Incremental launching construction method for building main span of cable-stayed bridge

The invention discloses an incremental launching construction method for building a main span of a cable-stayed bridge. The method comprises the following steps: (S1) incrementally launching a main beam from an approach bridge to the main span through a slide way; (S2) when the main beam is incremen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHENG WENCHAO, HUANG ZHENYU, CHEN GUOPING, XIE HONG, JI XIAOYONG, LIAO JIANHONG, LIU SHANJIAN, CHEN XI, HU JIANHUA, ZHANG GUIMING, HE NING, XIE LIXIN, LIU JIANHUA, XU ZHAOLING, LU SHANGWU, FANG ZHI, PENG XIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHENG WENCHAO
HUANG ZHENYU
CHEN GUOPING
XIE HONG
JI XIAOYONG
LIAO JIANHONG
LIU SHANJIAN
CHEN XI
HU JIANHUA
ZHANG GUIMING
HE NING
XIE LIXIN
LIU JIANHUA
XU ZHAOLING
LU SHANGWU
FANG ZHI
PENG XIN
description The invention discloses an incremental launching construction method for building a main span of a cable-stayed bridge. The method comprises the following steps: (S1) incrementally launching a main beam from an approach bridge to the main span through a slide way; (S2) when the main beam is incrementally launched to a position which passes through a main tower but not passes through the middle ofthe main span, building a process beam and a hanging rail system at two ends of the main tower, connecting the stay cable with the process beam, and longitudinally and transversely locking the processbeam and the main tower at the main tower, wherein the hanging rail system is connected with the main beam and the process beam; (S3) hanging the main beam below the process beam by virtue of the hanging rail system, and continuously carrying out incremental launching towards the middle of the main span; (S4) repeatedly carrying out the steps (S2) and (S3) until main spans at two ends of the mainbeam are closed and connec
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108570937A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108570937A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108570937A3</originalsourceid><addsrcrecordid>eNqNyz0KwkAQQOE0FqLeYTxAIBIkWkpQtLESLMPs7GyysDsb9qfw9ip4AKvXfG9ZPW9CkT1LRgcOi9BkZQQKknIslG0Q8JynoMGECKpYp7_AoxVIMwoEA4TKcZ0yvliDilaPvK4WBl3iza-rans5P_przXMY-DMSC-ehv--aw75rjm13av8xb5tPOkE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Incremental launching construction method for building main span of cable-stayed bridge</title><source>esp@cenet</source><creator>ZHENG WENCHAO ; HUANG ZHENYU ; CHEN GUOPING ; XIE HONG ; JI XIAOYONG ; LIAO JIANHONG ; LIU SHANJIAN ; CHEN XI ; HU JIANHUA ; ZHANG GUIMING ; HE NING ; XIE LIXIN ; LIU JIANHUA ; XU ZHAOLING ; LU SHANGWU ; FANG ZHI ; PENG XIN</creator><creatorcontrib>ZHENG WENCHAO ; HUANG ZHENYU ; CHEN GUOPING ; XIE HONG ; JI XIAOYONG ; LIAO JIANHONG ; LIU SHANJIAN ; CHEN XI ; HU JIANHUA ; ZHANG GUIMING ; HE NING ; XIE LIXIN ; LIU JIANHUA ; XU ZHAOLING ; LU SHANGWU ; FANG ZHI ; PENG XIN</creatorcontrib><description>The invention discloses an incremental launching construction method for building a main span of a cable-stayed bridge. The method comprises the following steps: (S1) incrementally launching a main beam from an approach bridge to the main span through a slide way; (S2) when the main beam is incrementally launched to a position which passes through a main tower but not passes through the middle ofthe main span, building a process beam and a hanging rail system at two ends of the main tower, connecting the stay cable with the process beam, and longitudinally and transversely locking the processbeam and the main tower at the main tower, wherein the hanging rail system is connected with the main beam and the process beam; (S3) hanging the main beam below the process beam by virtue of the hanging rail system, and continuously carrying out incremental launching towards the middle of the main span; (S4) repeatedly carrying out the steps (S2) and (S3) until main spans at two ends of the mainbeam are closed and connec</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180925&amp;DB=EPODOC&amp;CC=CN&amp;NR=108570937A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180925&amp;DB=EPODOC&amp;CC=CN&amp;NR=108570937A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHENG WENCHAO</creatorcontrib><creatorcontrib>HUANG ZHENYU</creatorcontrib><creatorcontrib>CHEN GUOPING</creatorcontrib><creatorcontrib>XIE HONG</creatorcontrib><creatorcontrib>JI XIAOYONG</creatorcontrib><creatorcontrib>LIAO JIANHONG</creatorcontrib><creatorcontrib>LIU SHANJIAN</creatorcontrib><creatorcontrib>CHEN XI</creatorcontrib><creatorcontrib>HU JIANHUA</creatorcontrib><creatorcontrib>ZHANG GUIMING</creatorcontrib><creatorcontrib>HE NING</creatorcontrib><creatorcontrib>XIE LIXIN</creatorcontrib><creatorcontrib>LIU JIANHUA</creatorcontrib><creatorcontrib>XU ZHAOLING</creatorcontrib><creatorcontrib>LU SHANGWU</creatorcontrib><creatorcontrib>FANG ZHI</creatorcontrib><creatorcontrib>PENG XIN</creatorcontrib><title>Incremental launching construction method for building main span of cable-stayed bridge</title><description>The invention discloses an incremental launching construction method for building a main span of a cable-stayed bridge. The method comprises the following steps: (S1) incrementally launching a main beam from an approach bridge to the main span through a slide way; (S2) when the main beam is incrementally launched to a position which passes through a main tower but not passes through the middle ofthe main span, building a process beam and a hanging rail system at two ends of the main tower, connecting the stay cable with the process beam, and longitudinally and transversely locking the processbeam and the main tower at the main tower, wherein the hanging rail system is connected with the main beam and the process beam; (S3) hanging the main beam below the process beam by virtue of the hanging rail system, and continuously carrying out incremental launching towards the middle of the main span; (S4) repeatedly carrying out the steps (S2) and (S3) until main spans at two ends of the mainbeam are closed and connec</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyz0KwkAQQOE0FqLeYTxAIBIkWkpQtLESLMPs7GyysDsb9qfw9ip4AKvXfG9ZPW9CkT1LRgcOi9BkZQQKknIslG0Q8JynoMGECKpYp7_AoxVIMwoEA4TKcZ0yvliDilaPvK4WBl3iza-rans5P_przXMY-DMSC-ehv--aw75rjm13av8xb5tPOkE</recordid><startdate>20180925</startdate><enddate>20180925</enddate><creator>ZHENG WENCHAO</creator><creator>HUANG ZHENYU</creator><creator>CHEN GUOPING</creator><creator>XIE HONG</creator><creator>JI XIAOYONG</creator><creator>LIAO JIANHONG</creator><creator>LIU SHANJIAN</creator><creator>CHEN XI</creator><creator>HU JIANHUA</creator><creator>ZHANG GUIMING</creator><creator>HE NING</creator><creator>XIE LIXIN</creator><creator>LIU JIANHUA</creator><creator>XU ZHAOLING</creator><creator>LU SHANGWU</creator><creator>FANG ZHI</creator><creator>PENG XIN</creator><scope>EVB</scope></search><sort><creationdate>20180925</creationdate><title>Incremental launching construction method for building main span of cable-stayed bridge</title><author>ZHENG WENCHAO ; HUANG ZHENYU ; CHEN GUOPING ; XIE HONG ; JI XIAOYONG ; LIAO JIANHONG ; LIU SHANJIAN ; CHEN XI ; HU JIANHUA ; ZHANG GUIMING ; HE NING ; XIE LIXIN ; LIU JIANHUA ; XU ZHAOLING ; LU SHANGWU ; FANG ZHI ; PENG XIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108570937A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHENG WENCHAO</creatorcontrib><creatorcontrib>HUANG ZHENYU</creatorcontrib><creatorcontrib>CHEN GUOPING</creatorcontrib><creatorcontrib>XIE HONG</creatorcontrib><creatorcontrib>JI XIAOYONG</creatorcontrib><creatorcontrib>LIAO JIANHONG</creatorcontrib><creatorcontrib>LIU SHANJIAN</creatorcontrib><creatorcontrib>CHEN XI</creatorcontrib><creatorcontrib>HU JIANHUA</creatorcontrib><creatorcontrib>ZHANG GUIMING</creatorcontrib><creatorcontrib>HE NING</creatorcontrib><creatorcontrib>XIE LIXIN</creatorcontrib><creatorcontrib>LIU JIANHUA</creatorcontrib><creatorcontrib>XU ZHAOLING</creatorcontrib><creatorcontrib>LU SHANGWU</creatorcontrib><creatorcontrib>FANG ZHI</creatorcontrib><creatorcontrib>PENG XIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHENG WENCHAO</au><au>HUANG ZHENYU</au><au>CHEN GUOPING</au><au>XIE HONG</au><au>JI XIAOYONG</au><au>LIAO JIANHONG</au><au>LIU SHANJIAN</au><au>CHEN XI</au><au>HU JIANHUA</au><au>ZHANG GUIMING</au><au>HE NING</au><au>XIE LIXIN</au><au>LIU JIANHUA</au><au>XU ZHAOLING</au><au>LU SHANGWU</au><au>FANG ZHI</au><au>PENG XIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Incremental launching construction method for building main span of cable-stayed bridge</title><date>2018-09-25</date><risdate>2018</risdate><abstract>The invention discloses an incremental launching construction method for building a main span of a cable-stayed bridge. The method comprises the following steps: (S1) incrementally launching a main beam from an approach bridge to the main span through a slide way; (S2) when the main beam is incrementally launched to a position which passes through a main tower but not passes through the middle ofthe main span, building a process beam and a hanging rail system at two ends of the main tower, connecting the stay cable with the process beam, and longitudinally and transversely locking the processbeam and the main tower at the main tower, wherein the hanging rail system is connected with the main beam and the process beam; (S3) hanging the main beam below the process beam by virtue of the hanging rail system, and continuously carrying out incremental launching towards the middle of the main span; (S4) repeatedly carrying out the steps (S2) and (S3) until main spans at two ends of the mainbeam are closed and connec</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN108570937A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Incremental launching construction method for building main span of cable-stayed bridge
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T14%3A47%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHENG%20WENCHAO&rft.date=2018-09-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108570937A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true