Construction method of double-limb thin-walled pier of bridge

The invention relates to a construction method of a double-limb thin-wall pier of a bridge and mainly aims at solving the problem of slow construction speed in prior construction of the two-limb thin-wall pier of the bridge. The method comprises the following steps of: pier body reinforcement instal...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CUI ZHICHENG, LIU FUCHUN, QUAN ZONGKUN, SI WEIFENG, WANG DONGMING, BAI JUNCAI, LI RUNSHUANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CUI ZHICHENG
LIU FUCHUN
QUAN ZONGKUN
SI WEIFENG
WANG DONGMING
BAI JUNCAI
LI RUNSHUANG
description The invention relates to a construction method of a double-limb thin-wall pier of a bridge and mainly aims at solving the problem of slow construction speed in prior construction of the two-limb thin-wall pier of the bridge. The method comprises the following steps of: pier body reinforcement installation: wherein, the root part of the pier body main reinforcement extends into a cap part, straightthread rolling is carried out on a connecting end of the main reinforcement in a ground processing site by using a heading machine, a sleeve is connected with the threaded connecting end; rollover formwork assembly: wherein, the formworks is raised by using a tower crane, and the horizontal joint and vertical joint of the internal and external formworks are made into flat joints. Rubber stop grout is filled during installation; installation of internal and external operation platforms and a protection system; pier body concrete is lifted and put into the formworks, manual vibration is carriedout by using a plug-in vi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109356030A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109356030A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109356030A3</originalsourceid><addsrcrecordid>eNrjZLB1zs8rLikqTS7JzM9TyE0tychPUchPU0jJL03KSdXNycxNUijJyMzTLU_MyUlNUSjITC0CyScVZaakp_IwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0MDS2NTMwNjA0djYtQAABeiL_I</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of double-limb thin-walled pier of bridge</title><source>esp@cenet</source><creator>CUI ZHICHENG ; LIU FUCHUN ; QUAN ZONGKUN ; SI WEIFENG ; WANG DONGMING ; BAI JUNCAI ; LI RUNSHUANG</creator><creatorcontrib>CUI ZHICHENG ; LIU FUCHUN ; QUAN ZONGKUN ; SI WEIFENG ; WANG DONGMING ; BAI JUNCAI ; LI RUNSHUANG</creatorcontrib><description>The invention relates to a construction method of a double-limb thin-wall pier of a bridge and mainly aims at solving the problem of slow construction speed in prior construction of the two-limb thin-wall pier of the bridge. The method comprises the following steps of: pier body reinforcement installation: wherein, the root part of the pier body main reinforcement extends into a cap part, straightthread rolling is carried out on a connecting end of the main reinforcement in a ground processing site by using a heading machine, a sleeve is connected with the threaded connecting end; rollover formwork assembly: wherein, the formworks is raised by using a tower crane, and the horizontal joint and vertical joint of the internal and external formworks are made into flat joints. Rubber stop grout is filled during installation; installation of internal and external operation platforms and a protection system; pier body concrete is lifted and put into the formworks, manual vibration is carriedout by using a plug-in vi</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190219&amp;DB=EPODOC&amp;CC=CN&amp;NR=109356030A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190219&amp;DB=EPODOC&amp;CC=CN&amp;NR=109356030A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CUI ZHICHENG</creatorcontrib><creatorcontrib>LIU FUCHUN</creatorcontrib><creatorcontrib>QUAN ZONGKUN</creatorcontrib><creatorcontrib>SI WEIFENG</creatorcontrib><creatorcontrib>WANG DONGMING</creatorcontrib><creatorcontrib>BAI JUNCAI</creatorcontrib><creatorcontrib>LI RUNSHUANG</creatorcontrib><title>Construction method of double-limb thin-walled pier of bridge</title><description>The invention relates to a construction method of a double-limb thin-wall pier of a bridge and mainly aims at solving the problem of slow construction speed in prior construction of the two-limb thin-wall pier of the bridge. The method comprises the following steps of: pier body reinforcement installation: wherein, the root part of the pier body main reinforcement extends into a cap part, straightthread rolling is carried out on a connecting end of the main reinforcement in a ground processing site by using a heading machine, a sleeve is connected with the threaded connecting end; rollover formwork assembly: wherein, the formworks is raised by using a tower crane, and the horizontal joint and vertical joint of the internal and external formworks are made into flat joints. Rubber stop grout is filled during installation; installation of internal and external operation platforms and a protection system; pier body concrete is lifted and put into the formworks, manual vibration is carriedout by using a plug-in vi</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB1zs8rLikqTS7JzM9TyE0tychPUchPU0jJL03KSdXNycxNUijJyMzTLU_MyUlNUSjITC0CyScVZaakp_IwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0MDS2NTMwNjA0djYtQAABeiL_I</recordid><startdate>20190219</startdate><enddate>20190219</enddate><creator>CUI ZHICHENG</creator><creator>LIU FUCHUN</creator><creator>QUAN ZONGKUN</creator><creator>SI WEIFENG</creator><creator>WANG DONGMING</creator><creator>BAI JUNCAI</creator><creator>LI RUNSHUANG</creator><scope>EVB</scope></search><sort><creationdate>20190219</creationdate><title>Construction method of double-limb thin-walled pier of bridge</title><author>CUI ZHICHENG ; LIU FUCHUN ; QUAN ZONGKUN ; SI WEIFENG ; WANG DONGMING ; BAI JUNCAI ; LI RUNSHUANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109356030A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>CUI ZHICHENG</creatorcontrib><creatorcontrib>LIU FUCHUN</creatorcontrib><creatorcontrib>QUAN ZONGKUN</creatorcontrib><creatorcontrib>SI WEIFENG</creatorcontrib><creatorcontrib>WANG DONGMING</creatorcontrib><creatorcontrib>BAI JUNCAI</creatorcontrib><creatorcontrib>LI RUNSHUANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CUI ZHICHENG</au><au>LIU FUCHUN</au><au>QUAN ZONGKUN</au><au>SI WEIFENG</au><au>WANG DONGMING</au><au>BAI JUNCAI</au><au>LI RUNSHUANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of double-limb thin-walled pier of bridge</title><date>2019-02-19</date><risdate>2019</risdate><abstract>The invention relates to a construction method of a double-limb thin-wall pier of a bridge and mainly aims at solving the problem of slow construction speed in prior construction of the two-limb thin-wall pier of the bridge. The method comprises the following steps of: pier body reinforcement installation: wherein, the root part of the pier body main reinforcement extends into a cap part, straightthread rolling is carried out on a connecting end of the main reinforcement in a ground processing site by using a heading machine, a sleeve is connected with the threaded connecting end; rollover formwork assembly: wherein, the formworks is raised by using a tower crane, and the horizontal joint and vertical joint of the internal and external formworks are made into flat joints. Rubber stop grout is filled during installation; installation of internal and external operation platforms and a protection system; pier body concrete is lifted and put into the formworks, manual vibration is carriedout by using a plug-in vi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN109356030A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Construction method of double-limb thin-walled pier of bridge
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-10T03%3A31%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CUI%20ZHICHENG&rft.date=2019-02-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109356030A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true