Construction method of municipal rainwater and sewage separation pipeline

The invention relates to a construction method of a municipal rainwater and sewage separation pipeline. The construction method of the municipal rainwater and sewage separation pipeline comprises thesteps that first, a pipeline trench is excavated; second, a trench foundation pit is supported; third...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG LINGYONG, LUO HONG, ZHUANG LINGXIA, WANG SHUIFA, YANG JIANNAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG LINGYONG
LUO HONG
ZHUANG LINGXIA
WANG SHUIFA
YANG JIANNAN
description The invention relates to a construction method of a municipal rainwater and sewage separation pipeline. The construction method of the municipal rainwater and sewage separation pipeline comprises thesteps that first, a pipeline trench is excavated; second, a trench foundation pit is supported; third, a draining system in the trench is constructed; fourth, a concrete pipeline base is poured; fifth, the rainwater and sewage separation pipeline is mounted; sixth, an intersection of the rainwater and sewage separation pipeline is constructed; seventh, the trench is backfilled and compacted; and eighth, a steel sheet pile is pulled out. The construction method of the municipal rainwater and sewage separation pipeline has the beneficial effects that through a device arranged at a hole mouth toprevent soil from being carried out when the pile is pulled, the situation that the constructed pipeline is damaged due to the fact that too much soil is carried out when the pile is pulled after thetrench is constructed can b
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110306644A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110306644A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110306644A3</originalsourceid><addsrcrecordid>eNqNyzEKwkAQQNFtLES9w3gAISEhvSwRbazsw7CZ6MBmdtidkOsr4gGsXvP_1t18kmJ5CcZJYCZ7pRHSBPMiHFgxQkaWFY0yoIxQaMUnfVDM-H2UlSIL7d1mwljo8HPnjpf-4a8n0jRQUQwkZIO_13XVVF3Xtufmn-YNOSc1TQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of municipal rainwater and sewage separation pipeline</title><source>esp@cenet</source><creator>ZHANG LINGYONG ; LUO HONG ; ZHUANG LINGXIA ; WANG SHUIFA ; YANG JIANNAN</creator><creatorcontrib>ZHANG LINGYONG ; LUO HONG ; ZHUANG LINGXIA ; WANG SHUIFA ; YANG JIANNAN</creatorcontrib><description>The invention relates to a construction method of a municipal rainwater and sewage separation pipeline. The construction method of the municipal rainwater and sewage separation pipeline comprises thesteps that first, a pipeline trench is excavated; second, a trench foundation pit is supported; third, a draining system in the trench is constructed; fourth, a concrete pipeline base is poured; fifth, the rainwater and sewage separation pipeline is mounted; sixth, an intersection of the rainwater and sewage separation pipeline is constructed; seventh, the trench is backfilled and compacted; and eighth, a steel sheet pile is pulled out. The construction method of the municipal rainwater and sewage separation pipeline has the beneficial effects that through a device arranged at a hole mouth toprevent soil from being carried out when the pile is pulled, the situation that the constructed pipeline is damaged due to the fact that too much soil is carried out when the pile is pulled after thetrench is constructed can b</description><language>chi ; eng</language><subject>CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191008&amp;DB=EPODOC&amp;CC=CN&amp;NR=110306644A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191008&amp;DB=EPODOC&amp;CC=CN&amp;NR=110306644A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG LINGYONG</creatorcontrib><creatorcontrib>LUO HONG</creatorcontrib><creatorcontrib>ZHUANG LINGXIA</creatorcontrib><creatorcontrib>WANG SHUIFA</creatorcontrib><creatorcontrib>YANG JIANNAN</creatorcontrib><title>Construction method of municipal rainwater and sewage separation pipeline</title><description>The invention relates to a construction method of a municipal rainwater and sewage separation pipeline. The construction method of the municipal rainwater and sewage separation pipeline comprises thesteps that first, a pipeline trench is excavated; second, a trench foundation pit is supported; third, a draining system in the trench is constructed; fourth, a concrete pipeline base is poured; fifth, the rainwater and sewage separation pipeline is mounted; sixth, an intersection of the rainwater and sewage separation pipeline is constructed; seventh, the trench is backfilled and compacted; and eighth, a steel sheet pile is pulled out. The construction method of the municipal rainwater and sewage separation pipeline has the beneficial effects that through a device arranged at a hole mouth toprevent soil from being carried out when the pile is pulled, the situation that the constructed pipeline is damaged due to the fact that too much soil is carried out when the pile is pulled after thetrench is constructed can b</description><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzEKwkAQQNFtLES9w3gAISEhvSwRbazsw7CZ6MBmdtidkOsr4gGsXvP_1t18kmJ5CcZJYCZ7pRHSBPMiHFgxQkaWFY0yoIxQaMUnfVDM-H2UlSIL7d1mwljo8HPnjpf-4a8n0jRQUQwkZIO_13XVVF3Xtufmn-YNOSc1TQ</recordid><startdate>20191008</startdate><enddate>20191008</enddate><creator>ZHANG LINGYONG</creator><creator>LUO HONG</creator><creator>ZHUANG LINGXIA</creator><creator>WANG SHUIFA</creator><creator>YANG JIANNAN</creator><scope>EVB</scope></search><sort><creationdate>20191008</creationdate><title>Construction method of municipal rainwater and sewage separation pipeline</title><author>ZHANG LINGYONG ; LUO HONG ; ZHUANG LINGXIA ; WANG SHUIFA ; YANG JIANNAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110306644A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG LINGYONG</creatorcontrib><creatorcontrib>LUO HONG</creatorcontrib><creatorcontrib>ZHUANG LINGXIA</creatorcontrib><creatorcontrib>WANG SHUIFA</creatorcontrib><creatorcontrib>YANG JIANNAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG LINGYONG</au><au>LUO HONG</au><au>ZHUANG LINGXIA</au><au>WANG SHUIFA</au><au>YANG JIANNAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of municipal rainwater and sewage separation pipeline</title><date>2019-10-08</date><risdate>2019</risdate><abstract>The invention relates to a construction method of a municipal rainwater and sewage separation pipeline. The construction method of the municipal rainwater and sewage separation pipeline comprises thesteps that first, a pipeline trench is excavated; second, a trench foundation pit is supported; third, a draining system in the trench is constructed; fourth, a concrete pipeline base is poured; fifth, the rainwater and sewage separation pipeline is mounted; sixth, an intersection of the rainwater and sewage separation pipeline is constructed; seventh, the trench is backfilled and compacted; and eighth, a steel sheet pile is pulled out. The construction method of the municipal rainwater and sewage separation pipeline has the beneficial effects that through a device arranged at a hole mouth toprevent soil from being carried out when the pile is pulled, the situation that the constructed pipeline is damaged due to the fact that too much soil is carried out when the pile is pulled after thetrench is constructed can b</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN110306644A
source esp@cenet
subjects CESSPOOLS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SEWERAGE
SEWERS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
WATER SUPPLY
title Construction method of municipal rainwater and sewage separation pipeline
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T22%3A07%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20LINGYONG&rft.date=2019-10-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110306644A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true