Earthwork standard room reinforcement high-and-deep slope and construction method thereof

The invention discloses an earthwork standard room reinforcement high-and-deep slope and a construction method thereof. The construction method comprises the following steps of firstly, excavating a basement, mixing cement and sand gravels, and carrying out pouring to form a foundation layer; second...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG FEI, XIA SHUAISHUAI, ZENG SIPING, CAO GENGREN, MA JIANWEI, CHEN JUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SONG FEI
XIA SHUAISHUAI
ZENG SIPING
CAO GENGREN
MA JIANWEI
CHEN JUN
description The invention discloses an earthwork standard room reinforcement high-and-deep slope and a construction method thereof. The construction method comprises the following steps of firstly, excavating a basement, mixing cement and sand gravels, and carrying out pouring to form a foundation layer; secondly, spreading an earthwork standard room on the foundation, and filling the earthwork standard roomwith cement and sand gravels; thirdly, carrying out earth filling with a loader after carrying out filling of each layer of filler; fourthly, backwards shrinking the earthwork standard room for ten centimeters after every layer is added upwards, spreading another earthwork standard room on a cement and gravel layer, filling the earthwork stand room with sand gravels which are used as a wall body drainage layer, and filling the earthwork stand room with one sand gravel drainage layer every two centimeters in the earthwork standard room upwards from the wall body drainage layer; fifthly, arranging first lacing girdles a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108517882A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108517882A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108517882A3</originalsourceid><addsrcrecordid>eNqNirEKwjAURbs4iPoPzw8IWEXsKqXi5OTiVEJya4JtXnh54u_bwQ9wOhzOWVaPzoqGD8uLitrkrXgS5okEMQ0sDhOSUojPYOZsPJCpjJxBs5LjVFTeTiMnmqCBPWmAgId1tRjsWLD5cVVtL929vRpk7lGydUjQvr3Vu-ZYn5pmfz7883wBPJQ7YA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Earthwork standard room reinforcement high-and-deep slope and construction method thereof</title><source>esp@cenet</source><creator>SONG FEI ; XIA SHUAISHUAI ; ZENG SIPING ; CAO GENGREN ; MA JIANWEI ; CHEN JUN</creator><creatorcontrib>SONG FEI ; XIA SHUAISHUAI ; ZENG SIPING ; CAO GENGREN ; MA JIANWEI ; CHEN JUN</creatorcontrib><description>The invention discloses an earthwork standard room reinforcement high-and-deep slope and a construction method thereof. The construction method comprises the following steps of firstly, excavating a basement, mixing cement and sand gravels, and carrying out pouring to form a foundation layer; secondly, spreading an earthwork standard room on the foundation, and filling the earthwork standard roomwith cement and sand gravels; thirdly, carrying out earth filling with a loader after carrying out filling of each layer of filler; fourthly, backwards shrinking the earthwork standard room for ten centimeters after every layer is added upwards, spreading another earthwork standard room on a cement and gravel layer, filling the earthwork stand room with sand gravels which are used as a wall body drainage layer, and filling the earthwork stand room with one sand gravel drainage layer every two centimeters in the earthwork standard room upwards from the wall body drainage layer; fifthly, arranging first lacing girdles a</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180911&amp;DB=EPODOC&amp;CC=CN&amp;NR=108517882A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180911&amp;DB=EPODOC&amp;CC=CN&amp;NR=108517882A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SONG FEI</creatorcontrib><creatorcontrib>XIA SHUAISHUAI</creatorcontrib><creatorcontrib>ZENG SIPING</creatorcontrib><creatorcontrib>CAO GENGREN</creatorcontrib><creatorcontrib>MA JIANWEI</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><title>Earthwork standard room reinforcement high-and-deep slope and construction method thereof</title><description>The invention discloses an earthwork standard room reinforcement high-and-deep slope and a construction method thereof. The construction method comprises the following steps of firstly, excavating a basement, mixing cement and sand gravels, and carrying out pouring to form a foundation layer; secondly, spreading an earthwork standard room on the foundation, and filling the earthwork standard roomwith cement and sand gravels; thirdly, carrying out earth filling with a loader after carrying out filling of each layer of filler; fourthly, backwards shrinking the earthwork standard room for ten centimeters after every layer is added upwards, spreading another earthwork standard room on a cement and gravel layer, filling the earthwork stand room with sand gravels which are used as a wall body drainage layer, and filling the earthwork stand room with one sand gravel drainage layer every two centimeters in the earthwork standard room upwards from the wall body drainage layer; fifthly, arranging first lacing girdles a</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKwjAURbs4iPoPzw8IWEXsKqXi5OTiVEJya4JtXnh54u_bwQ9wOhzOWVaPzoqGD8uLitrkrXgS5okEMQ0sDhOSUojPYOZsPJCpjJxBs5LjVFTeTiMnmqCBPWmAgId1tRjsWLD5cVVtL929vRpk7lGydUjQvr3Vu-ZYn5pmfz7883wBPJQ7YA</recordid><startdate>20180911</startdate><enddate>20180911</enddate><creator>SONG FEI</creator><creator>XIA SHUAISHUAI</creator><creator>ZENG SIPING</creator><creator>CAO GENGREN</creator><creator>MA JIANWEI</creator><creator>CHEN JUN</creator><scope>EVB</scope></search><sort><creationdate>20180911</creationdate><title>Earthwork standard room reinforcement high-and-deep slope and construction method thereof</title><author>SONG FEI ; XIA SHUAISHUAI ; ZENG SIPING ; CAO GENGREN ; MA JIANWEI ; CHEN JUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108517882A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SONG FEI</creatorcontrib><creatorcontrib>XIA SHUAISHUAI</creatorcontrib><creatorcontrib>ZENG SIPING</creatorcontrib><creatorcontrib>CAO GENGREN</creatorcontrib><creatorcontrib>MA JIANWEI</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SONG FEI</au><au>XIA SHUAISHUAI</au><au>ZENG SIPING</au><au>CAO GENGREN</au><au>MA JIANWEI</au><au>CHEN JUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Earthwork standard room reinforcement high-and-deep slope and construction method thereof</title><date>2018-09-11</date><risdate>2018</risdate><abstract>The invention discloses an earthwork standard room reinforcement high-and-deep slope and a construction method thereof. The construction method comprises the following steps of firstly, excavating a basement, mixing cement and sand gravels, and carrying out pouring to form a foundation layer; secondly, spreading an earthwork standard room on the foundation, and filling the earthwork standard roomwith cement and sand gravels; thirdly, carrying out earth filling with a loader after carrying out filling of each layer of filler; fourthly, backwards shrinking the earthwork standard room for ten centimeters after every layer is added upwards, spreading another earthwork standard room on a cement and gravel layer, filling the earthwork stand room with sand gravels which are used as a wall body drainage layer, and filling the earthwork stand room with one sand gravel drainage layer every two centimeters in the earthwork standard room upwards from the wall body drainage layer; fifthly, arranging first lacing girdles a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN108517882A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Earthwork standard room reinforcement high-and-deep slope and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T10%3A38%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SONG%20FEI&rft.date=2018-09-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108517882A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true