Continuous construction method for aluminum alloy template for comprehensive pipe rack
The invention relates to underground comprehensive pipe rack construction, in particular to a continuous construction method for an aluminum alloy template for a comprehensive pipe rack. The continuous construction method comprises the following steps that A, first-time pouring construction of a fir...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG YING ZHANG LILI YANG BAOCANG |
description | The invention relates to underground comprehensive pipe rack construction, in particular to a continuous construction method for an aluminum alloy template for a comprehensive pipe rack. The continuous construction method comprises the following steps that A, first-time pouring construction of a first-section comprehensive pipe rack body is conducted; B, second-time pouring construction of the first-section comprehensive pipe rack body and first-time pouring construction of a second-section comprehensive pipe rack body are conducted at the same time; C, form removal of the first-section comprehensive pipe rack body is conducted; D, second-time pouring construction of the second-section comprehensive pipe rack body is conducted; and F, first-time pouring construction of a third-section comprehensive pipe rack body is conducted. According to the continuous construction method, the continuous cyclic work is achieved, rapid turnover construction is achieved, the construction speed is increased, the construction p |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108914965A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108914965A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108914965A3</originalsourceid><addsrcrecordid>eNqNijsKAjEQQNNYiHqH8QCCix_cUoJiZSW2S4izbDCZGZKJ4O1dxANYvQfvTc3dMmmgyrWAZyqaq9fABAl14Af0nMHFmsYljRL5DYpJolP8Ns9JMg5IJbwQJAhCdv45N5PexYKLH2dmeT7d7GWFwh0WcR4JtbPXZn1om2273x03_zwfu0Q6sA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Continuous construction method for aluminum alloy template for comprehensive pipe rack</title><source>esp@cenet</source><creator>ZHANG YING ; ZHANG LILI ; YANG BAOCANG</creator><creatorcontrib>ZHANG YING ; ZHANG LILI ; YANG BAOCANG</creatorcontrib><description>The invention relates to underground comprehensive pipe rack construction, in particular to a continuous construction method for an aluminum alloy template for a comprehensive pipe rack. The continuous construction method comprises the following steps that A, first-time pouring construction of a first-section comprehensive pipe rack body is conducted; B, second-time pouring construction of the first-section comprehensive pipe rack body and first-time pouring construction of a second-section comprehensive pipe rack body are conducted at the same time; C, form removal of the first-section comprehensive pipe rack body is conducted; D, second-time pouring construction of the second-section comprehensive pipe rack body is conducted; and F, first-time pouring construction of a third-section comprehensive pipe rack body is conducted. According to the continuous construction method, the continuous cyclic work is achieved, rapid turnover construction is achieved, the construction speed is increased, the construction p</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20181130&DB=EPODOC&CC=CN&NR=108914965A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20181130&DB=EPODOC&CC=CN&NR=108914965A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>ZHANG LILI</creatorcontrib><creatorcontrib>YANG BAOCANG</creatorcontrib><title>Continuous construction method for aluminum alloy template for comprehensive pipe rack</title><description>The invention relates to underground comprehensive pipe rack construction, in particular to a continuous construction method for an aluminum alloy template for a comprehensive pipe rack. The continuous construction method comprises the following steps that A, first-time pouring construction of a first-section comprehensive pipe rack body is conducted; B, second-time pouring construction of the first-section comprehensive pipe rack body and first-time pouring construction of a second-section comprehensive pipe rack body are conducted at the same time; C, form removal of the first-section comprehensive pipe rack body is conducted; D, second-time pouring construction of the second-section comprehensive pipe rack body is conducted; and F, first-time pouring construction of a third-section comprehensive pipe rack body is conducted. According to the continuous construction method, the continuous cyclic work is achieved, rapid turnover construction is achieved, the construction speed is increased, the construction p</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijsKAjEQQNNYiHqH8QCCix_cUoJiZSW2S4izbDCZGZKJ4O1dxANYvQfvTc3dMmmgyrWAZyqaq9fABAl14Af0nMHFmsYljRL5DYpJolP8Ns9JMg5IJbwQJAhCdv45N5PexYKLH2dmeT7d7GWFwh0WcR4JtbPXZn1om2273x03_zwfu0Q6sA</recordid><startdate>20181130</startdate><enddate>20181130</enddate><creator>ZHANG YING</creator><creator>ZHANG LILI</creator><creator>YANG BAOCANG</creator><scope>EVB</scope></search><sort><creationdate>20181130</creationdate><title>Continuous construction method for aluminum alloy template for comprehensive pipe rack</title><author>ZHANG YING ; ZHANG LILI ; YANG BAOCANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108914965A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>ZHANG LILI</creatorcontrib><creatorcontrib>YANG BAOCANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG YING</au><au>ZHANG LILI</au><au>YANG BAOCANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Continuous construction method for aluminum alloy template for comprehensive pipe rack</title><date>2018-11-30</date><risdate>2018</risdate><abstract>The invention relates to underground comprehensive pipe rack construction, in particular to a continuous construction method for an aluminum alloy template for a comprehensive pipe rack. The continuous construction method comprises the following steps that A, first-time pouring construction of a first-section comprehensive pipe rack body is conducted; B, second-time pouring construction of the first-section comprehensive pipe rack body and first-time pouring construction of a second-section comprehensive pipe rack body are conducted at the same time; C, form removal of the first-section comprehensive pipe rack body is conducted; D, second-time pouring construction of the second-section comprehensive pipe rack body is conducted; and F, first-time pouring construction of a third-section comprehensive pipe rack body is conducted. According to the continuous construction method, the continuous cyclic work is achieved, rapid turnover construction is achieved, the construction speed is increased, the construction p</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN108914965A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Continuous construction method for aluminum alloy template for comprehensive pipe rack |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-14T12%3A14%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20YING&rft.date=2018-11-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108914965A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |