Method for realizing quick and accurate connection of column and beam joints of building member
The invention relates to a method for realizing quick and accurate connection of columns and beam joints of building components, wherein a plurality of embedded bolts are arranged around the column joints of a reinforced concrete structure, an adjustable flange is arranged on the embedded bolts of t...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | XUE YULONG LIU SHUANG SHI YANG YANG QIAN LIU XUAN YANG SHENGJIE YANG ZHONGQUAN YANG YIZI |
description | The invention relates to a method for realizing quick and accurate connection of columns and beam joints of building components, wherein a plurality of embedded bolts are arranged around the column joints of a reinforced concrete structure, an adjustable flange is arranged on the embedded bolts of the joints, a pair of lug plates are arranged on the flanges, and the embedded bolts pass through thesmooth holes in the flanges; Friction gaskets are arranged on both sides of the flange; At both end of that longitudinal beam, flanges and lug plate are arranged, and light holes are arranged in thelug plate to correspond to the lug plate; Easy-to-disassemble formwork is arranged around the flange, and the flange, bolt and pin can be poured and plugged with concrete according to the need; Columns and longitudinal beams, Before the column is butted with the cross member, first loosen the front and rear nuts on the pre-embedded bolts of the column, align the flanges at the two ends of the longitudinal beam with a crane |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108894337A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108894337A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108894337A3</originalsourceid><addsrcrecordid>eNqNjD0KwkAQRtNYiHqH8QCCEsFYSlBstLJfJpuJju7OxP1pPL1GPIDVx-M9vnFhTpRu2kKnAQKh4xfLFZ6Z7QNQWkBrc8BEYFWEbGIV0O5DLnv5Fg2hh7uypDiYJrNrhw9PvqEwLUYdukiz306K-WF_qY8L6tVQ7NGSUDL1ebWsqu26LDe78p_mDVWLPK4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for realizing quick and accurate connection of column and beam joints of building member</title><source>esp@cenet</source><creator>XUE YULONG ; LIU SHUANG ; SHI YANG ; YANG QIAN ; LIU XUAN ; YANG SHENGJIE ; YANG ZHONGQUAN ; YANG YIZI</creator><creatorcontrib>XUE YULONG ; LIU SHUANG ; SHI YANG ; YANG QIAN ; LIU XUAN ; YANG SHENGJIE ; YANG ZHONGQUAN ; YANG YIZI</creatorcontrib><description>The invention relates to a method for realizing quick and accurate connection of columns and beam joints of building components, wherein a plurality of embedded bolts are arranged around the column joints of a reinforced concrete structure, an adjustable flange is arranged on the embedded bolts of the joints, a pair of lug plates are arranged on the flanges, and the embedded bolts pass through thesmooth holes in the flanges; Friction gaskets are arranged on both sides of the flange; At both end of that longitudinal beam, flanges and lug plate are arranged, and light holes are arranged in thelug plate to correspond to the lug plate; Easy-to-disassemble formwork is arranged around the flange, and the flange, bolt and pin can be poured and plugged with concrete according to the need; Columns and longitudinal beams, Before the column is butted with the cross member, first loosen the front and rear nuts on the pre-embedded bolts of the column, align the flanges at the two ends of the longitudinal beam with a crane</description><language>chi ; eng</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20181127&DB=EPODOC&CC=CN&NR=108894337A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20181127&DB=EPODOC&CC=CN&NR=108894337A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XUE YULONG</creatorcontrib><creatorcontrib>LIU SHUANG</creatorcontrib><creatorcontrib>SHI YANG</creatorcontrib><creatorcontrib>YANG QIAN</creatorcontrib><creatorcontrib>LIU XUAN</creatorcontrib><creatorcontrib>YANG SHENGJIE</creatorcontrib><creatorcontrib>YANG ZHONGQUAN</creatorcontrib><creatorcontrib>YANG YIZI</creatorcontrib><title>Method for realizing quick and accurate connection of column and beam joints of building member</title><description>The invention relates to a method for realizing quick and accurate connection of columns and beam joints of building components, wherein a plurality of embedded bolts are arranged around the column joints of a reinforced concrete structure, an adjustable flange is arranged on the embedded bolts of the joints, a pair of lug plates are arranged on the flanges, and the embedded bolts pass through thesmooth holes in the flanges; Friction gaskets are arranged on both sides of the flange; At both end of that longitudinal beam, flanges and lug plate are arranged, and light holes are arranged in thelug plate to correspond to the lug plate; Easy-to-disassemble formwork is arranged around the flange, and the flange, bolt and pin can be poured and plugged with concrete according to the need; Columns and longitudinal beams, Before the column is butted with the cross member, first loosen the front and rear nuts on the pre-embedded bolts of the column, align the flanges at the two ends of the longitudinal beam with a crane</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjD0KwkAQRtNYiHqH8QCCEsFYSlBstLJfJpuJju7OxP1pPL1GPIDVx-M9vnFhTpRu2kKnAQKh4xfLFZ6Z7QNQWkBrc8BEYFWEbGIV0O5DLnv5Fg2hh7uypDiYJrNrhw9PvqEwLUYdukiz306K-WF_qY8L6tVQ7NGSUDL1ebWsqu26LDe78p_mDVWLPK4</recordid><startdate>20181127</startdate><enddate>20181127</enddate><creator>XUE YULONG</creator><creator>LIU SHUANG</creator><creator>SHI YANG</creator><creator>YANG QIAN</creator><creator>LIU XUAN</creator><creator>YANG SHENGJIE</creator><creator>YANG ZHONGQUAN</creator><creator>YANG YIZI</creator><scope>EVB</scope></search><sort><creationdate>20181127</creationdate><title>Method for realizing quick and accurate connection of column and beam joints of building member</title><author>XUE YULONG ; LIU SHUANG ; SHI YANG ; YANG QIAN ; LIU XUAN ; YANG SHENGJIE ; YANG ZHONGQUAN ; YANG YIZI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108894337A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>XUE YULONG</creatorcontrib><creatorcontrib>LIU SHUANG</creatorcontrib><creatorcontrib>SHI YANG</creatorcontrib><creatorcontrib>YANG QIAN</creatorcontrib><creatorcontrib>LIU XUAN</creatorcontrib><creatorcontrib>YANG SHENGJIE</creatorcontrib><creatorcontrib>YANG ZHONGQUAN</creatorcontrib><creatorcontrib>YANG YIZI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XUE YULONG</au><au>LIU SHUANG</au><au>SHI YANG</au><au>YANG QIAN</au><au>LIU XUAN</au><au>YANG SHENGJIE</au><au>YANG ZHONGQUAN</au><au>YANG YIZI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for realizing quick and accurate connection of column and beam joints of building member</title><date>2018-11-27</date><risdate>2018</risdate><abstract>The invention relates to a method for realizing quick and accurate connection of columns and beam joints of building components, wherein a plurality of embedded bolts are arranged around the column joints of a reinforced concrete structure, an adjustable flange is arranged on the embedded bolts of the joints, a pair of lug plates are arranged on the flanges, and the embedded bolts pass through thesmooth holes in the flanges; Friction gaskets are arranged on both sides of the flange; At both end of that longitudinal beam, flanges and lug plate are arranged, and light holes are arranged in thelug plate to correspond to the lug plate; Easy-to-disassemble formwork is arranged around the flange, and the flange, bolt and pin can be poured and plugged with concrete according to the need; Columns and longitudinal beams, Before the column is butted with the cross member, first loosen the front and rear nuts on the pre-embedded bolts of the column, align the flanges at the two ends of the longitudinal beam with a crane</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN108894337A |
source | esp@cenet |
subjects | BUILDING CEILINGS FIXED CONSTRUCTIONS FLOORS GENERAL BUILDING CONSTRUCTIONS INSULATION OR OTHER PROTECTION OF BUILDINGS ROOFS WALLS, e.g. PARTITIONS |
title | Method for realizing quick and accurate connection of column and beam joints of building member |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T06%3A52%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XUE%20YULONG&rft.date=2018-11-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108894337A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |