Estimation method and device for beam falling prevention effect
The invention provides an estimation method and device for a beam falling prevention effect. The estimation method comprises the steps: building a power space calculation model according to a target pier structure; inputting boundary conditions into the power space calculation model, and determining...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIN SEN AI YOUYUAN ZHANG YANLIN SUN PINGKUAN LIU WEN ZI XIYANG LIU CHUANG WANG CHENGBIN CHEN YINGXIN XU FENG LI BO WU JINGWU WANG JIAN HE WEI LI DIANBIN QIN FENG LI ZHAOPENG ZHANG HAIJIAN BAI MO SHANGGUAN SU |
description | The invention provides an estimation method and device for a beam falling prevention effect. The estimation method comprises the steps: building a power space calculation model according to a target pier structure; inputting boundary conditions into the power space calculation model, and determining a first parameter model; inputting a collision simulation condition into the first parameter model,and determining a second parameter model; and inputting actual seismic wave data into the second parameter model, and determining the anti-beam-falling effect of the target pier structure. Accordingto the estimation method, the final collision simulation model is determined through three-stage modeling, and the anti-beam-falling effect of actual seismic wave data can be effectively and accurately evaluated.
本发明提供了一种防落梁效果的估计方法及装置,其中该方法包括:根据目标桥墩结构,建立动力空间计算模型;将边界条件输入至所述动力空间计算模型,确定第一参数模型;将碰撞模拟条件输入至所述第一参数模型,确定第二参数模型;将实际地震波数据输入所述第二参数模型,确定所述目标桥墩结构的防落梁效果。本发明通过三阶段建模确定最终的碰撞模拟模型,能够对实际地震波数据的防落梁效果进行有效准确的评估。 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110737946A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110737946A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110737946A3</originalsourceid><addsrcrecordid>eNrjZLB3LS7JzE0syczPU8hNLcnIT1FIzEtRSEkty0xOVUjLL1JISk3MVUhLzMnJzEtXKChKLUvNA6tOTUtLTS7hYWAFyhWn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDA3Njc0sTM0djYtQAAIfYMOM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Estimation method and device for beam falling prevention effect</title><source>esp@cenet</source><creator>LIN SEN ; AI YOUYUAN ; ZHANG YANLIN ; SUN PINGKUAN ; LIU WEN ; ZI XIYANG ; LIU CHUANG ; WANG CHENGBIN ; CHEN YINGXIN ; XU FENG ; LI BO ; WU JINGWU ; WANG JIAN ; HE WEI ; LI DIANBIN ; QIN FENG ; LI ZHAOPENG ; ZHANG HAIJIAN ; BAI MO ; SHANGGUAN SU</creator><creatorcontrib>LIN SEN ; AI YOUYUAN ; ZHANG YANLIN ; SUN PINGKUAN ; LIU WEN ; ZI XIYANG ; LIU CHUANG ; WANG CHENGBIN ; CHEN YINGXIN ; XU FENG ; LI BO ; WU JINGWU ; WANG JIAN ; HE WEI ; LI DIANBIN ; QIN FENG ; LI ZHAOPENG ; ZHANG HAIJIAN ; BAI MO ; SHANGGUAN SU</creatorcontrib><description>The invention provides an estimation method and device for a beam falling prevention effect. The estimation method comprises the steps: building a power space calculation model according to a target pier structure; inputting boundary conditions into the power space calculation model, and determining a first parameter model; inputting a collision simulation condition into the first parameter model,and determining a second parameter model; and inputting actual seismic wave data into the second parameter model, and determining the anti-beam-falling effect of the target pier structure. Accordingto the estimation method, the final collision simulation model is determined through three-stage modeling, and the anti-beam-falling effect of actual seismic wave data can be effectively and accurately evaluated.
本发明提供了一种防落梁效果的估计方法及装置,其中该方法包括:根据目标桥墩结构,建立动力空间计算模型;将边界条件输入至所述动力空间计算模型,确定第一参数模型;将碰撞模拟条件输入至所述第一参数模型,确定第二参数模型;将实际地震波数据输入所述第二参数模型,确定所述目标桥墩结构的防落梁效果。本发明通过三阶段建模确定最终的碰撞模拟模型,能够对实际地震波数据的防落梁效果进行有效准确的评估。</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200131&DB=EPODOC&CC=CN&NR=110737946A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200131&DB=EPODOC&CC=CN&NR=110737946A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIN SEN</creatorcontrib><creatorcontrib>AI YOUYUAN</creatorcontrib><creatorcontrib>ZHANG YANLIN</creatorcontrib><creatorcontrib>SUN PINGKUAN</creatorcontrib><creatorcontrib>LIU WEN</creatorcontrib><creatorcontrib>ZI XIYANG</creatorcontrib><creatorcontrib>LIU CHUANG</creatorcontrib><creatorcontrib>WANG CHENGBIN</creatorcontrib><creatorcontrib>CHEN YINGXIN</creatorcontrib><creatorcontrib>XU FENG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>WU JINGWU</creatorcontrib><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>HE WEI</creatorcontrib><creatorcontrib>LI DIANBIN</creatorcontrib><creatorcontrib>QIN FENG</creatorcontrib><creatorcontrib>LI ZHAOPENG</creatorcontrib><creatorcontrib>ZHANG HAIJIAN</creatorcontrib><creatorcontrib>BAI MO</creatorcontrib><creatorcontrib>SHANGGUAN SU</creatorcontrib><title>Estimation method and device for beam falling prevention effect</title><description>The invention provides an estimation method and device for a beam falling prevention effect. The estimation method comprises the steps: building a power space calculation model according to a target pier structure; inputting boundary conditions into the power space calculation model, and determining a first parameter model; inputting a collision simulation condition into the first parameter model,and determining a second parameter model; and inputting actual seismic wave data into the second parameter model, and determining the anti-beam-falling effect of the target pier structure. Accordingto the estimation method, the final collision simulation model is determined through three-stage modeling, and the anti-beam-falling effect of actual seismic wave data can be effectively and accurately evaluated.
本发明提供了一种防落梁效果的估计方法及装置,其中该方法包括:根据目标桥墩结构,建立动力空间计算模型;将边界条件输入至所述动力空间计算模型,确定第一参数模型;将碰撞模拟条件输入至所述第一参数模型,确定第二参数模型;将实际地震波数据输入所述第二参数模型,确定所述目标桥墩结构的防落梁效果。本发明通过三阶段建模确定最终的碰撞模拟模型,能够对实际地震波数据的防落梁效果进行有效准确的评估。</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB3LS7JzE0syczPU8hNLcnIT1FIzEtRSEkty0xOVUjLL1JISk3MVUhLzMnJzEtXKChKLUvNA6tOTUtLTS7hYWAFyhWn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDA3Njc0sTM0djYtQAAIfYMOM</recordid><startdate>20200131</startdate><enddate>20200131</enddate><creator>LIN SEN</creator><creator>AI YOUYUAN</creator><creator>ZHANG YANLIN</creator><creator>SUN PINGKUAN</creator><creator>LIU WEN</creator><creator>ZI XIYANG</creator><creator>LIU CHUANG</creator><creator>WANG CHENGBIN</creator><creator>CHEN YINGXIN</creator><creator>XU FENG</creator><creator>LI BO</creator><creator>WU JINGWU</creator><creator>WANG JIAN</creator><creator>HE WEI</creator><creator>LI DIANBIN</creator><creator>QIN FENG</creator><creator>LI ZHAOPENG</creator><creator>ZHANG HAIJIAN</creator><creator>BAI MO</creator><creator>SHANGGUAN SU</creator><scope>EVB</scope></search><sort><creationdate>20200131</creationdate><title>Estimation method and device for beam falling prevention effect</title><author>LIN SEN ; AI YOUYUAN ; ZHANG YANLIN ; SUN PINGKUAN ; LIU WEN ; ZI XIYANG ; LIU CHUANG ; WANG CHENGBIN ; CHEN YINGXIN ; XU FENG ; LI BO ; WU JINGWU ; WANG JIAN ; HE WEI ; LI DIANBIN ; QIN FENG ; LI ZHAOPENG ; ZHANG HAIJIAN ; BAI MO ; SHANGGUAN SU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110737946A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIN SEN</creatorcontrib><creatorcontrib>AI YOUYUAN</creatorcontrib><creatorcontrib>ZHANG YANLIN</creatorcontrib><creatorcontrib>SUN PINGKUAN</creatorcontrib><creatorcontrib>LIU WEN</creatorcontrib><creatorcontrib>ZI XIYANG</creatorcontrib><creatorcontrib>LIU CHUANG</creatorcontrib><creatorcontrib>WANG CHENGBIN</creatorcontrib><creatorcontrib>CHEN YINGXIN</creatorcontrib><creatorcontrib>XU FENG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>WU JINGWU</creatorcontrib><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>HE WEI</creatorcontrib><creatorcontrib>LI DIANBIN</creatorcontrib><creatorcontrib>QIN FENG</creatorcontrib><creatorcontrib>LI ZHAOPENG</creatorcontrib><creatorcontrib>ZHANG HAIJIAN</creatorcontrib><creatorcontrib>BAI MO</creatorcontrib><creatorcontrib>SHANGGUAN SU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIN SEN</au><au>AI YOUYUAN</au><au>ZHANG YANLIN</au><au>SUN PINGKUAN</au><au>LIU WEN</au><au>ZI XIYANG</au><au>LIU CHUANG</au><au>WANG CHENGBIN</au><au>CHEN YINGXIN</au><au>XU FENG</au><au>LI BO</au><au>WU JINGWU</au><au>WANG JIAN</au><au>HE WEI</au><au>LI DIANBIN</au><au>QIN FENG</au><au>LI ZHAOPENG</au><au>ZHANG HAIJIAN</au><au>BAI MO</au><au>SHANGGUAN SU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Estimation method and device for beam falling prevention effect</title><date>2020-01-31</date><risdate>2020</risdate><abstract>The invention provides an estimation method and device for a beam falling prevention effect. The estimation method comprises the steps: building a power space calculation model according to a target pier structure; inputting boundary conditions into the power space calculation model, and determining a first parameter model; inputting a collision simulation condition into the first parameter model,and determining a second parameter model; and inputting actual seismic wave data into the second parameter model, and determining the anti-beam-falling effect of the target pier structure. Accordingto the estimation method, the final collision simulation model is determined through three-stage modeling, and the anti-beam-falling effect of actual seismic wave data can be effectively and accurately evaluated.
本发明提供了一种防落梁效果的估计方法及装置,其中该方法包括:根据目标桥墩结构,建立动力空间计算模型;将边界条件输入至所述动力空间计算模型,确定第一参数模型;将碰撞模拟条件输入至所述第一参数模型,确定第二参数模型;将实际地震波数据输入所述第二参数模型,确定所述目标桥墩结构的防落梁效果。本发明通过三阶段建模确定最终的碰撞模拟模型,能够对实际地震波数据的防落梁效果进行有效准确的评估。</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN110737946A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING ELECTRIC DIGITAL DATA PROCESSING PHYSICS |
title | Estimation method and device for beam falling prevention effect |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T05%3A42%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIN%20SEN&rft.date=2020-01-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110737946A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |