shaft of the mixing motor iswelded with a mixing rod; and the mixing rod is positioned inside the mixing tank. The pile-end post-grouting construction and grouting failure treatment method comprises the steps of determining a mounting position of a grouting disk before pile forming of a cast-in-place pile, and pre-embedding the grouting disk at the bottom end of the pile so as to finish the pre-embedding of the grouting disk. The pile-end post-grouti</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyrEKwjAURuEuDqK-Q3yAgKl9ASmKkzh0LyH5WwPpvSG58fkVEWenM3xn3Qz3EKFBXiUuoufMVQLNyjEVydVJYFL2zT-ZbIg1Q0mGlQUkyuMZHD7XAnmw3zarycaC3bebZn85D_1VI_GIkqwDQcb-Zow5dK3p2tPxn-cF4Ok5OA</recordid><startdate>20200421</startdate><enddate>20200421</enddate><creator>WEI SHANSHAN</creator><creator>TAN FENGSHEN</creator><creator>LI CHANGSHENG</creator><creator>HUANG XUEJUN</creator><creator>CHEN BILIAN</creator><creator>YIN LIWEI</creator><creator>CHEN GUOZHAN</creator><creator>FANG MAN</creator><creator>ZHANG PENG</creator><creator>FANG XIANQIANG</creator><creator>ZHANG GAOXU</creator><creator>TANG WEN</creator><creator>FANG ZHIMAO</creator><scope>EVB</scope></search><sort><creationdate>20200421</creationdate><title>Pile-end post-grouting construction and grouting failure treatment device and method</title><author>WEI SHANSHAN ; TAN FENGSHEN ; LI CHANGSHENG ; HUANG XUEJUN ; CHEN BILIAN ; YIN LIWEI ; CHEN GUOZHAN ; FANG MAN ; ZHANG PENG ; FANG XIANQIANG ; ZHANG GAOXU ; TANG WEN ; FANG ZHIMAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111042142A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WEI SHANSHAN</creatorcontrib><creatorcontrib>TAN FENGSHEN</creatorcontrib><creatorcontrib>LI CHANGSHENG</creatorcontrib><creatorcontrib>HUANG XUEJUN</creatorcontrib><creatorcontrib>CHEN BILIAN</creatorcontrib><creatorcontrib>YIN LIWEI</creatorcontrib><creatorcontrib>CHEN GUOZHAN</creatorcontrib><creatorcontrib>FANG MAN</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>FANG XIANQIANG</creatorcontrib><creatorcontrib>ZHANG GAOXU</creatorcontrib><creatorcontrib>TANG WEN</creatorcontrib><creatorcontrib>FANG ZHIMAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WEI SHANSHAN</au><au>TAN FENGSHEN</au><au>LI CHANGSHENG</au><au>HUANG XUEJUN</au><au>CHEN BILIAN</au><au>YIN LIWEI</au><au>CHEN GUOZHAN</au><au>FANG MAN</au><au>ZHANG PENG</au><au>FANG XIANQIANG</au><au>ZHANG GAOXU</au><au>TANG WEN</au><au>FANG ZHIMAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pile-end post-grouting construction and grouting failure treatment device and method</title><date>2020-04-21</date><risdate>2020</risdate><abstract>The invention discloses a pile-end post-grouting construction and grouting failure treatment device and method. The pile-end post-grouting construction and grouting failure treatment device comprisesa grout mixing truck and a high-pressure grouting bin, wherein the grout mixing truck comprises a mixing truck body; a driving battery and a mixing tank are fixedly mounted on the outer wall of the top of the mixing truck body; a mixing motor is fixedly mounted on the outer wall of the top of the mixing tank; the end, penetrating through the mixing tank, of the output shaft of the mixing motor iswelded with a mixing rod; and the mixing rod is positioned inside the mixing tank. The pile-end post-grouting construction and grouting failure treatment method comprises the steps of determining a mounting position of a grouting disk before pile forming of a cast-in-place pile, and pre-embedding the grouting disk at the bottom end of the pile so as to finish the pre-embedding of the grouting disk. The pile-end post-grouti</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111042142A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pile-end post-grouting construction and grouting failure treatment device and method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T13%3A02%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WEI%20SHANSHAN&rft.date=2020-04-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111042142A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true