The invention relates to a dual-path adaptive load forecasting method for a substation supply area

The invention discloses a dual-path adaptive load forecasting method for a substation supply area. Due to the rapid change of grid structure in power network planning, it is often difficult to forecast the load of the upper and lower power supply areas. The invention adopts dual-path adaptive load f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHANG AN, YU DAN, WU JUN, LYU YUN, SHI JINPING, NIU WEI, DAN YANGQING, ZHANG MINJIE, LI CHUN, CAI YOUYOU, ZHANG DAIHONG, WANG XIRAN, CHEN XUYANG, WANG TINGTING, WENG HUA, LIU LINPING, HU ZHESHENG, SHEN SHUYI, FENG WEI, LI FAN, ZHOU HAIBO, ZHOU LIN, HE DONG, HE YINGJING, LI QING, LAI CONG, TANG REN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHANG AN
YU DAN
WU JUN
LYU YUN
SHI JINPING
NIU WEI
DAN YANGQING
ZHANG MINJIE
LI CHUN
CAI YOUYOU
ZHANG DAIHONG
WANG XIRAN
CHEN XUYANG
WANG TINGTING
WENG HUA
LIU LINPING
HU ZHESHENG
SHEN SHUYI
FENG WEI
LI FAN
ZHOU HAIBO
ZHOU LIN
HE DONG
HE YINGJING
LI QING
LAI CONG
TANG REN
description The invention discloses a dual-path adaptive load forecasting method for a substation supply area. Due to the rapid change of grid structure in power network planning, it is often difficult to forecast the load of the upper and lower power supply areas. The invention adopts dual-path adaptive load forecasting compatible with top-level planning forecasting and bottom-level network self-checking. Atthe same time, the improved firefly algorithm and U-type self-calibration method are used to correlate the load status hierarchically. Combining the advantages of top-down and bottom-up load forecasting and distribution methods, the forecasting results are modified. The invention adopts two paths of load forecasting, distribution, checking and difference feedback back to the top layer for re-distribution, such as high-voltage distribution network supply area upward aggregation after self-forecasting and regional macro-forecasting downward distribution. After iteration, the error is smaller than the threshold value, a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109242191A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109242191A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109242191A3</originalsourceid><addsrcrecordid>eNqNjDEKwkAQRdNYiHqH8QABE21ShqBYWaUPk-THXVh3l51JwNsrwQNYfXi897dZ3xqQ9Qu82uApwbFCSAMxjTO7PLIa4pGj2gXkAo80hYSBRa1_0gtqwoq-gcy9KK9HMsfo3sQJvM82EzvB4be77Hi7ts09RwwdJPIAD-2aR3GqyktZVEV9_sf5ADdmPfA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>The invention relates to a dual-path adaptive load forecasting method for a substation supply area</title><source>esp@cenet</source><creator>CHANG AN ; YU DAN ; WU JUN ; LYU YUN ; SHI JINPING ; NIU WEI ; DAN YANGQING ; ZHANG MINJIE ; LI CHUN ; CAI YOUYOU ; ZHANG DAIHONG ; WANG XIRAN ; CHEN XUYANG ; WANG TINGTING ; WENG HUA ; LIU LINPING ; HU ZHESHENG ; SHEN SHUYI ; FENG WEI ; LI FAN ; ZHOU HAIBO ; ZHOU LIN ; HE DONG ; HE YINGJING ; LI QING ; LAI CONG ; TANG REN</creator><creatorcontrib>CHANG AN ; YU DAN ; WU JUN ; LYU YUN ; SHI JINPING ; NIU WEI ; DAN YANGQING ; ZHANG MINJIE ; LI CHUN ; CAI YOUYOU ; ZHANG DAIHONG ; WANG XIRAN ; CHEN XUYANG ; WANG TINGTING ; WENG HUA ; LIU LINPING ; HU ZHESHENG ; SHEN SHUYI ; FENG WEI ; LI FAN ; ZHOU HAIBO ; ZHOU LIN ; HE DONG ; HE YINGJING ; LI QING ; LAI CONG ; TANG REN</creatorcontrib><description>The invention discloses a dual-path adaptive load forecasting method for a substation supply area. Due to the rapid change of grid structure in power network planning, it is often difficult to forecast the load of the upper and lower power supply areas. The invention adopts dual-path adaptive load forecasting compatible with top-level planning forecasting and bottom-level network self-checking. Atthe same time, the improved firefly algorithm and U-type self-calibration method are used to correlate the load status hierarchically. Combining the advantages of top-down and bottom-up load forecasting and distribution methods, the forecasting results are modified. The invention adopts two paths of load forecasting, distribution, checking and difference feedback back to the top layer for re-distribution, such as high-voltage distribution network supply area upward aggregation after self-forecasting and regional macro-forecasting downward distribution. After iteration, the error is smaller than the threshold value, a</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190118&amp;DB=EPODOC&amp;CC=CN&amp;NR=109242191A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190118&amp;DB=EPODOC&amp;CC=CN&amp;NR=109242191A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHANG AN</creatorcontrib><creatorcontrib>YU DAN</creatorcontrib><creatorcontrib>WU JUN</creatorcontrib><creatorcontrib>LYU YUN</creatorcontrib><creatorcontrib>SHI JINPING</creatorcontrib><creatorcontrib>NIU WEI</creatorcontrib><creatorcontrib>DAN YANGQING</creatorcontrib><creatorcontrib>ZHANG MINJIE</creatorcontrib><creatorcontrib>LI CHUN</creatorcontrib><creatorcontrib>CAI YOUYOU</creatorcontrib><creatorcontrib>ZHANG DAIHONG</creatorcontrib><creatorcontrib>WANG XIRAN</creatorcontrib><creatorcontrib>CHEN XUYANG</creatorcontrib><creatorcontrib>WANG TINGTING</creatorcontrib><creatorcontrib>WENG HUA</creatorcontrib><creatorcontrib>LIU LINPING</creatorcontrib><creatorcontrib>HU ZHESHENG</creatorcontrib><creatorcontrib>SHEN SHUYI</creatorcontrib><creatorcontrib>FENG WEI</creatorcontrib><creatorcontrib>LI FAN</creatorcontrib><creatorcontrib>ZHOU HAIBO</creatorcontrib><creatorcontrib>ZHOU LIN</creatorcontrib><creatorcontrib>HE DONG</creatorcontrib><creatorcontrib>HE YINGJING</creatorcontrib><creatorcontrib>LI QING</creatorcontrib><creatorcontrib>LAI CONG</creatorcontrib><creatorcontrib>TANG REN</creatorcontrib><title>The invention relates to a dual-path adaptive load forecasting method for a substation supply area</title><description>The invention discloses a dual-path adaptive load forecasting method for a substation supply area. Due to the rapid change of grid structure in power network planning, it is often difficult to forecast the load of the upper and lower power supply areas. The invention adopts dual-path adaptive load forecasting compatible with top-level planning forecasting and bottom-level network self-checking. Atthe same time, the improved firefly algorithm and U-type self-calibration method are used to correlate the load status hierarchically. Combining the advantages of top-down and bottom-up load forecasting and distribution methods, the forecasting results are modified. The invention adopts two paths of load forecasting, distribution, checking and difference feedback back to the top layer for re-distribution, such as high-voltage distribution network supply area upward aggregation after self-forecasting and regional macro-forecasting downward distribution. After iteration, the error is smaller than the threshold value, a</description><subject>CALCULATING</subject><subject>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEKwkAQRdNYiHqH8QABE21ShqBYWaUPk-THXVh3l51JwNsrwQNYfXi897dZ3xqQ9Qu82uApwbFCSAMxjTO7PLIa4pGj2gXkAo80hYSBRa1_0gtqwoq-gcy9KK9HMsfo3sQJvM82EzvB4be77Hi7ts09RwwdJPIAD-2aR3GqyktZVEV9_sf5ADdmPfA</recordid><startdate>20190118</startdate><enddate>20190118</enddate><creator>CHANG AN</creator><creator>YU DAN</creator><creator>WU JUN</creator><creator>LYU YUN</creator><creator>SHI JINPING</creator><creator>NIU WEI</creator><creator>DAN YANGQING</creator><creator>ZHANG MINJIE</creator><creator>LI CHUN</creator><creator>CAI YOUYOU</creator><creator>ZHANG DAIHONG</creator><creator>WANG XIRAN</creator><creator>CHEN XUYANG</creator><creator>WANG TINGTING</creator><creator>WENG HUA</creator><creator>LIU LINPING</creator><creator>HU ZHESHENG</creator><creator>SHEN SHUYI</creator><creator>FENG WEI</creator><creator>LI FAN</creator><creator>ZHOU HAIBO</creator><creator>ZHOU LIN</creator><creator>HE DONG</creator><creator>HE YINGJING</creator><creator>LI QING</creator><creator>LAI CONG</creator><creator>TANG REN</creator><scope>EVB</scope></search><sort><creationdate>20190118</creationdate><title>The invention relates to a dual-path adaptive load forecasting method for a substation supply area</title><author>CHANG AN ; YU DAN ; WU JUN ; LYU YUN ; SHI JINPING ; NIU WEI ; DAN YANGQING ; ZHANG MINJIE ; LI CHUN ; CAI YOUYOU ; ZHANG DAIHONG ; WANG XIRAN ; CHEN XUYANG ; WANG TINGTING ; WENG HUA ; LIU LINPING ; HU ZHESHENG ; SHEN SHUYI ; FENG WEI ; LI FAN ; ZHOU HAIBO ; ZHOU LIN ; HE DONG ; HE YINGJING ; LI QING ; LAI CONG ; TANG REN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109242191A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>CALCULATING</topic><topic>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>CHANG AN</creatorcontrib><creatorcontrib>YU DAN</creatorcontrib><creatorcontrib>WU JUN</creatorcontrib><creatorcontrib>LYU YUN</creatorcontrib><creatorcontrib>SHI JINPING</creatorcontrib><creatorcontrib>NIU WEI</creatorcontrib><creatorcontrib>DAN YANGQING</creatorcontrib><creatorcontrib>ZHANG MINJIE</creatorcontrib><creatorcontrib>LI CHUN</creatorcontrib><creatorcontrib>CAI YOUYOU</creatorcontrib><creatorcontrib>ZHANG DAIHONG</creatorcontrib><creatorcontrib>WANG XIRAN</creatorcontrib><creatorcontrib>CHEN XUYANG</creatorcontrib><creatorcontrib>WANG TINGTING</creatorcontrib><creatorcontrib>WENG HUA</creatorcontrib><creatorcontrib>LIU LINPING</creatorcontrib><creatorcontrib>HU ZHESHENG</creatorcontrib><creatorcontrib>SHEN SHUYI</creatorcontrib><creatorcontrib>FENG WEI</creatorcontrib><creatorcontrib>LI FAN</creatorcontrib><creatorcontrib>ZHOU HAIBO</creatorcontrib><creatorcontrib>ZHOU LIN</creatorcontrib><creatorcontrib>HE DONG</creatorcontrib><creatorcontrib>HE YINGJING</creatorcontrib><creatorcontrib>LI QING</creatorcontrib><creatorcontrib>LAI CONG</creatorcontrib><creatorcontrib>TANG REN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHANG AN</au><au>YU DAN</au><au>WU JUN</au><au>LYU YUN</au><au>SHI JINPING</au><au>NIU WEI</au><au>DAN YANGQING</au><au>ZHANG MINJIE</au><au>LI CHUN</au><au>CAI YOUYOU</au><au>ZHANG DAIHONG</au><au>WANG XIRAN</au><au>CHEN XUYANG</au><au>WANG TINGTING</au><au>WENG HUA</au><au>LIU LINPING</au><au>HU ZHESHENG</au><au>SHEN SHUYI</au><au>FENG WEI</au><au>LI FAN</au><au>ZHOU HAIBO</au><au>ZHOU LIN</au><au>HE DONG</au><au>HE YINGJING</au><au>LI QING</au><au>LAI CONG</au><au>TANG REN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>The invention relates to a dual-path adaptive load forecasting method for a substation supply area</title><date>2019-01-18</date><risdate>2019</risdate><abstract>The invention discloses a dual-path adaptive load forecasting method for a substation supply area. Due to the rapid change of grid structure in power network planning, it is often difficult to forecast the load of the upper and lower power supply areas. The invention adopts dual-path adaptive load forecasting compatible with top-level planning forecasting and bottom-level network self-checking. Atthe same time, the improved firefly algorithm and U-type self-calibration method are used to correlate the load status hierarchically. Combining the advantages of top-down and bottom-up load forecasting and distribution methods, the forecasting results are modified. The invention adopts two paths of load forecasting, distribution, checking and difference feedback back to the top layer for re-distribution, such as high-voltage distribution network supply area upward aggregation after self-forecasting and regional macro-forecasting downward distribution. After iteration, the error is smaller than the threshold value, a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN109242191A
source esp@cenet
subjects CALCULATING
COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title The invention relates to a dual-path adaptive load forecasting method for a substation supply area
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T01%3A03%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHANG%20AN&rft.date=2019-01-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109242191A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true