Main tower cross bracing structure and installation method thereof
The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU YONGLING YANG BIBO TU MANMING PI JUNYUN LI XIN CHEN WENSHENG TUO PENG XU QILI LIAO YUAN WANG DONGHUI LIU HONGDA LONG XINGJUN ZHAO WEI SUN GUOGUANG HE QINGBO |
description | The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109629420A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109629420A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109629420A3</originalsourceid><addsrcrecordid>eNqNyjEKwlAMANC_OIh6h3iAQq0idLRFcdHJvcTf1H74JiVJ8fouHsDpLW8ZmhsmBpcPKUQVM3gqxsQvMNc5-qwEyD0kNsec0ZMwvMlH6cFHUpJhHRYDZqPNz1XYXs6P9lrQJB3ZhJGYvGvvu7I-VvWhKk_7f84XcZoyhQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Main tower cross bracing structure and installation method thereof</title><source>esp@cenet</source><creator>LIU YONGLING ; YANG BIBO ; TU MANMING ; PI JUNYUN ; LI XIN ; CHEN WENSHENG ; TUO PENG ; XU QILI ; LIAO YUAN ; WANG DONGHUI ; LIU HONGDA ; LONG XINGJUN ; ZHAO WEI ; SUN GUOGUANG ; HE QINGBO</creator><creatorcontrib>LIU YONGLING ; YANG BIBO ; TU MANMING ; PI JUNYUN ; LI XIN ; CHEN WENSHENG ; TUO PENG ; XU QILI ; LIAO YUAN ; WANG DONGHUI ; LIU HONGDA ; LONG XINGJUN ; ZHAO WEI ; SUN GUOGUANG ; HE QINGBO</creatorcontrib><description>The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190416&DB=EPODOC&CC=CN&NR=109629420A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190416&DB=EPODOC&CC=CN&NR=109629420A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YONGLING</creatorcontrib><creatorcontrib>YANG BIBO</creatorcontrib><creatorcontrib>TU MANMING</creatorcontrib><creatorcontrib>PI JUNYUN</creatorcontrib><creatorcontrib>LI XIN</creatorcontrib><creatorcontrib>CHEN WENSHENG</creatorcontrib><creatorcontrib>TUO PENG</creatorcontrib><creatorcontrib>XU QILI</creatorcontrib><creatorcontrib>LIAO YUAN</creatorcontrib><creatorcontrib>WANG DONGHUI</creatorcontrib><creatorcontrib>LIU HONGDA</creatorcontrib><creatorcontrib>LONG XINGJUN</creatorcontrib><creatorcontrib>ZHAO WEI</creatorcontrib><creatorcontrib>SUN GUOGUANG</creatorcontrib><creatorcontrib>HE QINGBO</creatorcontrib><title>Main tower cross bracing structure and installation method thereof</title><description>The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwlAMANC_OIh6h3iAQq0idLRFcdHJvcTf1H74JiVJ8fouHsDpLW8ZmhsmBpcPKUQVM3gqxsQvMNc5-qwEyD0kNsec0ZMwvMlH6cFHUpJhHRYDZqPNz1XYXs6P9lrQJB3ZhJGYvGvvu7I-VvWhKk_7f84XcZoyhQ</recordid><startdate>20190416</startdate><enddate>20190416</enddate><creator>LIU YONGLING</creator><creator>YANG BIBO</creator><creator>TU MANMING</creator><creator>PI JUNYUN</creator><creator>LI XIN</creator><creator>CHEN WENSHENG</creator><creator>TUO PENG</creator><creator>XU QILI</creator><creator>LIAO YUAN</creator><creator>WANG DONGHUI</creator><creator>LIU HONGDA</creator><creator>LONG XINGJUN</creator><creator>ZHAO WEI</creator><creator>SUN GUOGUANG</creator><creator>HE QINGBO</creator><scope>EVB</scope></search><sort><creationdate>20190416</creationdate><title>Main tower cross bracing structure and installation method thereof</title><author>LIU YONGLING ; YANG BIBO ; TU MANMING ; PI JUNYUN ; LI XIN ; CHEN WENSHENG ; TUO PENG ; XU QILI ; LIAO YUAN ; WANG DONGHUI ; LIU HONGDA ; LONG XINGJUN ; ZHAO WEI ; SUN GUOGUANG ; HE QINGBO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109629420A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YONGLING</creatorcontrib><creatorcontrib>YANG BIBO</creatorcontrib><creatorcontrib>TU MANMING</creatorcontrib><creatorcontrib>PI JUNYUN</creatorcontrib><creatorcontrib>LI XIN</creatorcontrib><creatorcontrib>CHEN WENSHENG</creatorcontrib><creatorcontrib>TUO PENG</creatorcontrib><creatorcontrib>XU QILI</creatorcontrib><creatorcontrib>LIAO YUAN</creatorcontrib><creatorcontrib>WANG DONGHUI</creatorcontrib><creatorcontrib>LIU HONGDA</creatorcontrib><creatorcontrib>LONG XINGJUN</creatorcontrib><creatorcontrib>ZHAO WEI</creatorcontrib><creatorcontrib>SUN GUOGUANG</creatorcontrib><creatorcontrib>HE QINGBO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YONGLING</au><au>YANG BIBO</au><au>TU MANMING</au><au>PI JUNYUN</au><au>LI XIN</au><au>CHEN WENSHENG</au><au>TUO PENG</au><au>XU QILI</au><au>LIAO YUAN</au><au>WANG DONGHUI</au><au>LIU HONGDA</au><au>LONG XINGJUN</au><au>ZHAO WEI</au><au>SUN GUOGUANG</au><au>HE QINGBO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Main tower cross bracing structure and installation method thereof</title><date>2019-04-16</date><risdate>2019</risdate><abstract>The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN109629420A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Main tower cross bracing structure and installation method thereof |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T02%3A25%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YONGLING&rft.date=2019-04-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109629420A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |