Incremental launching construction method for building main span of cable-stayed bridge
The invention discloses an incremental launching construction method for building a main span of a cable-stayed bridge. The method comprises the following steps: (S1) incrementally launching a main beam from an approach bridge to the main span through a slide way; (S2) when the main beam is incremen...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!