Track-type iron tower translation construction method

The invention discloses a track-type iron tower translation construction method. The track-type iron tower translation construction method comprises the steps that a iron tower is assembled under theline by leveling and tamping a temporary tower position point, and a temporary track between the temp...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XU LI, XU XUDONG, ZHENG CUNBO, CHEN ZHE, HUANG ZHIQING, CHI CHAOFAN, CHEN ZHENGYUAN, QIAN CHENGLEI, FENG WEI, ZHOU JIE, HUANG BO, CHEN CHANGLONG, XU XIANGDONG, JI KELANG, ZHANG ZHIJUN, LIU CHANG, LIN ZHENLIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a track-type iron tower translation construction method. The track-type iron tower translation construction method comprises the steps that a iron tower is assembled under theline by leveling and tamping a temporary tower position point, and a temporary track between the temporary tower position and the tower position is built after a tower is erected through a lifting machine; a clamp is installed on a tower foot to realize the smooth movement on a rail, the iron tower is pulled to move by a winching machine, and the iron tower is fixed and supported by the multi-angle traction of a steel wire rope to keep the iron tower upright; and the iron tower is prevented from dumping during the movement, and the iron tower is lifted through a jack after moving to the towerposition, the clamp and the track are removed, the iron tower is lowered to the tower position. The whole process is quick, the engineering construction is easy, engineering accidents are reduced as much as possible, and the h