Dam overflow weir crest cover mold and construction method

The invention provides a dam overflow weir crest cover mold and a construction method. The dam overflow weir crest cover mold comprises a steel pipe and a steel form which are arranged in a layered mode from top to bottom; the steel form is of a curved structure and formed by assembling a plurality...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: YIN GAOYUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YIN GAOYUN
description The invention provides a dam overflow weir crest cover mold and a construction method. The dam overflow weir crest cover mold comprises a steel pipe and a steel form which are arranged in a layered mode from top to bottom; the steel form is of a curved structure and formed by assembling a plurality of unit molds; a plurality of pairs of first outer keel structures perpendicular to the steel pipe are arranged on the upper side of the steel pipe and arranged at equal intervals; each pair of first outer keel structures are connected together oppositely in a spot welding mode; each pair of first outer keel structures are welded with the steel pipe; a plurality of second outer keel structures vertically intersecting with the first outer keel structures are arranged on the upper layers of the first outer keel structures; and the second outer keel structures are arranged at equal intervals and welded to the first outer keel structures. The construction method comprises the steps of S1, pretreatment, S2, rebar erecti
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109322287A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109322287A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109322287A3</originalsourceid><addsrcrecordid>eNrjZLByScxVyC9LLUrLyS9XKE_NLFJILkotLlFIBgkq5ObnpCgk5qUAuXnFJUWlySWZ-XkKuaklGfkpPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0MDS2MjIyMLc0ZgYNQB9fy8t</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Dam overflow weir crest cover mold and construction method</title><source>esp@cenet</source><creator>YIN GAOYUN</creator><creatorcontrib>YIN GAOYUN</creatorcontrib><description>The invention provides a dam overflow weir crest cover mold and a construction method. The dam overflow weir crest cover mold comprises a steel pipe and a steel form which are arranged in a layered mode from top to bottom; the steel form is of a curved structure and formed by assembling a plurality of unit molds; a plurality of pairs of first outer keel structures perpendicular to the steel pipe are arranged on the upper side of the steel pipe and arranged at equal intervals; each pair of first outer keel structures are connected together oppositely in a spot welding mode; each pair of first outer keel structures are welded with the steel pipe; a plurality of second outer keel structures vertically intersecting with the first outer keel structures are arranged on the upper layers of the first outer keel structures; and the second outer keel structures are arranged at equal intervals and welded to the first outer keel structures. The construction method comprises the steps of S1, pretreatment, S2, rebar erecti</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190212&amp;DB=EPODOC&amp;CC=CN&amp;NR=109322287A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190212&amp;DB=EPODOC&amp;CC=CN&amp;NR=109322287A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YIN GAOYUN</creatorcontrib><title>Dam overflow weir crest cover mold and construction method</title><description>The invention provides a dam overflow weir crest cover mold and a construction method. The dam overflow weir crest cover mold comprises a steel pipe and a steel form which are arranged in a layered mode from top to bottom; the steel form is of a curved structure and formed by assembling a plurality of unit molds; a plurality of pairs of first outer keel structures perpendicular to the steel pipe are arranged on the upper side of the steel pipe and arranged at equal intervals; each pair of first outer keel structures are connected together oppositely in a spot welding mode; each pair of first outer keel structures are welded with the steel pipe; a plurality of second outer keel structures vertically intersecting with the first outer keel structures are arranged on the upper layers of the first outer keel structures; and the second outer keel structures are arranged at equal intervals and welded to the first outer keel structures. The construction method comprises the steps of S1, pretreatment, S2, rebar erecti</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLByScxVyC9LLUrLyS9XKE_NLFJILkotLlFIBgkq5ObnpCgk5qUAuXnFJUWlySWZ-XkKuaklGfkpPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0MDS2MjIyMLc0ZgYNQB9fy8t</recordid><startdate>20190212</startdate><enddate>20190212</enddate><creator>YIN GAOYUN</creator><scope>EVB</scope></search><sort><creationdate>20190212</creationdate><title>Dam overflow weir crest cover mold and construction method</title><author>YIN GAOYUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109322287A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YIN GAOYUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YIN GAOYUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Dam overflow weir crest cover mold and construction method</title><date>2019-02-12</date><risdate>2019</risdate><abstract>The invention provides a dam overflow weir crest cover mold and a construction method. The dam overflow weir crest cover mold comprises a steel pipe and a steel form which are arranged in a layered mode from top to bottom; the steel form is of a curved structure and formed by assembling a plurality of unit molds; a plurality of pairs of first outer keel structures perpendicular to the steel pipe are arranged on the upper side of the steel pipe and arranged at equal intervals; each pair of first outer keel structures are connected together oppositely in a spot welding mode; each pair of first outer keel structures are welded with the steel pipe; a plurality of second outer keel structures vertically intersecting with the first outer keel structures are arranged on the upper layers of the first outer keel structures; and the second outer keel structures are arranged at equal intervals and welded to the first outer keel structures. The construction method comprises the steps of S1, pretreatment, S2, rebar erecti</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN109322287A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Dam overflow weir crest cover mold and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T20%3A53%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YIN%20GAOYUN&rft.date=2019-02-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109322287A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true