Advanced reinforcement construction method of construction of water-rich weak surrounding rock tunnel
The invention relates to an advanced reinforcement construction method of construction of a water-rich weak surrounding rock tunnel. The advanced reinforcement construction method includes the following steps that S1, a contour line is excavated; S2, a tunnel face is sealed and first grouting reinfo...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!