Steel structure modular construction method
The invention discloses a steel structure modular construction method. The construction method comprises the following steps that 1, a foundation is processed, foundation bolts are buried and positioned on the foundation, measurement is carried out for the first time, concrete pouring is carried out...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YIN PENGXIA CUI XIANGCHAO WANG LEI ZHANG TAO ZHANG YING CHEN YAN WANG XIAOBO REN HONGCHEN |
description | The invention discloses a steel structure modular construction method. The construction method comprises the following steps that 1, a foundation is processed, foundation bolts are buried and positioned on the foundation, measurement is carried out for the first time, concrete pouring is carried out after installation requirements are met, measurement is carried out for the second time after pouring is firm, and sizing blocks are installed on the foundation bolts after the installation requirements are met; 2, a base plate is installed on the foundation bolts through the sizing blocks; 3, a module center line serves as a component positioning reference line, and components are spliced into a modular installation unit; 4, a temporary supporting structure is arranged on a hoisting tool, thehoisting tool is adopted for hoisting and installing the modular installation unit on the base plate, and after the perpendicularity and the levelness are aligned and adjusted, fixed installation is carried out; 5, the modula |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109235903A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109235903A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109235903A3</originalsourceid><addsrcrecordid>eNrjZNAOLklNzVEoLikqTS4pLUpVyM1PKc1JLFJIzs-DCGbm5ynkppZk5KfwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DA0sjY1NLA2NHY2LUAACwbiog</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Steel structure modular construction method</title><source>esp@cenet</source><creator>YIN PENGXIA ; CUI XIANGCHAO ; WANG LEI ; ZHANG TAO ; ZHANG YING ; CHEN YAN ; WANG XIAOBO ; REN HONGCHEN</creator><creatorcontrib>YIN PENGXIA ; CUI XIANGCHAO ; WANG LEI ; ZHANG TAO ; ZHANG YING ; CHEN YAN ; WANG XIAOBO ; REN HONGCHEN</creatorcontrib><description>The invention discloses a steel structure modular construction method. The construction method comprises the following steps that 1, a foundation is processed, foundation bolts are buried and positioned on the foundation, measurement is carried out for the first time, concrete pouring is carried out after installation requirements are met, measurement is carried out for the second time after pouring is firm, and sizing blocks are installed on the foundation bolts after the installation requirements are met; 2, a base plate is installed on the foundation bolts through the sizing blocks; 3, a module center line serves as a component positioning reference line, and components are spliced into a modular installation unit; 4, a temporary supporting structure is arranged on a hoisting tool, thehoisting tool is adopted for hoisting and installing the modular installation unit on the base plate, and after the perpendicularity and the levelness are aligned and adjusted, fixed installation is carried out; 5, the modula</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190118&DB=EPODOC&CC=CN&NR=109235903A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190118&DB=EPODOC&CC=CN&NR=109235903A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YIN PENGXIA</creatorcontrib><creatorcontrib>CUI XIANGCHAO</creatorcontrib><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>ZHANG TAO</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>CHEN YAN</creatorcontrib><creatorcontrib>WANG XIAOBO</creatorcontrib><creatorcontrib>REN HONGCHEN</creatorcontrib><title>Steel structure modular construction method</title><description>The invention discloses a steel structure modular construction method. The construction method comprises the following steps that 1, a foundation is processed, foundation bolts are buried and positioned on the foundation, measurement is carried out for the first time, concrete pouring is carried out after installation requirements are met, measurement is carried out for the second time after pouring is firm, and sizing blocks are installed on the foundation bolts after the installation requirements are met; 2, a base plate is installed on the foundation bolts through the sizing blocks; 3, a module center line serves as a component positioning reference line, and components are spliced into a modular installation unit; 4, a temporary supporting structure is arranged on a hoisting tool, thehoisting tool is adopted for hoisting and installing the modular installation unit on the base plate, and after the perpendicularity and the levelness are aligned and adjusted, fixed installation is carried out; 5, the modula</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAOLklNzVEoLikqTS4pLUpVyM1PKc1JLFJIzs-DCGbm5ynkppZk5KfwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DA0sjY1NLA2NHY2LUAACwbiog</recordid><startdate>20190118</startdate><enddate>20190118</enddate><creator>YIN PENGXIA</creator><creator>CUI XIANGCHAO</creator><creator>WANG LEI</creator><creator>ZHANG TAO</creator><creator>ZHANG YING</creator><creator>CHEN YAN</creator><creator>WANG XIAOBO</creator><creator>REN HONGCHEN</creator><scope>EVB</scope></search><sort><creationdate>20190118</creationdate><title>Steel structure modular construction method</title><author>YIN PENGXIA ; CUI XIANGCHAO ; WANG LEI ; ZHANG TAO ; ZHANG YING ; CHEN YAN ; WANG XIAOBO ; REN HONGCHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109235903A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>YIN PENGXIA</creatorcontrib><creatorcontrib>CUI XIANGCHAO</creatorcontrib><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>ZHANG TAO</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>CHEN YAN</creatorcontrib><creatorcontrib>WANG XIAOBO</creatorcontrib><creatorcontrib>REN HONGCHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YIN PENGXIA</au><au>CUI XIANGCHAO</au><au>WANG LEI</au><au>ZHANG TAO</au><au>ZHANG YING</au><au>CHEN YAN</au><au>WANG XIAOBO</au><au>REN HONGCHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Steel structure modular construction method</title><date>2019-01-18</date><risdate>2019</risdate><abstract>The invention discloses a steel structure modular construction method. The construction method comprises the following steps that 1, a foundation is processed, foundation bolts are buried and positioned on the foundation, measurement is carried out for the first time, concrete pouring is carried out after installation requirements are met, measurement is carried out for the second time after pouring is firm, and sizing blocks are installed on the foundation bolts after the installation requirements are met; 2, a base plate is installed on the foundation bolts through the sizing blocks; 3, a module center line serves as a component positioning reference line, and components are spliced into a modular installation unit; 4, a temporary supporting structure is arranged on a hoisting tool, thehoisting tool is adopted for hoisting and installing the modular installation unit on the base plate, and after the perpendicularity and the levelness are aligned and adjusted, fixed installation is carried out; 5, the modula</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN109235903A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Steel structure modular construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T23%3A26%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YIN%20PENGXIA&rft.date=2019-01-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109235903A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |