Method for predicting construction period of power transmission line engineering
The invention relates to the technical field of power systems, in particular to a method for predicting the construction period of power transmission line engineering. The method for predicting the construction period of a power transmission line project comprises the following steps: analyzing and...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHEN BINGQIAN WU SHENPING LIU JINPENG LUO KEWEI LIU QIN GUO ZHIBIN YAN QINGMENG YIN CHEN |
description | The invention relates to the technical field of power systems, in particular to a method for predicting the construction period of power transmission line engineering. The method for predicting the construction period of a power transmission line project comprises the following steps: analyzing and determining main influence factors of the construction period of the power transmission line projectthrough a fishbone diagram method or a system dynamics method; collecting historical engineering influence factors related to the power transmission line engineering construction period and corresponding construction period statistical data through investigation engineering archives; constructing a support vector machine model, performing screening processing on influence factors of historical engineering of the power transmission line to obtain decision influence factors, and performing simulation training on the support vector machine model by taking the decision influence factors and corresponding construction per |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110895729A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110895729A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110895729A3</originalsourceid><addsrcrecordid>eNrjZAjwTS3JyE9RSMsvUigoSk3JTC7JzEtXSM7PKy4pKgVy8vMUClKLMoFK8tMUCvLLU4sUSooS84pzM4uLQZI5mXmpCql56UAKqCwvnYeBNS0xpziVF0pzMyi6uYY4e-imFuTHpxYXJCan5qWWxDv7GRoaWFiamhtZOhoTowYABo04SQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for predicting construction period of power transmission line engineering</title><source>esp@cenet</source><creator>CHEN BINGQIAN ; WU SHENPING ; LIU JINPENG ; LUO KEWEI ; LIU QIN ; GUO ZHIBIN ; YAN QINGMENG ; YIN CHEN</creator><creatorcontrib>CHEN BINGQIAN ; WU SHENPING ; LIU JINPENG ; LUO KEWEI ; LIU QIN ; GUO ZHIBIN ; YAN QINGMENG ; YIN CHEN</creatorcontrib><description>The invention relates to the technical field of power systems, in particular to a method for predicting the construction period of power transmission line engineering. The method for predicting the construction period of a power transmission line project comprises the following steps: analyzing and determining main influence factors of the construction period of the power transmission line projectthrough a fishbone diagram method or a system dynamics method; collecting historical engineering influence factors related to the power transmission line engineering construction period and corresponding construction period statistical data through investigation engineering archives; constructing a support vector machine model, performing screening processing on influence factors of historical engineering of the power transmission line to obtain decision influence factors, and performing simulation training on the support vector machine model by taking the decision influence factors and corresponding construction per</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200320&DB=EPODOC&CC=CN&NR=110895729A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25568,76551</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200320&DB=EPODOC&CC=CN&NR=110895729A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN BINGQIAN</creatorcontrib><creatorcontrib>WU SHENPING</creatorcontrib><creatorcontrib>LIU JINPENG</creatorcontrib><creatorcontrib>LUO KEWEI</creatorcontrib><creatorcontrib>LIU QIN</creatorcontrib><creatorcontrib>GUO ZHIBIN</creatorcontrib><creatorcontrib>YAN QINGMENG</creatorcontrib><creatorcontrib>YIN CHEN</creatorcontrib><title>Method for predicting construction period of power transmission line engineering</title><description>The invention relates to the technical field of power systems, in particular to a method for predicting the construction period of power transmission line engineering. The method for predicting the construction period of a power transmission line project comprises the following steps: analyzing and determining main influence factors of the construction period of the power transmission line projectthrough a fishbone diagram method or a system dynamics method; collecting historical engineering influence factors related to the power transmission line engineering construction period and corresponding construction period statistical data through investigation engineering archives; constructing a support vector machine model, performing screening processing on influence factors of historical engineering of the power transmission line to obtain decision influence factors, and performing simulation training on the support vector machine model by taking the decision influence factors and corresponding construction per</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAjwTS3JyE9RSMsvUigoSk3JTC7JzEtXSM7PKy4pKgVy8vMUClKLMoFK8tMUCvLLU4sUSooS84pzM4uLQZI5mXmpCql56UAKqCwvnYeBNS0xpziVF0pzMyi6uYY4e-imFuTHpxYXJCan5qWWxDv7GRoaWFiamhtZOhoTowYABo04SQ</recordid><startdate>20200320</startdate><enddate>20200320</enddate><creator>CHEN BINGQIAN</creator><creator>WU SHENPING</creator><creator>LIU JINPENG</creator><creator>LUO KEWEI</creator><creator>LIU QIN</creator><creator>GUO ZHIBIN</creator><creator>YAN QINGMENG</creator><creator>YIN CHEN</creator><scope>EVB</scope></search><sort><creationdate>20200320</creationdate><title>Method for predicting construction period of power transmission line engineering</title><author>CHEN BINGQIAN ; WU SHENPING ; LIU JINPENG ; LUO KEWEI ; LIU QIN ; GUO ZHIBIN ; YAN QINGMENG ; YIN CHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110895729A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN BINGQIAN</creatorcontrib><creatorcontrib>WU SHENPING</creatorcontrib><creatorcontrib>LIU JINPENG</creatorcontrib><creatorcontrib>LUO KEWEI</creatorcontrib><creatorcontrib>LIU QIN</creatorcontrib><creatorcontrib>GUO ZHIBIN</creatorcontrib><creatorcontrib>YAN QINGMENG</creatorcontrib><creatorcontrib>YIN CHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN BINGQIAN</au><au>WU SHENPING</au><au>LIU JINPENG</au><au>LUO KEWEI</au><au>LIU QIN</au><au>GUO ZHIBIN</au><au>YAN QINGMENG</au><au>YIN CHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for predicting construction period of power transmission line engineering</title><date>2020-03-20</date><risdate>2020</risdate><abstract>The invention relates to the technical field of power systems, in particular to a method for predicting the construction period of power transmission line engineering. The method for predicting the construction period of a power transmission line project comprises the following steps: analyzing and determining main influence factors of the construction period of the power transmission line projectthrough a fishbone diagram method or a system dynamics method; collecting historical engineering influence factors related to the power transmission line engineering construction period and corresponding construction period statistical data through investigation engineering archives; constructing a support vector machine model, performing screening processing on influence factors of historical engineering of the power transmission line to obtain decision influence factors, and performing simulation training on the support vector machine model by taking the decision influence factors and corresponding construction per</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN110895729A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Method for predicting construction period of power transmission line engineering |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T23%3A02%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20BINGQIAN&rft.date=2020-03-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110895729A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |