Gas-steam combined cycle unit synchronous phasing test debugging method
The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam tur...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHENG ZHANBAO ZHU PUDE XIAO FANGJUN ZHANG MING FU JUN DU HONGWEN PAN KEJIAN |
description | The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110401227A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110401227A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110401227A3</originalsourceid><addsrcrecordid>eNrjZHB3TyzWLS5JTcxVSM7PTcrMS01RSK5MzklVKM3LLFEorsxLzijKz8svLVYoyEgszsxLVyhJLS5RSElNKk1PB3FzU0sy8lN4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoYGJgaGRkbmjMTFqAIchNCc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><source>esp@cenet</source><creator>CHENG ZHANBAO ; ZHU PUDE ; XIAO FANGJUN ; ZHANG MING ; FU JUN ; DU HONGWEN ; PAN KEJIAN</creator><creatorcontrib>CHENG ZHANBAO ; ZHU PUDE ; XIAO FANGJUN ; ZHANG MING ; FU JUN ; DU HONGWEN ; PAN KEJIAN</creatorcontrib><description>The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s</description><language>chi ; eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; MEASURING ; MEASURING ELECTRIC VARIABLES ; MEASURING MAGNETIC VARIABLES ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; TESTING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191101&DB=EPODOC&CC=CN&NR=110401227A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191101&DB=EPODOC&CC=CN&NR=110401227A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHENG ZHANBAO</creatorcontrib><creatorcontrib>ZHU PUDE</creatorcontrib><creatorcontrib>XIAO FANGJUN</creatorcontrib><creatorcontrib>ZHANG MING</creatorcontrib><creatorcontrib>FU JUN</creatorcontrib><creatorcontrib>DU HONGWEN</creatorcontrib><creatorcontrib>PAN KEJIAN</creatorcontrib><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><description>The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>MEASURING</subject><subject>MEASURING ELECTRIC VARIABLES</subject><subject>MEASURING MAGNETIC VARIABLES</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB3TyzWLS5JTcxVSM7PTcrMS01RSK5MzklVKM3LLFEorsxLzijKz8svLVYoyEgszsxLVyhJLS5RSElNKk1PB3FzU0sy8lN4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoYGJgaGRkbmjMTFqAIchNCc</recordid><startdate>20191101</startdate><enddate>20191101</enddate><creator>CHENG ZHANBAO</creator><creator>ZHU PUDE</creator><creator>XIAO FANGJUN</creator><creator>ZHANG MING</creator><creator>FU JUN</creator><creator>DU HONGWEN</creator><creator>PAN KEJIAN</creator><scope>EVB</scope></search><sort><creationdate>20191101</creationdate><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><author>CHENG ZHANBAO ; ZHU PUDE ; XIAO FANGJUN ; ZHANG MING ; FU JUN ; DU HONGWEN ; PAN KEJIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110401227A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>MEASURING</topic><topic>MEASURING ELECTRIC VARIABLES</topic><topic>MEASURING MAGNETIC VARIABLES</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>CHENG ZHANBAO</creatorcontrib><creatorcontrib>ZHU PUDE</creatorcontrib><creatorcontrib>XIAO FANGJUN</creatorcontrib><creatorcontrib>ZHANG MING</creatorcontrib><creatorcontrib>FU JUN</creatorcontrib><creatorcontrib>DU HONGWEN</creatorcontrib><creatorcontrib>PAN KEJIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHENG ZHANBAO</au><au>ZHU PUDE</au><au>XIAO FANGJUN</au><au>ZHANG MING</au><au>FU JUN</au><au>DU HONGWEN</au><au>PAN KEJIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Gas-steam combined cycle unit synchronous phasing test debugging method</title><date>2019-11-01</date><risdate>2019</risdate><abstract>The invention provides a gas-steam combined cycle unit synchronous phasing test debugging method. Before first synchronous grid connection of a gas turbine generator, the gas turbine generator is usedto drive a gas turbine main transformer, a main transformer high-voltage side busbar and a steam turbine main transformer for stepping up from zero voltage; and then, synchronous loop check and phasing test are carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time. The debugging method has a simple operation process, synchronous loop checkand phasing test can be carried out on all synchronous points of the gas turbine generator and the steam turbine generator at one time, the debugging time is greatly shortened, the debugging efficiency is ensured, and the time of the start phase of the whole unit is controllable; the gas consumption of the gas turbine can be saved with many economic benefits; and voltage conduction check is carried out on primary devices s</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN110401227A |
source | esp@cenet |
subjects | CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY GENERATION MEASURING MEASURING ELECTRIC VARIABLES MEASURING MAGNETIC VARIABLES PHYSICS SYSTEMS FOR STORING ELECTRIC ENERGY TESTING |
title | Gas-steam combined cycle unit synchronous phasing test debugging method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T11%3A02%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHENG%20ZHANBAO&rft.date=2019-11-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110401227A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |