Main tower cross bracing structure and installation method thereof

The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU YONGLING, YANG BIBO, TU MANMING, PI JUNYUN, LI XIN, CHEN WENSHENG, TUO PENG, XU QILI, LIAO YUAN, WANG DONGHUI, LIU HONGDA, LONG XINGJUN, ZHAO WEI, SUN GUOGUANG, HE QINGBO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU YONGLING
YANG BIBO
TU MANMING
PI JUNYUN
LI XIN
CHEN WENSHENG
TUO PENG
XU QILI
LIAO YUAN
WANG DONGHUI
LIU HONGDA
LONG XINGJUN
ZHAO WEI
SUN GUOGUANG
HE QINGBO
description The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109629420A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109629420A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109629420A3</originalsourceid><addsrcrecordid>eNqNyjEKwlAMANC_OIh6h3iAQq0idLRFcdHJvcTf1H74JiVJ8fouHsDpLW8ZmhsmBpcPKUQVM3gqxsQvMNc5-qwEyD0kNsec0ZMwvMlH6cFHUpJhHRYDZqPNz1XYXs6P9lrQJB3ZhJGYvGvvu7I-VvWhKk_7f84XcZoyhQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Main tower cross bracing structure and installation method thereof</title><source>esp@cenet</source><creator>LIU YONGLING ; YANG BIBO ; TU MANMING ; PI JUNYUN ; LI XIN ; CHEN WENSHENG ; TUO PENG ; XU QILI ; LIAO YUAN ; WANG DONGHUI ; LIU HONGDA ; LONG XINGJUN ; ZHAO WEI ; SUN GUOGUANG ; HE QINGBO</creator><creatorcontrib>LIU YONGLING ; YANG BIBO ; TU MANMING ; PI JUNYUN ; LI XIN ; CHEN WENSHENG ; TUO PENG ; XU QILI ; LIAO YUAN ; WANG DONGHUI ; LIU HONGDA ; LONG XINGJUN ; ZHAO WEI ; SUN GUOGUANG ; HE QINGBO</creatorcontrib><description>The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190416&amp;DB=EPODOC&amp;CC=CN&amp;NR=109629420A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190416&amp;DB=EPODOC&amp;CC=CN&amp;NR=109629420A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YONGLING</creatorcontrib><creatorcontrib>YANG BIBO</creatorcontrib><creatorcontrib>TU MANMING</creatorcontrib><creatorcontrib>PI JUNYUN</creatorcontrib><creatorcontrib>LI XIN</creatorcontrib><creatorcontrib>CHEN WENSHENG</creatorcontrib><creatorcontrib>TUO PENG</creatorcontrib><creatorcontrib>XU QILI</creatorcontrib><creatorcontrib>LIAO YUAN</creatorcontrib><creatorcontrib>WANG DONGHUI</creatorcontrib><creatorcontrib>LIU HONGDA</creatorcontrib><creatorcontrib>LONG XINGJUN</creatorcontrib><creatorcontrib>ZHAO WEI</creatorcontrib><creatorcontrib>SUN GUOGUANG</creatorcontrib><creatorcontrib>HE QINGBO</creatorcontrib><title>Main tower cross bracing structure and installation method thereof</title><description>The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwlAMANC_OIh6h3iAQq0idLRFcdHJvcTf1H74JiVJ8fouHsDpLW8ZmhsmBpcPKUQVM3gqxsQvMNc5-qwEyD0kNsec0ZMwvMlH6cFHUpJhHRYDZqPNz1XYXs6P9lrQJB3ZhJGYvGvvu7I-VvWhKk_7f84XcZoyhQ</recordid><startdate>20190416</startdate><enddate>20190416</enddate><creator>LIU YONGLING</creator><creator>YANG BIBO</creator><creator>TU MANMING</creator><creator>PI JUNYUN</creator><creator>LI XIN</creator><creator>CHEN WENSHENG</creator><creator>TUO PENG</creator><creator>XU QILI</creator><creator>LIAO YUAN</creator><creator>WANG DONGHUI</creator><creator>LIU HONGDA</creator><creator>LONG XINGJUN</creator><creator>ZHAO WEI</creator><creator>SUN GUOGUANG</creator><creator>HE QINGBO</creator><scope>EVB</scope></search><sort><creationdate>20190416</creationdate><title>Main tower cross bracing structure and installation method thereof</title><author>LIU YONGLING ; YANG BIBO ; TU MANMING ; PI JUNYUN ; LI XIN ; CHEN WENSHENG ; TUO PENG ; XU QILI ; LIAO YUAN ; WANG DONGHUI ; LIU HONGDA ; LONG XINGJUN ; ZHAO WEI ; SUN GUOGUANG ; HE QINGBO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109629420A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YONGLING</creatorcontrib><creatorcontrib>YANG BIBO</creatorcontrib><creatorcontrib>TU MANMING</creatorcontrib><creatorcontrib>PI JUNYUN</creatorcontrib><creatorcontrib>LI XIN</creatorcontrib><creatorcontrib>CHEN WENSHENG</creatorcontrib><creatorcontrib>TUO PENG</creatorcontrib><creatorcontrib>XU QILI</creatorcontrib><creatorcontrib>LIAO YUAN</creatorcontrib><creatorcontrib>WANG DONGHUI</creatorcontrib><creatorcontrib>LIU HONGDA</creatorcontrib><creatorcontrib>LONG XINGJUN</creatorcontrib><creatorcontrib>ZHAO WEI</creatorcontrib><creatorcontrib>SUN GUOGUANG</creatorcontrib><creatorcontrib>HE QINGBO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YONGLING</au><au>YANG BIBO</au><au>TU MANMING</au><au>PI JUNYUN</au><au>LI XIN</au><au>CHEN WENSHENG</au><au>TUO PENG</au><au>XU QILI</au><au>LIAO YUAN</au><au>WANG DONGHUI</au><au>LIU HONGDA</au><au>LONG XINGJUN</au><au>ZHAO WEI</au><au>SUN GUOGUANG</au><au>HE QINGBO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Main tower cross bracing structure and installation method thereof</title><date>2019-04-16</date><risdate>2019</risdate><abstract>The invention discloses a main tower cross bracing structure and an installation method thereof, and relates to the field of bridge construction. The method comprises the steps that a cross bracing structure is prefabricated and processed; a cross bracing operation platform and a cross bracing edge fulcrum structure are installed; a tower crane entirely lifts a cross bracing truss to an edge fulcrum, and the edge fulcrum is tensioned and mudjacked; a cross bracing connecting system is installed. The installation method of the main tower cross bracing uses industrialized pre-assembly pieces andis high in precision, the tower crane can be adopted to perform vertical lifting during entire installation, after the cross bracing truss passes through a tower body anchor bed, a pin shaft is adopted for connection, the installation is fast and convenient, and the high-altitude construction risk is reduced; compared with a traditional steel pipe support, the input of on-site mechanical equipment and auxiliary structure</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN109629420A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Main tower cross bracing structure and installation method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T02%3A25%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YONGLING&rft.date=2019-04-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109629420A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true