Rainy season wet soft roadbed filling construction method
The invention discloses a rainy season wet soft roadbed filling construction method. The method comprises the following steps of S1, soil filling water content testing and quicklime doping amount design; S2, test section construction; S3, material preparation; S4, lower bearing layer treatment; S5,...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | DUAN JIDONG DENG JING YANG HEYUN SUN CHENGHAI YANG BIHUI ZHOU YANGJIA LIU QIAOWAI MA KEYAN PU TONG ZHANG WENLONG MA DIJIANG LI BORUI CHENG SHENGWEI |
description | The invention discloses a rainy season wet soft roadbed filling construction method. The method comprises the following steps of S1, soil filling water content testing and quicklime doping amount design; S2, test section construction; S3, material preparation; S4, lower bearing layer treatment; S5, measurement and lofting; S6, paving; S7, mixing; S8, leveling and light pressing; S9, rolling; S10,maintenance; and S11, later inspection. According to the rainy season wet soft roadbed filling construction method, during the construction, the quality of the subgrade filling can be ensured, the phenomena of subgrade deformation, subgrade bed frost boiling and mud pouring can be reduced, the roadbed construction efficiency can be accelerated, the construction period and cost can be saved, and the construction quality and efficiency of rainy season roadbeds are guaranteed; and meanwhile, the roadbed filling quality is guaranteed, the roadbed filling construction progress is accelerated, the construction site personne |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110424203A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110424203A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110424203A3</originalsourceid><addsrcrecordid>eNrjZLAMSszMq1QoTk0szs9TKE8tUSjOTytRKMpPTElKTVFIy8zJycxLV0jOzysuKSpNLskEqspNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGBiZGJkYGxo7GxKgBAFlcLtw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rainy season wet soft roadbed filling construction method</title><source>esp@cenet</source><creator>DUAN JIDONG ; DENG JING ; YANG HEYUN ; SUN CHENGHAI ; YANG BIHUI ; ZHOU YANGJIA ; LIU QIAOWAI ; MA KEYAN ; PU TONG ; ZHANG WENLONG ; MA DIJIANG ; LI BORUI ; CHENG SHENGWEI</creator><creatorcontrib>DUAN JIDONG ; DENG JING ; YANG HEYUN ; SUN CHENGHAI ; YANG BIHUI ; ZHOU YANGJIA ; LIU QIAOWAI ; MA KEYAN ; PU TONG ; ZHANG WENLONG ; MA DIJIANG ; LI BORUI ; CHENG SHENGWEI</creatorcontrib><description>The invention discloses a rainy season wet soft roadbed filling construction method. The method comprises the following steps of S1, soil filling water content testing and quicklime doping amount design; S2, test section construction; S3, material preparation; S4, lower bearing layer treatment; S5, measurement and lofting; S6, paving; S7, mixing; S8, leveling and light pressing; S9, rolling; S10,maintenance; and S11, later inspection. According to the rainy season wet soft roadbed filling construction method, during the construction, the quality of the subgrade filling can be ensured, the phenomena of subgrade deformation, subgrade bed frost boiling and mud pouring can be reduced, the roadbed construction efficiency can be accelerated, the construction period and cost can be saved, and the construction quality and efficiency of rainy season roadbeds are guaranteed; and meanwhile, the roadbed filling quality is guaranteed, the roadbed filling construction progress is accelerated, the construction site personne</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191108&DB=EPODOC&CC=CN&NR=110424203A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191108&DB=EPODOC&CC=CN&NR=110424203A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DUAN JIDONG</creatorcontrib><creatorcontrib>DENG JING</creatorcontrib><creatorcontrib>YANG HEYUN</creatorcontrib><creatorcontrib>SUN CHENGHAI</creatorcontrib><creatorcontrib>YANG BIHUI</creatorcontrib><creatorcontrib>ZHOU YANGJIA</creatorcontrib><creatorcontrib>LIU QIAOWAI</creatorcontrib><creatorcontrib>MA KEYAN</creatorcontrib><creatorcontrib>PU TONG</creatorcontrib><creatorcontrib>ZHANG WENLONG</creatorcontrib><creatorcontrib>MA DIJIANG</creatorcontrib><creatorcontrib>LI BORUI</creatorcontrib><creatorcontrib>CHENG SHENGWEI</creatorcontrib><title>Rainy season wet soft roadbed filling construction method</title><description>The invention discloses a rainy season wet soft roadbed filling construction method. The method comprises the following steps of S1, soil filling water content testing and quicklime doping amount design; S2, test section construction; S3, material preparation; S4, lower bearing layer treatment; S5, measurement and lofting; S6, paving; S7, mixing; S8, leveling and light pressing; S9, rolling; S10,maintenance; and S11, later inspection. According to the rainy season wet soft roadbed filling construction method, during the construction, the quality of the subgrade filling can be ensured, the phenomena of subgrade deformation, subgrade bed frost boiling and mud pouring can be reduced, the roadbed construction efficiency can be accelerated, the construction period and cost can be saved, and the construction quality and efficiency of rainy season roadbeds are guaranteed; and meanwhile, the roadbed filling quality is guaranteed, the roadbed filling construction progress is accelerated, the construction site personne</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAMSszMq1QoTk0szs9TKE8tUSjOTytRKMpPTElKTVFIy8zJycxLV0jOzysuKSpNLskEqspNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGBiZGJkYGxo7GxKgBAFlcLtw</recordid><startdate>20191108</startdate><enddate>20191108</enddate><creator>DUAN JIDONG</creator><creator>DENG JING</creator><creator>YANG HEYUN</creator><creator>SUN CHENGHAI</creator><creator>YANG BIHUI</creator><creator>ZHOU YANGJIA</creator><creator>LIU QIAOWAI</creator><creator>MA KEYAN</creator><creator>PU TONG</creator><creator>ZHANG WENLONG</creator><creator>MA DIJIANG</creator><creator>LI BORUI</creator><creator>CHENG SHENGWEI</creator><scope>EVB</scope></search><sort><creationdate>20191108</creationdate><title>Rainy season wet soft roadbed filling construction method</title><author>DUAN JIDONG ; DENG JING ; YANG HEYUN ; SUN CHENGHAI ; YANG BIHUI ; ZHOU YANGJIA ; LIU QIAOWAI ; MA KEYAN ; PU TONG ; ZHANG WENLONG ; MA DIJIANG ; LI BORUI ; CHENG SHENGWEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110424203A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>DUAN JIDONG</creatorcontrib><creatorcontrib>DENG JING</creatorcontrib><creatorcontrib>YANG HEYUN</creatorcontrib><creatorcontrib>SUN CHENGHAI</creatorcontrib><creatorcontrib>YANG BIHUI</creatorcontrib><creatorcontrib>ZHOU YANGJIA</creatorcontrib><creatorcontrib>LIU QIAOWAI</creatorcontrib><creatorcontrib>MA KEYAN</creatorcontrib><creatorcontrib>PU TONG</creatorcontrib><creatorcontrib>ZHANG WENLONG</creatorcontrib><creatorcontrib>MA DIJIANG</creatorcontrib><creatorcontrib>LI BORUI</creatorcontrib><creatorcontrib>CHENG SHENGWEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DUAN JIDONG</au><au>DENG JING</au><au>YANG HEYUN</au><au>SUN CHENGHAI</au><au>YANG BIHUI</au><au>ZHOU YANGJIA</au><au>LIU QIAOWAI</au><au>MA KEYAN</au><au>PU TONG</au><au>ZHANG WENLONG</au><au>MA DIJIANG</au><au>LI BORUI</au><au>CHENG SHENGWEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rainy season wet soft roadbed filling construction method</title><date>2019-11-08</date><risdate>2019</risdate><abstract>The invention discloses a rainy season wet soft roadbed filling construction method. The method comprises the following steps of S1, soil filling water content testing and quicklime doping amount design; S2, test section construction; S3, material preparation; S4, lower bearing layer treatment; S5, measurement and lofting; S6, paving; S7, mixing; S8, leveling and light pressing; S9, rolling; S10,maintenance; and S11, later inspection. According to the rainy season wet soft roadbed filling construction method, during the construction, the quality of the subgrade filling can be ensured, the phenomena of subgrade deformation, subgrade bed frost boiling and mud pouring can be reduced, the roadbed construction efficiency can be accelerated, the construction period and cost can be saved, and the construction quality and efficiency of rainy season roadbeds are guaranteed; and meanwhile, the roadbed filling quality is guaranteed, the roadbed filling construction progress is accelerated, the construction site personne</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN110424203A |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE FIXED CONSTRUCTIONS MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR |
title | Rainy season wet soft roadbed filling construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-11T11%3A35%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DUAN%20JIDONG&rft.date=2019-11-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110424203A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |