Construction method of railway single-track tunnel with central deeply-buried ditch in high and cold area
The invention discloses a construction method of a railway single-track tunnel with a central deeply-buried ditch in a high and cold area. The construction method includes: performing staking out in survey to determine the specific position of the central deeply-buried ditch; performing drilling and...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | JIA BIN WU JINGUANG CHEN BIN ZHANG DONG QIN FAZE WEI KUIFEI YIN AIGUO GUO LIMING LI YADONG ZHANG FAN |
description | The invention discloses a construction method of a railway single-track tunnel with a central deeply-buried ditch in a high and cold area. The construction method includes: performing staking out in survey to determine the specific position of the central deeply-buried ditch; performing drilling and blasting on a tunnel face, synchronously drilling vertical presplit holes, transverse auxiliary holes and peripheral holes in the to-be-excavated area of the excavation face of the central deeply-buried ditch, and then performing excavation; performing tunnel face residue discharge and tunnel primary support, and performing central deeply-buried ditch residue discharge and construction; repeating the steps above for 3-5 times, and performing inverted arch construction once when the excavation face of the central deeply-buried ditch advances 9-12m; performing circulating construction according to the steps above until the construction of the whole tunnel is completed. The construction methodhas the advantages that |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108457659A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108457659A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108457659A3</originalsourceid><addsrcrecordid>eNqNjEsKwjAQQLtxIeodxgMUFK2fpRTFlSv3ZUymzWCchGRK6e3twgO4evB4vHnBdZCsqTfKQeBD6oKF0EJC9gOOkFk6T6UmNG_QXoQ8DKwODMkkPVii6Mfy1ScmC5bVOGABx50DFAsmeAuYCJfFrEWfafXjoljfrs_6XlIMDeWI05G0qR_bzWlfHQ_V-bL7p_kCYKRAnw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of railway single-track tunnel with central deeply-buried ditch in high and cold area</title><source>esp@cenet</source><creator>JIA BIN ; WU JINGUANG ; CHEN BIN ; ZHANG DONG ; QIN FAZE ; WEI KUIFEI ; YIN AIGUO ; GUO LIMING ; LI YADONG ; ZHANG FAN</creator><creatorcontrib>JIA BIN ; WU JINGUANG ; CHEN BIN ; ZHANG DONG ; QIN FAZE ; WEI KUIFEI ; YIN AIGUO ; GUO LIMING ; LI YADONG ; ZHANG FAN</creatorcontrib><description>The invention discloses a construction method of a railway single-track tunnel with a central deeply-buried ditch in a high and cold area. The construction method includes: performing staking out in survey to determine the specific position of the central deeply-buried ditch; performing drilling and blasting on a tunnel face, synchronously drilling vertical presplit holes, transverse auxiliary holes and peripheral holes in the to-be-excavated area of the excavation face of the central deeply-buried ditch, and then performing excavation; performing tunnel face residue discharge and tunnel primary support, and performing central deeply-buried ditch residue discharge and construction; repeating the steps above for 3-5 times, and performing inverted arch construction once when the excavation face of the central deeply-buried ditch advances 9-12m; performing circulating construction according to the steps above until the construction of the whole tunnel is completed. The construction methodhas the advantages that</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180828&DB=EPODOC&CC=CN&NR=108457659A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180828&DB=EPODOC&CC=CN&NR=108457659A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIA BIN</creatorcontrib><creatorcontrib>WU JINGUANG</creatorcontrib><creatorcontrib>CHEN BIN</creatorcontrib><creatorcontrib>ZHANG DONG</creatorcontrib><creatorcontrib>QIN FAZE</creatorcontrib><creatorcontrib>WEI KUIFEI</creatorcontrib><creatorcontrib>YIN AIGUO</creatorcontrib><creatorcontrib>GUO LIMING</creatorcontrib><creatorcontrib>LI YADONG</creatorcontrib><creatorcontrib>ZHANG FAN</creatorcontrib><title>Construction method of railway single-track tunnel with central deeply-buried ditch in high and cold area</title><description>The invention discloses a construction method of a railway single-track tunnel with a central deeply-buried ditch in a high and cold area. The construction method includes: performing staking out in survey to determine the specific position of the central deeply-buried ditch; performing drilling and blasting on a tunnel face, synchronously drilling vertical presplit holes, transverse auxiliary holes and peripheral holes in the to-be-excavated area of the excavation face of the central deeply-buried ditch, and then performing excavation; performing tunnel face residue discharge and tunnel primary support, and performing central deeply-buried ditch residue discharge and construction; repeating the steps above for 3-5 times, and performing inverted arch construction once when the excavation face of the central deeply-buried ditch advances 9-12m; performing circulating construction according to the steps above until the construction of the whole tunnel is completed. The construction methodhas the advantages that</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjEsKwjAQQLtxIeodxgMUFK2fpRTFlSv3ZUymzWCchGRK6e3twgO4evB4vHnBdZCsqTfKQeBD6oKF0EJC9gOOkFk6T6UmNG_QXoQ8DKwODMkkPVii6Mfy1ScmC5bVOGABx50DFAsmeAuYCJfFrEWfafXjoljfrs_6XlIMDeWI05G0qR_bzWlfHQ_V-bL7p_kCYKRAnw</recordid><startdate>20180828</startdate><enddate>20180828</enddate><creator>JIA BIN</creator><creator>WU JINGUANG</creator><creator>CHEN BIN</creator><creator>ZHANG DONG</creator><creator>QIN FAZE</creator><creator>WEI KUIFEI</creator><creator>YIN AIGUO</creator><creator>GUO LIMING</creator><creator>LI YADONG</creator><creator>ZHANG FAN</creator><scope>EVB</scope></search><sort><creationdate>20180828</creationdate><title>Construction method of railway single-track tunnel with central deeply-buried ditch in high and cold area</title><author>JIA BIN ; WU JINGUANG ; CHEN BIN ; ZHANG DONG ; QIN FAZE ; WEI KUIFEI ; YIN AIGUO ; GUO LIMING ; LI YADONG ; ZHANG FAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108457659A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>JIA BIN</creatorcontrib><creatorcontrib>WU JINGUANG</creatorcontrib><creatorcontrib>CHEN BIN</creatorcontrib><creatorcontrib>ZHANG DONG</creatorcontrib><creatorcontrib>QIN FAZE</creatorcontrib><creatorcontrib>WEI KUIFEI</creatorcontrib><creatorcontrib>YIN AIGUO</creatorcontrib><creatorcontrib>GUO LIMING</creatorcontrib><creatorcontrib>LI YADONG</creatorcontrib><creatorcontrib>ZHANG FAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIA BIN</au><au>WU JINGUANG</au><au>CHEN BIN</au><au>ZHANG DONG</au><au>QIN FAZE</au><au>WEI KUIFEI</au><au>YIN AIGUO</au><au>GUO LIMING</au><au>LI YADONG</au><au>ZHANG FAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of railway single-track tunnel with central deeply-buried ditch in high and cold area</title><date>2018-08-28</date><risdate>2018</risdate><abstract>The invention discloses a construction method of a railway single-track tunnel with a central deeply-buried ditch in a high and cold area. The construction method includes: performing staking out in survey to determine the specific position of the central deeply-buried ditch; performing drilling and blasting on a tunnel face, synchronously drilling vertical presplit holes, transverse auxiliary holes and peripheral holes in the to-be-excavated area of the excavation face of the central deeply-buried ditch, and then performing excavation; performing tunnel face residue discharge and tunnel primary support, and performing central deeply-buried ditch residue discharge and construction; repeating the steps above for 3-5 times, and performing inverted arch construction once when the excavation face of the central deeply-buried ditch advances 9-12m; performing circulating construction according to the steps above until the construction of the whole tunnel is completed. The construction methodhas the advantages that</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN108457659A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS SHAFTS TUNNELS |
title | Construction method of railway single-track tunnel with central deeply-buried ditch in high and cold area |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T07%3A44%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIA%20BIN&rft.date=2018-08-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108457659A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |