Construction method of reinforcing structure of overlying construction waste field foundation on soft soil

The invention discloses a construction method of a reinforcing structure of an overlying construction waste field on soft soil, and provides feasible construction method support for effective implementation of the reinforcing structure of an overlying construction waste foundation on the soft soil....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YAO YUCHUN, CHENG YUN, LI ANHONG, PANG YINGGANG, FENG ZHIJUN, ZHOU CHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YAO YUCHUN
CHENG YUN
LI ANHONG
PANG YINGGANG
FENG ZHIJUN
ZHOU CHENG
description The invention discloses a construction method of a reinforcing structure of an overlying construction waste field on soft soil, and provides feasible construction method support for effective implementation of the reinforcing structure of an overlying construction waste foundation on the soft soil. The method includes the following steps that (1) reinforcing pile position plane positioning is performed; (2) column hammer perforating construction is performed on the foundation by the aid of a column hammer machine, and a column hammer performs punching to the soft soil layer surface; (3) vertical reinforcing steel bars are hammered into the soft soil layer around a column hammer hole at intervals; (4) a concrete mixture is mixed, and the placing time of the concrete mixture is shorter thanthe initial setting time; (5) a long and deep jute bag with the open upper part and the closed lower part is placed in the column hammer hole from the ground; (6) the concrete mixture is placed into the long and deep jute bag
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110984116A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110984116A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110984116A3</originalsourceid><addsrcrecordid>eNqNi70KAjEQhNNYiPoO6wMIBkW0lKBYWdkfIdnVSNw98qP49t6phaUwzMA3M0N1NcK5pOpKEIYblot4EIKEgUmSC3yGT18T9oXcMcVnj93v82FzQaCA0QNJZW_fuFMWKp2FOFYDsjHj5JsjNd3vTuYww1YazK11yFgac9R6vlkvtV5tF_9sXmHEQmU</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of reinforcing structure of overlying construction waste field foundation on soft soil</title><source>esp@cenet</source><creator>YAO YUCHUN ; CHENG YUN ; LI ANHONG ; PANG YINGGANG ; FENG ZHIJUN ; ZHOU CHENG</creator><creatorcontrib>YAO YUCHUN ; CHENG YUN ; LI ANHONG ; PANG YINGGANG ; FENG ZHIJUN ; ZHOU CHENG</creatorcontrib><description>The invention discloses a construction method of a reinforcing structure of an overlying construction waste field on soft soil, and provides feasible construction method support for effective implementation of the reinforcing structure of an overlying construction waste foundation on the soft soil. The method includes the following steps that (1) reinforcing pile position plane positioning is performed; (2) column hammer perforating construction is performed on the foundation by the aid of a column hammer machine, and a column hammer performs punching to the soft soil layer surface; (3) vertical reinforcing steel bars are hammered into the soft soil layer around a column hammer hole at intervals; (4) a concrete mixture is mixed, and the placing time of the concrete mixture is shorter thanthe initial setting time; (5) a long and deep jute bag with the open upper part and the closed lower part is placed in the column hammer hole from the ground; (6) the concrete mixture is placed into the long and deep jute bag</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200410&amp;DB=EPODOC&amp;CC=CN&amp;NR=110984116A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200410&amp;DB=EPODOC&amp;CC=CN&amp;NR=110984116A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAO YUCHUN</creatorcontrib><creatorcontrib>CHENG YUN</creatorcontrib><creatorcontrib>LI ANHONG</creatorcontrib><creatorcontrib>PANG YINGGANG</creatorcontrib><creatorcontrib>FENG ZHIJUN</creatorcontrib><creatorcontrib>ZHOU CHENG</creatorcontrib><title>Construction method of reinforcing structure of overlying construction waste field foundation on soft soil</title><description>The invention discloses a construction method of a reinforcing structure of an overlying construction waste field on soft soil, and provides feasible construction method support for effective implementation of the reinforcing structure of an overlying construction waste foundation on the soft soil. The method includes the following steps that (1) reinforcing pile position plane positioning is performed; (2) column hammer perforating construction is performed on the foundation by the aid of a column hammer machine, and a column hammer performs punching to the soft soil layer surface; (3) vertical reinforcing steel bars are hammered into the soft soil layer around a column hammer hole at intervals; (4) a concrete mixture is mixed, and the placing time of the concrete mixture is shorter thanthe initial setting time; (5) a long and deep jute bag with the open upper part and the closed lower part is placed in the column hammer hole from the ground; (6) the concrete mixture is placed into the long and deep jute bag</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi70KAjEQhNNYiPoO6wMIBkW0lKBYWdkfIdnVSNw98qP49t6phaUwzMA3M0N1NcK5pOpKEIYblot4EIKEgUmSC3yGT18T9oXcMcVnj93v82FzQaCA0QNJZW_fuFMWKp2FOFYDsjHj5JsjNd3vTuYww1YazK11yFgac9R6vlkvtV5tF_9sXmHEQmU</recordid><startdate>20200410</startdate><enddate>20200410</enddate><creator>YAO YUCHUN</creator><creator>CHENG YUN</creator><creator>LI ANHONG</creator><creator>PANG YINGGANG</creator><creator>FENG ZHIJUN</creator><creator>ZHOU CHENG</creator><scope>EVB</scope></search><sort><creationdate>20200410</creationdate><title>Construction method of reinforcing structure of overlying construction waste field foundation on soft soil</title><author>YAO YUCHUN ; CHENG YUN ; LI ANHONG ; PANG YINGGANG ; FENG ZHIJUN ; ZHOU CHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110984116A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YAO YUCHUN</creatorcontrib><creatorcontrib>CHENG YUN</creatorcontrib><creatorcontrib>LI ANHONG</creatorcontrib><creatorcontrib>PANG YINGGANG</creatorcontrib><creatorcontrib>FENG ZHIJUN</creatorcontrib><creatorcontrib>ZHOU CHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAO YUCHUN</au><au>CHENG YUN</au><au>LI ANHONG</au><au>PANG YINGGANG</au><au>FENG ZHIJUN</au><au>ZHOU CHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of reinforcing structure of overlying construction waste field foundation on soft soil</title><date>2020-04-10</date><risdate>2020</risdate><abstract>The invention discloses a construction method of a reinforcing structure of an overlying construction waste field on soft soil, and provides feasible construction method support for effective implementation of the reinforcing structure of an overlying construction waste foundation on the soft soil. The method includes the following steps that (1) reinforcing pile position plane positioning is performed; (2) column hammer perforating construction is performed on the foundation by the aid of a column hammer machine, and a column hammer performs punching to the soft soil layer surface; (3) vertical reinforcing steel bars are hammered into the soft soil layer around a column hammer hole at intervals; (4) a concrete mixture is mixed, and the placing time of the concrete mixture is shorter thanthe initial setting time; (5) a long and deep jute bag with the open upper part and the closed lower part is placed in the column hammer hole from the ground; (6) the concrete mixture is placed into the long and deep jute bag</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN110984116A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method of reinforcing structure of overlying construction waste field foundation on soft soil
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T11%3A58%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAO%20YUCHUN&rft.date=2020-04-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110984116A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true