Pier and beam asynchronous construction method for hollow thin-wall pier tie beam
The invention discloses a pier and beam asynchronous construction method for a hollow thin-wall pier tie beam. The method comprises the following steps that, i, a chamfer between a pier body and the bottom of the tie beam is constructed when the pier body is constructed to a tie beam section; ii, a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | XIONG ZHIGANG LIN ENCHUAN ZHOU QI CHEN WENPING ZHANG DAPENG LIU YONGMEI YIN ZHIYONG ZHANG XU MA MIN |
description | The invention discloses a pier and beam asynchronous construction method for a hollow thin-wall pier tie beam. The method comprises the following steps that, i, a chamfer between a pier body and the bottom of the tie beam is constructed when the pier body is constructed to a tie beam section; ii, a pier body form is not detached and the pier body is continuously constructed upwards; iii, a prefabricated plate is set up on the chamfer to serve as a construction platform and a bottom mold; and iv, the tie beam is constructed. Aimed at solving the problems that in the case of existing pier body and tie beam construction steps, a pier body tie beam lower section, a pier body tie beam section and tie beam and a pier body tie beam upper section are sequentially constructed upwards layer by layer, compared with pier body construction, tie beam construction is more complex, and then overall construction period is delayed due to the tie beam construction, the pier and beam asynchronous construction method for the holl |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110396937A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110396937A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110396937A3</originalsourceid><addsrcrecordid>eNqNzEEKwjAQQNFsXIh6h_EABUtA6VKK4koU3JcxnZJAOhOSKcXbi-IBXP3N5y3N_RYoA3IPT8IRsLzY-SwsUwEnXDRPToMwjKReehgkg5cYZQb1gasZY4T0MTTQ11ibxYCx0ObXldmeT4_2UlGSjkpCR0zatde63tlm39jD0f7zvAHnxjfJ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pier and beam asynchronous construction method for hollow thin-wall pier tie beam</title><source>esp@cenet</source><creator>XIONG ZHIGANG ; LIN ENCHUAN ; ZHOU QI ; CHEN WENPING ; ZHANG DAPENG ; LIU YONGMEI ; YIN ZHIYONG ; ZHANG XU ; MA MIN</creator><creatorcontrib>XIONG ZHIGANG ; LIN ENCHUAN ; ZHOU QI ; CHEN WENPING ; ZHANG DAPENG ; LIU YONGMEI ; YIN ZHIYONG ; ZHANG XU ; MA MIN</creatorcontrib><description>The invention discloses a pier and beam asynchronous construction method for a hollow thin-wall pier tie beam. The method comprises the following steps that, i, a chamfer between a pier body and the bottom of the tie beam is constructed when the pier body is constructed to a tie beam section; ii, a pier body form is not detached and the pier body is continuously constructed upwards; iii, a prefabricated plate is set up on the chamfer to serve as a construction platform and a bottom mold; and iv, the tie beam is constructed. Aimed at solving the problems that in the case of existing pier body and tie beam construction steps, a pier body tie beam lower section, a pier body tie beam section and tie beam and a pier body tie beam upper section are sequentially constructed upwards layer by layer, compared with pier body construction, tie beam construction is more complex, and then overall construction period is delayed due to the tie beam construction, the pier and beam asynchronous construction method for the holl</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191101&DB=EPODOC&CC=CN&NR=110396937A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191101&DB=EPODOC&CC=CN&NR=110396937A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIONG ZHIGANG</creatorcontrib><creatorcontrib>LIN ENCHUAN</creatorcontrib><creatorcontrib>ZHOU QI</creatorcontrib><creatorcontrib>CHEN WENPING</creatorcontrib><creatorcontrib>ZHANG DAPENG</creatorcontrib><creatorcontrib>LIU YONGMEI</creatorcontrib><creatorcontrib>YIN ZHIYONG</creatorcontrib><creatorcontrib>ZHANG XU</creatorcontrib><creatorcontrib>MA MIN</creatorcontrib><title>Pier and beam asynchronous construction method for hollow thin-wall pier tie beam</title><description>The invention discloses a pier and beam asynchronous construction method for a hollow thin-wall pier tie beam. The method comprises the following steps that, i, a chamfer between a pier body and the bottom of the tie beam is constructed when the pier body is constructed to a tie beam section; ii, a pier body form is not detached and the pier body is continuously constructed upwards; iii, a prefabricated plate is set up on the chamfer to serve as a construction platform and a bottom mold; and iv, the tie beam is constructed. Aimed at solving the problems that in the case of existing pier body and tie beam construction steps, a pier body tie beam lower section, a pier body tie beam section and tie beam and a pier body tie beam upper section are sequentially constructed upwards layer by layer, compared with pier body construction, tie beam construction is more complex, and then overall construction period is delayed due to the tie beam construction, the pier and beam asynchronous construction method for the holl</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzEEKwjAQQNFsXIh6h_EABUtA6VKK4koU3JcxnZJAOhOSKcXbi-IBXP3N5y3N_RYoA3IPT8IRsLzY-SwsUwEnXDRPToMwjKReehgkg5cYZQb1gasZY4T0MTTQ11ibxYCx0ObXldmeT4_2UlGSjkpCR0zatde63tlm39jD0f7zvAHnxjfJ</recordid><startdate>20191101</startdate><enddate>20191101</enddate><creator>XIONG ZHIGANG</creator><creator>LIN ENCHUAN</creator><creator>ZHOU QI</creator><creator>CHEN WENPING</creator><creator>ZHANG DAPENG</creator><creator>LIU YONGMEI</creator><creator>YIN ZHIYONG</creator><creator>ZHANG XU</creator><creator>MA MIN</creator><scope>EVB</scope></search><sort><creationdate>20191101</creationdate><title>Pier and beam asynchronous construction method for hollow thin-wall pier tie beam</title><author>XIONG ZHIGANG ; LIN ENCHUAN ; ZHOU QI ; CHEN WENPING ; ZHANG DAPENG ; LIU YONGMEI ; YIN ZHIYONG ; ZHANG XU ; MA MIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110396937A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>XIONG ZHIGANG</creatorcontrib><creatorcontrib>LIN ENCHUAN</creatorcontrib><creatorcontrib>ZHOU QI</creatorcontrib><creatorcontrib>CHEN WENPING</creatorcontrib><creatorcontrib>ZHANG DAPENG</creatorcontrib><creatorcontrib>LIU YONGMEI</creatorcontrib><creatorcontrib>YIN ZHIYONG</creatorcontrib><creatorcontrib>ZHANG XU</creatorcontrib><creatorcontrib>MA MIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIONG ZHIGANG</au><au>LIN ENCHUAN</au><au>ZHOU QI</au><au>CHEN WENPING</au><au>ZHANG DAPENG</au><au>LIU YONGMEI</au><au>YIN ZHIYONG</au><au>ZHANG XU</au><au>MA MIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pier and beam asynchronous construction method for hollow thin-wall pier tie beam</title><date>2019-11-01</date><risdate>2019</risdate><abstract>The invention discloses a pier and beam asynchronous construction method for a hollow thin-wall pier tie beam. The method comprises the following steps that, i, a chamfer between a pier body and the bottom of the tie beam is constructed when the pier body is constructed to a tie beam section; ii, a pier body form is not detached and the pier body is continuously constructed upwards; iii, a prefabricated plate is set up on the chamfer to serve as a construction platform and a bottom mold; and iv, the tie beam is constructed. Aimed at solving the problems that in the case of existing pier body and tie beam construction steps, a pier body tie beam lower section, a pier body tie beam section and tie beam and a pier body tie beam upper section are sequentially constructed upwards layer by layer, compared with pier body construction, tie beam construction is more complex, and then overall construction period is delayed due to the tie beam construction, the pier and beam asynchronous construction method for the holl</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN110396937A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Pier and beam asynchronous construction method for hollow thin-wall pier tie beam |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-13T20%3A03%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIONG%20ZHIGANG&rft.date=2019-11-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110396937A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |