Gas-steam combined cycle unit synchronous phasing test debugging method

The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam tur...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG ZHANBAO, ZHU PUDE, XIAO FANGJUN, ZHANG MING, FU JUN, DU HONGWEN, PAN KEJIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHENG ZHANBAO
ZHU PUDE
XIAO FANGJUN
ZHANG MING
FU JUN
DU HONGWEN
PAN KEJIAN
description The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110401227A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110401227A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110401227A3</originalsourceid><addsrcrecordid>eNrjZHB3TyzWLS5JTcxVSM7PTcrMS01RSK5MzklVKM3LLFEorsxLzijKz8svLVYoyEgszsxLVyhJLS5RSElNKk1PB3FzU0sy8lN4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoYGJgaGRkbmjMTFqAIchNCc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><source>esp@cenet</source><creator>CHENG ZHANBAO ; ZHU PUDE ; XIAO FANGJUN ; ZHANG MING ; FU JUN ; DU HONGWEN ; PAN KEJIAN</creator><creatorcontrib>CHENG ZHANBAO ; ZHU PUDE ; XIAO FANGJUN ; ZHANG MING ; FU JUN ; DU HONGWEN ; PAN KEJIAN</creatorcontrib><description>The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s</description><language>chi ; eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; MEASURING ; MEASURING ELECTRIC VARIABLES ; MEASURING MAGNETIC VARIABLES ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; TESTING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191101&amp;DB=EPODOC&amp;CC=CN&amp;NR=110401227A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191101&amp;DB=EPODOC&amp;CC=CN&amp;NR=110401227A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHENG ZHANBAO</creatorcontrib><creatorcontrib>ZHU PUDE</creatorcontrib><creatorcontrib>XIAO FANGJUN</creatorcontrib><creatorcontrib>ZHANG MING</creatorcontrib><creatorcontrib>FU JUN</creatorcontrib><creatorcontrib>DU HONGWEN</creatorcontrib><creatorcontrib>PAN KEJIAN</creatorcontrib><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><description>The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>MEASURING</subject><subject>MEASURING ELECTRIC VARIABLES</subject><subject>MEASURING MAGNETIC VARIABLES</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB3TyzWLS5JTcxVSM7PTcrMS01RSK5MzklVKM3LLFEorsxLzijKz8svLVYoyEgszsxLVyhJLS5RSElNKk1PB3FzU0sy8lN4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoYGJgaGRkbmjMTFqAIchNCc</recordid><startdate>20191101</startdate><enddate>20191101</enddate><creator>CHENG ZHANBAO</creator><creator>ZHU PUDE</creator><creator>XIAO FANGJUN</creator><creator>ZHANG MING</creator><creator>FU JUN</creator><creator>DU HONGWEN</creator><creator>PAN KEJIAN</creator><scope>EVB</scope></search><sort><creationdate>20191101</creationdate><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><author>CHENG ZHANBAO ; ZHU PUDE ; XIAO FANGJUN ; ZHANG MING ; FU JUN ; DU HONGWEN ; PAN KEJIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110401227A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>MEASURING</topic><topic>MEASURING ELECTRIC VARIABLES</topic><topic>MEASURING MAGNETIC VARIABLES</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>CHENG ZHANBAO</creatorcontrib><creatorcontrib>ZHU PUDE</creatorcontrib><creatorcontrib>XIAO FANGJUN</creatorcontrib><creatorcontrib>ZHANG MING</creatorcontrib><creatorcontrib>FU JUN</creatorcontrib><creatorcontrib>DU HONGWEN</creatorcontrib><creatorcontrib>PAN KEJIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHENG ZHANBAO</au><au>ZHU PUDE</au><au>XIAO FANGJUN</au><au>ZHANG MING</au><au>FU JUN</au><au>DU HONGWEN</au><au>PAN KEJIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><date>2019-11-01</date><risdate>2019</risdate><abstract>The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN110401227A
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
MEASURING
MEASURING ELECTRIC VARIABLES
MEASURING MAGNETIC VARIABLES
PHYSICS
SYSTEMS FOR STORING ELECTRIC ENERGY
TESTING
title Gas-steam combined cycle unit synchronous phasing test debugging method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T11%3A02%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHENG%20ZHANBAO&rft.date=2019-11-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110401227A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true